Search results

1 – 10 of over 82000
Article
Publication date: 10 April 2017

Arthur Ahimbisibwe, Urs Daellenbach and Robert Y. Cavana

Aligning the project management methodology (PMM) to a particular project is considered to be essential for project success. Many outsourced software projects fail to deliver on…

5561

Abstract

Purpose

Aligning the project management methodology (PMM) to a particular project is considered to be essential for project success. Many outsourced software projects fail to deliver on time, budget or do not give value to the client due to inappropriate choice of a PMM. Despite the increasing range of available choices, project managers frequently fail to seriously consider their alternatives. They tend to narrowly tailor project categorization systems and categorization criterion is often not logically linked with project objectives. The purpose of this paper is to develop and test a contingency fit model comparing the differences between critical success factors (CSFs) for outsourced software development projects in the current context of traditional plan-based and agile methodologies.

Design/methodology/approach

A theoretical model and 54 hypotheses were developed from a literature review. An online Qualtrics survey was used to collect data to test the proposed model. The survey was administered to a large sample of senior software project managers and practitioners who were involved in international outsourced software development projects across the globe with 984 valid responses.

Findings

Results indicate that various CSFs differ significantly across agile and traditional plan-based methodologies, and in different ways for various project success measures.

Research limitations/implications

This study is cross-sectional in nature and data for all variables were obtained from the same sources, meaning that common method bias remains a potential threat. Further refinement of the instrument using different sources of data for variables and future replication using longitudinal approach is highly recommended.

Practical implications

Practical implications of these results suggest project managers should tailor PMMs according to various organizational, team, customer and project factors to reduce project failure rates.

Originality/value

Unlike previous studies this paper develops and empirically validates a contingency fit model comparing the differences between CSFs for outsourced software development projects in the context of PMMs.

Details

Journal of Enterprise Information Management, vol. 30 no. 3
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 9 February 2015

Arthur Ahimbisibwe, Robert Y Cavana and Urs Daellenbach

While the choices available for project management methodologies have increased significantly, questions remain on whether project managers fully consider their alternatives. When…

9103

Abstract

Purpose

While the choices available for project management methodologies have increased significantly, questions remain on whether project managers fully consider their alternatives. When project categorization systems and criteria are not logically matched with project objectives, characteristics and environment, this may provide the key reason for why many software projects are reported to fail to deliver on time, budget or do not give value to the client. The purpose of this paper is to identify and categorize critical success factors (CSFs) and develop a contingency fit model contrasting perspectives of traditional plan-based and agile methodologies.

Design/methodology/approach

By systematically reviewing the previous literature, a total of 37 CSFs for software development projects are identified from 148 articles, and then categorized into three major CSFs: organizational, team and customer factors. A contingency fit model augments this by highlighting the necessity to match project characteristics and project management methodology to these CSFs.

Findings

Within the three major categories of CSFs, individual factors are ranked based on how frequently they have been cited in previous studies, overall as well as across the two main project management methodologies (traditional, agile). Differences in these rankings as well as mixed empirical support suggest that previous research may not have adequately theorized when particular CSFs will affect project success and lend support for the hypothesized contingency model between CSFs, project characteristics and project success criteria.

Research limitations/implications

This research is conceptual and meta-analytic in its focus. A crucial task for future research should be to test the contingency fit model developed using empirical data. There is no broad consensus among researchers and practitioners in categorizing CSFs for software development projects. However, through an extensive search and analysis of the literature on CSFs for software development projects, the research provides greater clarity on the categories of CSFs and how their direct, indirect and moderated effects on project success can be modelled.

Practical implications

This study proposes a contingency fit model and contributes towards developing a theory for assessing the role of CSFs for project success. While future empirical testing of this conceptual model is essential, it provides an initial step for guiding quantitative data collection, specifies detailed empirical analysis for comparative studies, and is likely to improve clarity in debate. Since previous studies have not rigorously assessed the impact of fit between project characteristics, project environment and project management methodology on project success, additional empirically robust studies will help to clarify contradictory findings that have limited theory development for CSFs of software development projects to date.

Originality/value

Previous research for software development projects has frequently not fully incorporated contingency as moderation or contingency as fit (traditional vs agile). This research sets out to develop fully a contingency fit perspective on software development project success, through contrasting traditional plan-driven and agile methodologies. To do this, the paper systematically identifies and ranks 37 CSFs for software projects from 148 journal publications and holistically categorizes them as organizational, team, customer and project factors.

Details

Journal of Enterprise Information Management, vol. 28 no. 1
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 5 September 2018

Andrea Raymundo Balle, Mírian Oliveira, Carla Curado and Felipe Nodari

The purpose of this paper is to illustrate how knowledge takes effect in different software development methodologies by relating them to different knowledge cycles.

