Search results

1 – 10 of 384
Open Access
Article
Publication date: 21 November 2023

Silvia Sacchetti and Alberto Ianes

This study aims to address the question of what coordination mechanism can be used for cultural production and, in particular, for the governance of music culture production. The…

Abstract

Purpose

This study aims to address the question of what coordination mechanism can be used for cultural production and, in particular, for the governance of music culture production. The authors locate their reflection within the specific institutional innovations introduced in Italy in 2017, focusing on the idea of shared administration and the public–private collaboration instituted in Trentino (a province located in northern Italy) in support of its cultural policy.

Design/methodology/approach

This study focusses on the Trentino’s music school system. This includes 13 organisations (musicians’ cooperatives as well as associations of musicians and students, plus one municipal school which do not overlap with the public school system). To analyse shared administration features, the authors rely on selected information from 50 interviews with Trentino Music Schools (TMS) teachers and administrators, and on the proceedings of the 1994 music school conference organised by the schools at the time when this novel educational system was created.

Findings

To offer an innovative educational service, the public actor (Provincia Autonoma di Trento [PAT]) and the schools (TMS) have developed a strong interdependence at the different levels of decision-making: PAT needs organisations that are sufficiently structured and organised to respect requirements of transparency and accountability, as well as educational standards, whereas TMS need public funding to maintain their service accessible for users, good labour conditions and be financially sustainable. Likewise, the success of TMS in educating thousands of students every year, including additional teaching programmes funded by PAT within general public schools, has contributed to decrease the exclusion from music education, raise interest in young people for music and fed enrolment in TMS as well as in the public schools related to the conservatoire filière. Conclusions emphasise the existence of a polycentric system of music culture production which needs to acknowledge the risk of being trapped in a static disequilibrium, while recognising change and the need to support and promote a culture of cooperation among schools and across layered institutional levels over time.

Research limitations/implications

Further research can observe this system of cultural production over time, to appreciate changes and organisational tranformations, while introducing comparative analysis with other systems in different regions.

Practical implications

The relationship between the public and private sectors to design, organise and manage activities of collective interest (in the social, cultural, sporting and other fields) can increasingly become an effective and efficient alternative to the traditional bureaucratic as well as to the competitive method. For this to happen, however, all actors involved must be aware not only of areas of efficiency but also of inefficiency. To remedy the latter, corrective measures will have to be introduced. For example, fostering and improving “co-programmazione” and “co-progettazione” means giving all stakeholders involved the opportunity to actively participate. Should the number of participants increase, more discussion fora could be set up because one alone may not be sufficient to foster maximum involvement, to enhance different points of view, to allow for intersectoral and multidisciplinary interpretations and responses.

Social implications

The system governance based on co-programming and co-design has allowed – despite limitations – to pursue educational purposes and thus well-being for the users, as well as for the teachers and the community as a whole. The continuity of this educational and cultural action has been guaranteed by the economic and financial sustainability of the schools, which is highly dependent on the public actor funding personnel costs, and in turn tied to the number of students (demand) attending each school. Actors embedded in the system need to build awareness of industry and cultural changes and knowledge of how to introduce more adaptive capacity. This points towards the need for strengthening networking capacity and collaboration among schools and other relevant stakeholders.

Originality/value

The case presented is a unique system of music culture production in Italy, and its governance has never been addressed by previous studies. It provides an application of shared administration to which public administrations and communities can learn to improve access to music culture and education. For public and private organisations to take advantage of the method of “co-programmazione” and “co-progettazione”, to make the production of a meritorious good more efficient and to favour its maximum accessibility, this study considers the strengths and weaknesses of this approach, or the areas of efficiency and inefficiency, for which new measures will have to be introduced.

Details

Social Enterprise Journal, vol. 20 no. 2
Type: Research Article
ISSN: 1750-8614

Keywords

Article
Publication date: 17 October 2022

Jianbo Zhu, Qianqian Shi, Ce Zhang, Jingfeng Yuan, Qiming Li and Xiangyu Wang

Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure…

Abstract

Purpose

Promoting low-carbon in the construction industry is important for achieving the overall low-carbon goals. Public–private partnership is very popular in public infrastructure projects. However, different perceptions of low-carbon and behaviors of public and private sectors can hinder the realization of low-carbon in these projects. In order to analyze the willingness of each stakeholder to cooperate towards low-carbon goals, an evolutionary game model is constructed.

