Article
Publication date: 18 July 2019

Muhammad Irfan, Muhammad Jamaluddin Thaheem, Hamza Farooq Gabriel, Muhammad Sohail Anwar Malik and Abdur Rehman Nasir

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this…

1970

Abstract

Purpose

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this purpose, the most significant project constraints and factors that cause stakeholder conflicts found in the literature are measured.

Design/methodology/approach

Factors causing stakeholder conflicts and project constraints are extracted through a content analysis of the published literature. Further, a questionnaire survey is conducted involving 170 professionals to assess the effect of conflicts on project constraints. Finally, to obtain a more objective assessment, a statistical model is developed, and to highlight the most severe factors causing conflict and impacting project constraints, ordinal regression analysis is performed.

Findings

The results show that in the construction industry, all project constraints are affected by stakeholder conflicts. Factors that result in stakeholder conflicts indicated a positive relationship with cost, time and resources. This means that any increase or decrease in the effect of stakeholder conflicts will directly influence these three project constraints. Similarly, a negative relationship was observed between stakeholder conflicts and quality, workforce productivity, protection of environment and safety regulations in the construction industry, indicating that increase in the effect of stakeholder conflicts will decrease these four project constraints and vice versa. The results for cumulative ordinal regression model highlight that lack of communication, poor quality of completed works and change orders and rework have intense effects on project constraints collectively.

Originality/value

A small number of studies have been undertaken to examine the emergence of project constraints in the developing countries. And even more, its relationship with stakeholder conflicts in the construction industry is limited. This research highlights the most significant project constraints and factors that result in stakeholder conflicts in the construction industry. Therefore, this study adds to the existing body of knowledge by developing an ordinal regression model that will help decision-makers and top management control this enigma of stakeholder conflicts in the construction industry.

Details

International Journal of Conflict Management, vol. 30 no. 4
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 18 May 2020

Desmond Ng, Harvey S. James Jr and Peter G. Klein

As the prioritization of family goals depends on the resolution of family conflict, this study's purpose is to explain how a dominant coalition (DC) of parental family members…

Abstract

Purpose

As the prioritization of family goals depends on the resolution of family conflict, this study's purpose is to explain how a dominant coalition (DC) of parental family members prioritizes their family economic and non-economic goals when faced with different types of family conflict.

Design/methodology/approach

A conceptual framework is developed drawing on a socio-cognitive approach to explain a family's goal formation process. This socio-cognitive approach extends the stakeholder salience underpinnings of family influence/essence theory. It shows that family conflict arises from the complex and novel social settings of a family business and that a DC prioritizes their family's goals by drawing on heuristic biases to resolve such family conflict.

Findings

A key finding of this study is the introduction of a distinct type of agency to family influence/essence research. Unlike the salient explanations, a family's goal formulation process is attributed to a DC's heuristic response in resolving their family business conflict.

Originality/value

Scholars have called for a greater need to investigate the social and cognitive underpinnings of a family's goal formation process. While the social settings of a family business are often explained in terms of family conflict, an understanding of the sources of such conflict and their resolution have received limited attention. This study opens new avenues to understanding the sources of such family conflict and the cognitive mechanisms needed to overcome them. This understanding is critical not only to the prioritization of a family's goals but also to the idea that “influence” defines the essence of a family business.

Details

Journal of Small Business and Enterprise Development, vol. 27 no. 3
Type: Research Article
ISSN: 1462-6004

Keywords

Article
Publication date: 21 December 2023

Libiao Bai, Xuyang Zhao, ShuYun Kang, Yiming Ma and BingBing Zhang

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions…

Abstract

Purpose

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions may lead to conflict risks. These conflict risks change dynamically with different stages of the PP life cycle, increasing the challenge of PP risk management. Existing conflict risk research mainly focuses on source identification but lacks risk assessment work. To better manage the stakeholder conflict risks (SCRs) of R&D PPs, this study employs the dynamic Bayesian network (DBN) to construct its dynamic assessment model.

Design/methodology/approach

This study constructs a DBN model to assess the SCRs in R&D PP. First, an indicator system of SCRs is constructed from the life cycle perspective. Then, the risk relationships within each R&D PPs life cycle stage are identified via interpretative structural modeling (ISM). The prior and conditional probabilities of risks are obtained by expert judgment and Monte Carlo simulation (MCS). Finally, crucial SCRs at each stage are identified utilizing propagation analysis, and the corresponding risk responses are proposed.