1038

Abstract

Purpose

The purpose of this paper is to illustrate how knowledge takes effect in different software development methodologies by relating them to different knowledge cycles.

Design/methodology/approach

The results were find by conducing a general review about the topics of knowledge cycles and software development methodologies.

Findings

All software development methodologies have knowledge cycles. In Waterfall methodology, the cycle followed is I-Space. For “code and fix,” there is a parallel with March’s cycle. Scrum shows a parallel with SECI cycle. Among the methodological options, results show there an increase in hierarchy, documentation, processes and explicit knowledge.

Research limitations/implications

Identified parallels of each methodology with knowledge cycles; established which Scrum artifacts are performed at each stage of SECI, which Waterfall steps correspond to I-Space phases and which activities in “code and fix” deal with exploration and exploitation of knowledge; and features shown increase or decrease according to the adoption of each methodology.

Practical implications

Results help knowledge sharing implementations and foster inter-team knowledge sharing, with the identification of the correct methodology-cycle match and the personalization of the strategy for each team based on the adopted methodology. Training for knowledge initiatives can be improved by determining how knowledge-sharing activities are incorporated on the determined series of actions established by the methodologies adopted on the firm.

Originality/value

The identification of how knowledge is generated and shared among teams in each methodology, the optimum pairing of the methodology and the parallels with the other, and the differences that emerge from the adopted knowledge cycle show that software projects are embedded in a knowledge cycle.

Details

Industrial and Commercial Training, vol. 50 no. 7/8
Type: Research Article
ISSN: 0019-7858

Keywords

Article
Publication date: 11 April 2023

Shekhar Rathor, Weidong Xia and Dinesh Batra

Agile principles have been widely used in software development team practice since the creation of the Agile Manifesto. Studies have examined variables related to agile principles…

Abstract

Purpose

Agile principles have been widely used in software development team practice since the creation of the Agile Manifesto. Studies have examined variables related to agile principles without systematically considering the relationships among key team, agile methodology, and process variables underlying the agile principles and how these variables jointly influence the achievement of software development agility. In this study, the authors tested a team/methodology–process–agility model that links team variables (team autonomy and team competence) and methodological variable (iterative development) to process variables (communication and collaborative decision-making), which are in turn linked to software development agility (ability to sense, respond and learn).

Design/methodology/approach

Survey data from one hundred and sixty software development professionals were analyzed using structural equation modeling methods.

Findings

The results support the team/methodology–process–agility model. Process variables (communication and collaborative decision-making) mediated the effects of team (autonomy and competence) and methodological (iterative development) variables on software development agility. In addition, team, methodology and process variables had different effects on the three dimensions of software development agility.

Originality/value

The results contribute to the literature on organizational IT management by establishing a team/methodology–process–agility model that can serve as a basis for developing a core theoretical foundation underlying agile principles and practices. The results also have practical implications for organizations in understanding and managing holistically the different roles that agile methodological, team and process factors play in achieving software development agility.

Details

Information Technology & People, vol. 37 no. 2
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 31 May 2019

Kati Tuulikki Stormi, Teemu Laine and Tuomas Korhonen

The purpose of this study is to reflect upon the feasibility of agile methodologies, Scrum in particular, to supplement the procedural design and implementation of performance…

3177

Abstract

Purpose

The purpose of this study is to reflect upon the feasibility of agile methodologies, Scrum in particular, to supplement the procedural design and implementation of performance measurement systems (PMS).

Design/methodology/approach

The study is an interventionist case study that applied agile methodologies in the PMS development. Researchers actively participated in the PMS development, e.g. researchers designed some of the performance measurement prototypes in order to facilitate the agile development.

Findings

The study outlines an agile approach suitable for PMS development. The paper answers the topical needs for adaptability and agility in management accounting, by applying agile methodologies into PMS development. PMS development does not take place only as a project or process that systematically progresses from the measure selection to measure implementation. Instead, as the requirements for the PMS change during the development project, management may reject some measures and new measures emerge as the understanding about changing situations increase. Agile methodologies are a methodological way to respond to the inevitable change and to enhance management accounting adaptability.

Research limitations/implications

This study contributes to the PMS literature by proposing that agile development methodologies can advance organizational features that increase management accounting adaptability. As a result, the study proposes a new approach for PMS development to supplement existing ones. Agile methodologies are especially suitable for extending the PMS in new, yet relatively immature areas of performance measurement. The new approach applies Scrum principles in PMS development. By drawing from the theories of performance measurement (system) development and enabling PMS, the paper furthers academic understanding about agile development of accounting information systems.