Design/methodology/approach

An evolutionary game model that considers the opportunistic behavior of the participants is developed. The evolutionary stable strategies (ESSs) under different scenarios are examined, and the factors that influence the willingness to cooperate between the government and private investors are investigated.

Findings

The results illustrate that a well-designed system of profit distribution and subsidies can enhance collaboration. Excessive subsidies have negative impact on cooperation between the two sides, because these two sides can weaken income distribution and lead to the free-riding behavior of the government. Under the situation of two ESSs, there is also an optimal revenue distribution coefficient that maximizes the probability of cooperation. With the introduction of supervision and punishment mechanism, the opportunistic behavior of private investors is effectively constrained.

Originality/value

An evolutionary game model is developed to explore the cooperation between the public sector and the private sector in the field of low-carbon construction. Based on the analysis of the model, this paper summarizes the conditions and strategies that can enable the two sectors to cooperate.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 March 2024

Huimin Li, Boxin Dai, Yongchao Cao, Limin Su and Feng Li

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of…

26

Abstract

Purpose

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of losses or increased transaction costs caused by opportunistic behavior in a soft environment where trust asymmetry is quite common and difficult to avoid.

Design/methodology/approach

This study focuses on examining asymmetric trust between the government and the private sector in public-private partnership (PPP) projects. Drawing upon both project realities and relevant literature, the primary conditional variables influencing asymmetric trust are identified. These variables encompass power perception asymmetry, information asymmetry, interaction behavior, risk perception differences and government-side control. Subsequently, through the use of a survey questionnaire, binary-matched data from both the government and the private sector are collected. The study employs fuzzy-set qualitative comparative analysis (fsQCA) to conduct a configurational analysis, aiming to investigate the causal pathways that trigger asymmetric trust.

Findings

No single conditional variable is a necessary condition for the emergence of trust asymmetry. The pathways leading to a high degree of trust asymmetry can be categorized into two types: those dominated by power perception and those involving a combination of multiple factors. Differences in power perception play a crucial role in the occurrence of high trust asymmetry, yet the influence of other conditional variables in triggering trust asymmetry should not be overlooked.

Originality/value

The findings can contribute to advancing the study of trust relationships in the field of Chinese PPP projects. Furthermore, they hold practical value in facilitating the enhancement of trust relationships between the government and the private sector.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 31 August 2022

Bo Tian, Jiaxin Fu, Yongshun Xu and Longshan Sun

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract…

Abstract

Purpose

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract and transaction cost, may be a viable solution to this issue. The purpose of this study is to investigate the relationship between contract flexibility and the sustainability performance of PPP projects. The multiple mediating roles of justice perception and cooperation efficiency are assessed, thereby allowing the pathways and conditions to be understood more comprehensively for improving the sustainability performance of PPP projects.

Design/methodology/approach

Nine hypotheses in the proposed research model are tested via structural equation modeling using data acquired from 218 Chinese PPP professionals.

Findings

Results show that contract flexibility positively affects PPP project sustainability performance. Justice perception and cooperation efficiency play direct and sequential mediating roles in this effect.

Originality/value

This study validates that contract flexibility positively impacts the sustainability performance of PPP projects, where justice perception and cooperation efficiency serve direct and sequential mediating roles. The findings of this study contribute to an improved understanding of the effect of contract flexibility on the sustainability performance of PPP projects. Furthermore, they provide important theoretical and practical insights into contract management as well as beneficial information and valuable initiatives for improving the sustainability of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 March 2022

Huimin Li, Chenchen Xu, Yongchao Cao and Chengyi Zhang

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these…

Abstract

Purpose

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these influencing factors affect the government’s trust decisions.

Design/methodology/approach

A theoretical model was established, and a questionnaire survey was conducted among 152 professionals. The collected datas were analyzed by the structural equation modeling (SEM) method.

Findings

The study identified four critical factors that influence the government’s decision to trust the private sector in public-private-partnership (PPP) projects. All the four factors have a positively correlated impact on the government’s trust decision-making. The structural equation path analysis shows that the most important factor affecting the government’s trust decision-making is the trustee’s (private sector) trustworthy characteristics, and the path coefficient is 0.92. The path coefficients of risk perception and the trustor’s trust tendency are 0.83 and 0.74, respectively. The influence of the legal system environment on government trust decision-making is moderate, with a path coefficient of 0.68.