Findings

The results of the study identify the crucial risks at each stage. Also, for the crucial risks, this study suggests appropriate risk response strategies to help managers better perform risk response activities.

Originality/value

This study dynamically assesses the stakeholder conflict risks in R&D PPs from a life-cycle perspective, extending the stakeholder risk management research. Meanwhile, the crucial risks are identified at each stage accordingly, providing managerial insights for R&D PPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2019

Fangwei Zhu, Mouxuan Sun, Linzhuo Wang, Xiuxia Sun and Miao Yu

The complexity caused by conflicting values of stakeholders is a critical issue influencing the performance and sustainability of stock public–private partnership (SPPP) projects…

Abstract

Purpose

The complexity caused by conflicting values of stakeholders is a critical issue influencing the performance and sustainability of stock public–private partnership (SPPP) projects, which is a special type of public–private partnership (PPP) project in China. The purpose of this paper is to focus on value conflicts between local government and private sector, which are two major stakeholders in SPPP projects, and investigate exchange rules to resolve value conflicts.

Design/methodology/approach

Using a mixed method approach, 55 semi-structured interviews were conducted for 15 stakeholders involved in a representative SPPP project. Social network analysis was then adopted to outline the value conflict network based on data drawn from focus group discussions. Finally, 24 value conflicts between local government and private sector were analyzed through another 13 semi-structured interviews in an abductive approach.

Findings

Results show that value conflicts between local government and private sector are dynamic and intertwined within and across three project phases, based on which six exchange rules, rationality, Altruism, power consistency, competition, group gain and reciprocity, are identified. Two sets of situational factors which potentially influence exchange rules adopted by the two parties are revealed, namely, urgency and professionality for local government and short-term interests and long-term interests for private sector. A summary of paired exchange rules is provided to predict if value conflicts between the two major stakeholders will be resolved or not.

Research limitations/implications

Theoretical implications are twofold. First, the results provide a contribution to PPP project management by investigating value conflicts between local government and private sector, which deepen the understanding on the unique characteristics of SPPP projects. Second, the findings contribute to a comprehensive understanding of social exchange theory by suggesting a summary of condition-based and pair-based exchange rules.

Originality/value

One strength of the study is in the concentrated analysis of a single case which allows for a deep understanding of value complexity between local government and private sector in SPPP projects from a dynamic and networked perspective. A guideline is provided for both parties when a value conflict is found hard to resolve. Besides, this study is also among the first that addresses value issues in SPPP projects.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 December 2019

Guangdong Wu, Zhibin Hu, Junwei Zheng, Xianbo Zhao and Jian Zuo

The purpose of this paper is to investigate the relationships between structure characteristics of project network, types of conflicts and project success.

1037

Abstract

Purpose

The purpose of this paper is to investigate the relationships between structure characteristics of project network, types of conflicts and project success.

Design/methodology/approach

Network density and centrality were used to reflect the structure characteristics of project network. This study collected 254 valid responses from construction professionals (including project managers, department managers and project engineers) via a questionnaire survey and analyzed the data using structural equation modeling and bootstrapping techniques.

Findings

The results showed that network centrality of project stakeholders negatively affected project success, whereas the effect of network density on project success was non-significant. The network density was positively related to task conflict, whereas negatively related to process and relationship conflict. Network centrality was positively related to relationship conflict and had negative effects on task and process conflict. Project conflicts served as the mediator, weakening the relationship between network structure characteristics and project success.

Research limitations/implications

This study provides direction for project managers and other stakeholders (e.g. owners, contractors and subcontractors) to appropriately establish social ties and manage conflicts to achieve project success. However, the potential influence of conflict transformation on project success, the dynamic nature of project networks and the network diagram were not addressed in the context of diverse culture. The future research should cover different stakeholders in order to get an integrative understanding of project networks and collect data from different cultural and industrial characteristics, extending and verifying the results.