Practical implications

Companies can use the proposed approach in PMS development, particularly after the initial system implementation in redesigning the system. The approach may increase the PMS impact in organizations and prevent PMS implementation failures.

Originality/value

The paper identifies the potential of using agile methodologies to enhance PMS adaptability and provides preliminary evidence of the potential of such approach in supplementing processual PMS development frameworks.

Details

Journal of Accounting & Organizational Change, vol. 15 no. 2
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 28 February 2022

Ebrahim Vatan, Gholam Ali Raissi Ardali and Arash Shahin

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting…

Abstract

Purpose

This study aims to investigate the effects of organizational culture factors on the selection of software process development models and develops a conceptual model for selecting and adopting process development models with an organizational culture approach, using 12 criteria and their sub-criteria defined in Fey and Denison’s model (12 criteria).

Design/methodology/approach

The research hypotheses were investigated using statistical analysis, and then the criteria and sub-criteria were selected based on Fey and Denison’s model and the experts’ viewpoints. Afterward, the organizational culture of the selected company was measured using the data from 2016 and 2017, based on Fey and Denison’s questionnaire. Due to the correlation between the criteria, using the decision-making trial and evaluation technique, the correlation between sub-criteria were determined, and by analytical network process method and using Super-Decision software, the process development model was preferred to the 12 common models in information systems development.

Findings

Results indicated a significant and positive effect of organizational culture factors (except the core values factor) on the selection of development models. Also, by changing the value of organizational culture, the selected process development model changed either. Sensitivity analysis performed on the sub-criteria implied that by changing and improving some sub-criteria, the organization will be ready and willing to use the agile or risk-based models such as spiral and win-win models. Concerning units where the mentioned indicators were at moderate and low limits, models such as waterfall, V-shaped and incremental worked more appropriately.

Originality/value

While many studies were performed in comparing development models and investigating their strengths and weaknesses, and the impact of organizational culture on the success of information technology projects, literature indicated that the impact of organizational sub-culture prevailing in the selection of development process models has not been investigated. In this study, new factors and indicators were addressed affecting the selection of development models with a focus on organizational culture. Correlation among the factors and indicators was also investigated and, finally, a conceptual model was proposed for proper adoption of the models and methodologies of system development.

Article
Publication date: 10 May 2013

Avinash Ramtohul and K.M.S. Soyjaudah

The purpose of this paper is to analyse the problems associated with the development of e‐government in Southern Africa Development Community (SADC) countries and propose a novel

Abstract

Purpose

The purpose of this paper is to analyse the problems associated with the development of e‐government in Southern Africa Development Community (SADC) countries and propose a novel framework for adopting service orientation. This framework includes a new approach and architecture for implementing service orientation called SBA‐eGOV (Service Based Architecture for E‐Government).

Design/methodology/approach

A comprehensive literature review was carried out to study various service oriented architecture (SOA) adoption strategies and implementation methods. The most appropriate adoption strategy and implementation method were selected. Web service adoption and implementation/development methodologies were designed separately, and then integrated to form one single framework. Web services best practices were studied to identify the specificities of web services for e‐government projects in SADC countries. A service orientation framework, which includes a service orientation development/implementation method, was developed for e‐government projects. Data from the UN report on e‐government readiness for year 2004‐2010 were analysed.

Findings

The trend showed that the e‐government index of SADC countries has been stagnating (even degrading) since 2005. One of the main reasons is the lack of software application integration. The main area of weakness is the lack of a complete framework for adopting and implementing web services. A framework for adopting service orientation, developing web services and deploying e‐services is required to enable application software integration.

Research limitations/implications

By applying the proposed framework, e‐services can be deployed more rapidly to citizens, businesses and government departments.

Practical implications

SBA‐eGOV can be adopted by countries where e‐government projects have completed the “Internalisation” and “Interaction” stages and use to deliver e‐services to citizens.

Originality/value

This work comprises development of a new framework, SBA‐eGOV, which consists of a service‐orientation adoption methodology, a service‐orientation implementation methodology and a service‐based architecture for government. SBA‐eGOV is a novel and complete framework which addresses service‐orientation adoption, development and implementation. To date, no such research work has been undertaken to analyse and solve the problems surrounding e‐government projects in SADC.

Article
Publication date: 4 March 2014

Usman K. Durrani, Zijad Pita and Joan Richardson

The purpose of this paper is to present the findings of Phase 1 of the research and to identify Australian agile software development organizations having such coexistence of…

1036

Abstract

Purpose

The purpose of this paper is to present the findings of Phase 1 of the research and to identify Australian agile software development organizations having such coexistence of agile and software configuration management (SCM) practices. This study employed “organization size” variable to study the phenomenon and used theory of Lean Thinking as a lens to analyse implementation variations of agile and SCM practices.

