Michael Anson, Kai-Chi Thomas Ying and Ming-Fung Francis Siu

For parts of the time on a typical construction site concrete pour, the site placing crew is idle waiting for the arrival of the next truckmixer delivery, whereas for other…

Abstract

Purpose

For parts of the time on a typical construction site concrete pour, the site placing crew is idle waiting for the arrival of the next truckmixer delivery, whereas for other periods, truckmixers are idle on site waiting to be unloaded. Ideally, the work of the crew should be continuous, with successive truckmixers arriving on site just as the preceding truckmixer has been emptied, to provide perfect matching between site and concrete plant resources. However, in reality, sample benchmark data, representing 118 concrete pours of 69 m3 average volume, illustrate that significant wastage occurs of both crew and truckmixer time. The purpose of this paper is to present and explain the characteristics of the wastage pattern observed and provide further understanding of the effects of the factors affecting the productivity of this everyday routine site concreting system.

Design/methodology/approach

Analytical algebraic models have been developed applicable to both serial and circulating truckmixer dispatch policies. The models connect crew idle time, truckmixer waiting time, truckmixer round trip time, truckmixer unloading time and truckmixer numbers. The truckmixer dispatch interval is another parameter included in the serial dispatch model. The models illustrate that perfect resource matching cannot be expected in general, such is the sensitivity of the system to the values applying to those parameters. The models are directly derived from theoretical truckmixer and crew placing time-based flow charts, which graphically depict crew and truckmixer idle times as affected by truckmixer emptying times and other relevant parameters.

Findings

The models successfully represent the magnitudes of the resource wastage seen in real life but fail to mirror the wastage distribution of crew and truckmixer time for the 118 pour benchmark. When augmented to include the simulation of stochastic activity durations, however, the models produce pour combinations of crew and truckmixer wastage that do mirror those of the benchmark.

Originality/value

The basic contribution of the paper consists of the proposed analytical models themselves, and their augmented versions, which describe the site and truckmixer resource wastage characteristics actually observed in practice. A further contribution is the step this makes towards understanding why such an everyday construction process is so apparently wasteful of resources.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 23 January 2021

Ming Fung Francis Siu, Joseph Lai, Yi Sun and Michael Anson

279

Abstract

Details

Facilities, vol. 39 no. 1/2
Type: Research Article
ISSN: 0263-2772

Content available
Book part
Publication date: 10 November 2021

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Article
Publication date: 1 May 1984

Things seem to be going desperately wrong with the concept of the “brave new world” predicted by the starry‐eyed optimists after the Second World War finally came to an end. To…

Abstract

Things seem to be going desperately wrong with the concept of the “brave new world” predicted by the starry‐eyed optimists after the Second World War finally came to an end. To those who listen only to what they want to hear, see everything, not as it is, but as they would like it to be, a new society could be initiated and the lusty infant would emerge as a paragon for all the world to follow. The new society in truth never really got off the ground the biggest mistake of all was to cushion millions of people against the results of their own folly; to shelter them from the blasts of the ensuing economic climate. The sheltered ones were not necessarily the ordinary mass of people; many in fact were the victims and suffered the consequences. And now that the state has reached a massive crescendo, many are suffering profoundly. The big nationalised industries and vast services, such as the national health service, education, where losses in the case of the first are met by Government millions, requests to trim the extravagant spending is akin to sacrilege in the latter, have removed such terms as thrift, careful spending, value for money from the vocabulary.

Details

British Food Journal, vol. 86 no. 5
Type: Research Article
ISSN: 0007-070X

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

1 – 10 of 78