Originality/value

The outcomes of the study provide evidence in regard to social network ties governance, which is comprised by the important or representative stakeholders, being a part of the effective strategy in improving project success. This study also contributes to the knowledge of conflict management in the project context, revealing the positive and negative of project conflicts and enriching the current understandings of the underlying mechanism of the project network characteristics on project success.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 28 March 2022

Arun A. Elias

The Sustainable Development Goal 12 (SDG 12) that aims at ensuring sustainable consumption and production patterns is dependent on efficient and effective transport…

Abstract

The Sustainable Development Goal 12 (SDG 12) that aims at ensuring sustainable consumption and production patterns is dependent on efficient and effective transport infrastructure. But many new transport infrastructure projects are delayed due to complex conflicts between multiple stakeholders with different stakes. This chapter illustrates how a multi-stakeholder participation process based on systems thinking can be used to generate a shared mental model of stakeholders in conflict. Using the systems thinking and modelling methodology, the complex problem situation is first structured by identifying and analysing the stakeholders. Then a participative approach is employed to develop a systems model that captures the underlying structure responsible for the problem situation. Finally, three strategic interventions are formulated by the stakeholders to improve the system behaviour in the long term. In this chapter, both quantitative and qualitative data were collected using structured interviews, focus groups and secondary sources. Using a New Zealand transport infrastructure project, the chapter shows that effective multi-stakeholder participation, capable of leading to some form of multi-stakeholder partnership, can help reduce delays in a transport infrastructure project. Practically, the chapter provides a framework that can reach an accommodation between conflicting stakeholders. Overall, this chapter contributes New Zealand–based empirical research to the literature on multi-stakeholder participation for achieving SDG 12 within the context of Agenda 2030.

Details

Environmental Sustainability and Agenda 2030
Type: Book
ISBN: 978-1-80262-879-1

Keywords

Article
Publication date: 17 July 2017

Babak Panahi, Elena Moezzi, Christopher Nigel Preece and Wan Normeza Wan Zakaria

The possible effect of conflicts as the consequence of differences between personal and organizational values (OV) on organizational commitment (OC) of internal construction…

1762

Abstract

Purpose

The possible effect of conflicts as the consequence of differences between personal and organizational values (OV) on organizational commitment (OC) of internal construction stakeholders was an unclear issue in the areas of organizational behaviour in the construction industry, especially in Malaysia. Therefore, the purpose of this paper is to focus on this issue in the Malaysian construction industry.

Design/methodology/approach

This paper targeted professional project consultants, who are identified as architects, engineers, and quantity surveyors, as the internal construction stakeholders. The personal-OV and the level of OC of the stakeholders were evaluated through a questionnaire survey. To achieve the research objective, comparative and hierarchical regression analyses were performed.

Findings

The results generated by the analyses indicated a high level of value conflicts in the construction organizations which significantly and negatively affected commitment of the internal stakeholders.

Originality/value

Value conflicts in construction organizations are the agenda of this paper while not many empirical studies have been conducted on this issue in Malaysia. This paper through investigating the potential effect of value conflicts on the stakeholders’ commitment reveals the importance of interaction between personal and OV in construction organizations which contributes to the extant literature of organizational behaviour as to the construction literature.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2020

Guangdong Wu, Junwei Zheng, Xianbo Zhao and Jian Zuo

This study aims to investigate how the strength of ties (i.e. strong ties and weak ties) in megaproject networks influences project performance in terms of types of conflicts.

Abstract

Purpose

This study aims to investigate how the strength of ties (i.e. strong ties and weak ties) in megaproject networks influences project performance in terms of types of conflicts.

Design/methodology/approach

A questionnaire survey was undertaken with professionals in Chinese megaprojects and 445 valid responses were received. A conflict-based theoretical model was developed and tested with structural equation modeling.

Findings

The results indicated that task conflict had a constructive effect on project performance, whereas relationship conflict and process conflict had destructive effects. Both strong and weak ties positively affected project performance, and that weak ties exerted greater effects on performance. The introduction of conflicts significantly weakened the effect of strong ties on project performance. Strong ties indirectly affected project performance via task conflict and relationship conflict, whereas weak ties affected performance only through task conflict. Task conflict had a constructive effect on project performance, whereas relationship conflict and process conflict had destructive impact.

Research limitations/implications

This study identified the positive effect of strength of ties on project performance as well as the constructive and destructive roles of conflicts. Furthermore, the findings provided evidence that strength of ties and conflicts were critical factors for project performance. While, there are still limitations. There are other attributes of megaproject networks, such as network nodes’ characteristics and network structure, which may influence conflicts and project performance. Future research would be conducted to explore the role of these variables. Meanwhile, because different types of conflicts may mutually transform under certain conditions, future research would also address this issue in megaprojects.