Design/methodology/approach

For this study, the research design was comprised of three phases. In Phase 1, a quantitative study using an online survey was performed to answer RQ using various statistical techniques. In Phase 2, an initial conceptual model based on a literature review was developed, and then a qualitative study was performed using one longitudinal case study. In Phase 3, another online survey was performed using various parametric statistical techniques to validate and generalize the findings of Phase 1 and 2 and the proposed SLAM traceability model. The scope of this paper is to discuss only Phase 1 and its associated findings.

Findings

The results of the analysis indicated that organizations, regardless of their size, frequently use agile practices for their software development operations. On the other hand, larger organizations use SCM practices comparatively more than medium and small organizations. However, traces of customized SCM process were found in most of the respondent (large, medium, and small) organizations, which indicates the coexistence of agile and SCM practices.

Research limitations/implications

As there is no known listing or database available for such specialized criteria, a non-probabilistic sampling method was used, in the sense that the selection of members of the sample was arbitrary and subjective instead of a non-random selection from the pool of all agile practitioners in the field.

Originality/value

By using the quantitative method approach, this study aims to generate empirical evidence to contribute to the body of knowledge in the relevant areas. On the practical side, this research can also provide support to IT businesses in general, and software development organizations in particular, with the streamlining of the internal operational environment for the facilitation of an adaptable process and the resulting coexistence of value-added agile and SCM practices.

Details

Journal of Systems and Information Technology, vol. 16 no. 1
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 20 April 2010

Subhas Chandra Misra, Vinod Kumar and Uma Kumar

Agile software development (ASD) is currently an emerging approach in software engineering for improving quality, initially advocated by a group of 17 software professionals who…

4632

Abstract

Purpose

Agile software development (ASD) is currently an emerging approach in software engineering for improving quality, initially advocated by a group of 17 software professionals who practice a set of “lightweight” methods, and share a common set of values of software development. Owing to the attractive claims of successes of the ASD approach, many traditional projects, which used to practice plan‐driven software development, are gradually transitioning into ASD‐based development. This paper seeks to report the results from a survey‐based ex‐post‐facto study aimed at determining the relative importance, if any, of the changes traditional plan‐driven software development projects have to undergo to adopt ASD practices.

Design/methodology/approach

The study was conducted using a web‐based survey with ASD practitioners who had experience of practicing plan‐driven software development in the past. ASD practitioners from a wide range of industrial sectors participated in the study. Similarly, the study is not restricted to any specific organisation/project size, culture, or nationality – the respondents were widely geographically distributed across continents.

Findings

The study received 241 responses, of which 165 were usable. The study did not reveal any substantial difference in importance of the four classes of changes hypothesised – changes in culture, changes in management style, changes in knowledge management strategy and changes in development processes. The authors believe that this is an important finding because it is indicative of not isolating one class of changes from another in practical transition exercises. However, another noteworthy observation was that transitioning from heavily process‐centric to short, iterative, test‐driven, and people‐centric development was considered by the largest percentage (roughly 77 per cent) of respondents to be very important. The open‐ended questions in the study also revealed three additional classes of changes: changes in personal characteristics, changes in customer attitude, and changes in knowledge and education of stakeholders.

Originality/value

In this work an attempt was made to gain an understanding of the relative importance of the different critical changes that would be helpful to a project manager who is involved in the transition from traditional plan‐driven software development practices to agile software development practices.

Details

International Journal of Quality & Reliability Management, vol. 27 no. 4
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 2 March 2015

Subhas C. Misra and Virender Singh

Software development life cycle (SDLC) has always been the core methodology for any software engineer that depicts the entire development process which an organization is bound to…

2566

Abstract

Purpose

Software development life cycle (SDLC) has always been the core methodology for any software engineer that depicts the entire development process which an organization is bound to utilize to achieve successful software. The purpose of this paper is to bring forth a conceptual model after analysing the best practices in SDLC, and extracting the best out of agile methodologies and the open source software, thereby bringing forward an optimised structure.

Design/methodology/approach

The OASDLC is hypothesized specifically for “Brihaspati” project and is formulated keeping in mind the gaps and limitations posed by existing SDLC models. OASDLC is further put to test for achieving lower costs and efforts involved. The tests are further substantiated by means of hypothesis validation through execution of a survey based research.

Findings

It has been observed that the present conceptual model further optimizes the efforts involved while adopting such a practice.

Originality/value

This paper proposes a novel SDLC model so as to achieve a best practice for a software project. On analysing the issues involved such as tight budget and timelines, it led the authors to formulate a newer concept “Open Agile Software Development Life Cycle model” (OASDLC).

Details

International Journal of Quality & Reliability Management, vol. 32 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of over 82000