Practical implications

As for the management strategies, project stakeholders should know the existence of project networks, exactly assess their resource endowment, especially their external and internal relationship network. In accordance with changes of the project network, stakeholders should share knowledge and learn techniques about how to respond to relationship disturbances, thus reducing relationship conflict and process conflict. Furthermore, stakeholders should place an emphasis on fostering and reinforcing communication and trust, thus effectively resolving task conflict, ambiguity and uncertainty engendered from network ties in a megaproject network.

Originality/value

The main contribution of this study is threefold. First, this study will enrich the literature on strength of ties by accentuating the roles of conflicts in megaproject context. Second, this study contributes to the theoretical development of a conceptual model for explaining the interrelationships among strength of ties, conflicts and project performance. Third, this study will respond to the call “which dimension, i.e. strong ties or weak ties, is more influential” by exploring the direct and indirect effects of strength of ties on project performance.

Details

International Journal of Conflict Management, vol. 31 no. 5
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 10 October 2022

Jeffrey Gauthier, Jeffrey A. Kappen and Justin Zuopeng Zhang

This paper aims to consider the legitimacy challenges faced by hybrid organizations, examining the narrative strategies hybrids use in responding to these challenges and offering…

Abstract

Purpose

This paper aims to consider the legitimacy challenges faced by hybrid organizations, examining the narrative strategies hybrids use in responding to these challenges and offering a framework for managers to consider in their choice of narratives.

Design/methodology/approach

A narrative analysis of texts addressing the legitimacy of the business models used by four hybrid organizations is conducted.

Findings

The results of the analysis suggest that the nature of conflicting stakeholder demands – centered on goals or means – is an integral factor influencing hybrids’ choice of narrative strategies to emphasize distinctiveness or conformity.

Research limitations/implications

This paper adds to extant research examining the challenges hybrid organizations face and emphasizes that the choice of narrative strategies is an important factor hybrids must consider when managing legitimacy. Generalizability is a notable limitation of the case approach; the authors suggest areas for future research to address this limitation.

Practical implications

The research offers a practical framework for hybrids’ leaders, as they manage legitimacy, choosing to emphasize distinctiveness or conformity in the face of conflicts regarding goals or means.

Originality/value

By studying the legitimacy challenges faced by hybrid organizations, this study can form a more complete view of legitimation, encompassing different types of enterprises offering distinct value propositions.

Details

Society and Business Review, vol. 19 no. 1
Type: Research Article
ISSN: 1746-5680

Keywords

Article
Publication date: 21 November 2016

Hanaw M. Taqi M. Amin and Emmanuel Akwasi Adu-Ampong

The purpose of this paper is to examine the challenges to urban cultural heritage management conservation in the historical city of Sulaimaniyah, Kurdistan-Iraq. The paper…

Abstract

Purpose

The purpose of this paper is to examine the challenges to urban cultural heritage management conservation in the historical city of Sulaimaniyah, Kurdistan-Iraq. The paper focusses on the roles and interactions of stakeholders and the issues that confront the decision-making processes that underpin the management of historic city towns.

Design/methodology/approach

A case study methodology is utilised for this research. It involves documentary analysis and interviews with stakeholders who are part of the management of the historic city centre of Sulaimaniyah, Kurdistan-Iraq. The findings from this case study are analysed in a systematic way before being discussed in the context of the literature on urban cultural heritage management.

Findings

The research shows that although there is a shared vision of the need to preserve and conserve urban cultural heritage, the management process is a contentious one. Stakeholders have different ideas as to how to achieve conservation goals which leads to increasing conflicts among stakeholders. This situation is compounded by the limited financial resources available to local government agencies, political interference in the work of implementation agencies and the lack of capacity in local government to enforce rules and carry out conservation projects. There are also significant power differentials among stakeholders in the decision-making process which often means that local residents are excluded from the process of conserving their built urban heritage.

Practical implications

This research can help practitioners who are in charge of urban cultural heritage management in dealing with stakeholder conflicts. The paper offers insight into a number of sources of stakeholder conflicts and on ways to overcome these in the planning process.

Originality/value

The originality of research lies in the novelty of the case study area. This research highlights the issues of built heritage conservation management and planning practices in an area – Sulaimaniyah, Kurdistan-Iraq – that is geographically less represented in the extant literature. The research also identifies some of the key sources of conflict in urban heritage conservation projects and provides an insight into the roles of stakeholders in the management of smaller locally-dependent historic city centres.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 6 no. 3
Type: Research Article