Originality/value

This paper contributes to the literature in two aspects. First, the factors influencing decision-making to government trust in the private sector in PPP projects have been identified. Second, a comprehensive view of the mechanism of government trust in the private sector in PPP projects has been theorized by the SEM method.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 24 November 2023

Yongjian Ke, Zhe Cheng, Jingxiao Zhang and Yong Liu

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's…

Abstract

Purpose

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's complexity. This study aims to offer a definition and foster a more substantive and comprehensive discourse on PPPs to improve communication and understanding between academics and practitioners from diverse disciplines and legislative backgrounds.

Design/methodology/approach

Grounded in the family-resemblance concept proposed by German philosopher Ludwig Wittgenstein, this study conducts a comprehensive literature review to identify core and non-core elements frequently cited in PPP descriptions. The authors used these findings to develop the PPP sunflower model as a structured framework for defining PPPs.

Findings

The analysis elucidates six core elements consistently present in PPP descriptions: clarity of roles and responsibilities, appropriate risk allocation and sharing, injection of expertise and resources, cooperation and teamwork, a bundle of services, and long-term contracts. Coupled with identified non-core elements, these core components comprise the PPP sunflower model, a structured framework for defining PPPs that accommodates their multi-faceted nature.

Originality/value

The PPP sunflower model distinguishes itself as a unique contribution to the PPP literature. It offers a rigorous theoretical framework that can elucidate the complexity of PPPs for various stakeholders. The model serves as a practical tool for evaluating the authenticity and viability of PPP projects. The study's novelty lies in its adoption of the family-resemblance concept, thereby providing a comprehensive, multi-dimensional framework that enhances the understanding of PPPs across different disciplines and legislative contexts.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 14 September 2022

Bingsheng Liu, Juankun Li, Dan Wang, Henry Liu, Guangdong Wu and Jingfeng Yuan

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs…

Abstract

Purpose

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs. It examines the transmission pattern (i.e. the way in which network members react to each other) of the IFs network.

Design/methodology/approach

Literature review and interview were adopted to identify the IFs. Then, with the data collected from the interview in China, the social network analysis and interpretive structure model were synergised to examine the chain reaction, driving and dependent powers, and hierarchical structure of the identified IFs.

Findings

The results reveal that the cognition, institutional, financial and participation aspects are key barriers confronted by PPP sustainability, and the government plays a leading role in controlling factors causing sustainability-related problems in PPPs. Weak government leadership and institutional environment were identified as the most fundamental reasons triggering a chain of IFs, while project governance and management activities act as bridge nodes that play an intermediary role in the IFs network.

Research limitations/implications

This research contributes to the literature on PPP governance by (1) bridging the literature gap through the development of CGF for explaining the governance of PPP sustainability with a holistic view that considers both macro environment and operational project processes; and (2) identifying the transmission pattern of IFs network which uncovers the underlying dynamics causing the unsustainable operation of PPPs.

Practical implications

This research provides practitioners with a list of key checkpoints for preventing failure escalation, enables decision-makers to prioritise obstacle-mitigation efforts and develop a feasible process to control PPP operation, and offers management countermeasures to remove the key barriers impeding PPP sustainability.

Originality/value

This study is novel for adopting network-oriented techniques to quantify the relative importance of the IFs and examine the transmission pattern of the IFs system. Therefore, it visualises the complex underlying dynamics causing unsustainable PPP operation, identifies root and direct causes of PPP failures, and provides decision-makers with insights into sustaining PPP sustainability from a network-oriented perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 October 2023

Sajida and Bevaola Kusumasari

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

1793

Abstract

Purpose

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

Design/methodology/approach

Based on Scopus and adopting the protocol of Staples and Niazi (2007), this systematic literature review examined 21 articles on PPPs in the education sector. Content analysis is adopted to identify research gaps and provide information on critical issues in the cases.

Findings

The findings have identified the critical success factors of PPPs in the education sector in 12 countries, revealing varying degrees of success and implementation challenges. They reflect the importance of clear objectives, effective communication, and robust partnerships between the public and private sectors to achieve success. These insights contribute to an in-depth understanding of PPP implementation in education, which can guide future projects.

Originality/value

The critical success factors identified in PPPs implementation in education across various countries may provide a comprehensive worldwide perspective for researchers, practitioners and policymakers.

Details

Public Administration and Policy, vol. 26 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Open Access
Article
Publication date: 12 December 2023

Meine Pieter Van Dijk

Higher productivity in the potato value chain in Rwanda requires good quality seed potatoes. The article analyzes how innovations were introduced in the framework of a development…

Abstract

Purpose

Higher productivity in the potato value chain in Rwanda requires good quality seed potatoes. The article analyzes how innovations were introduced in the framework of a development project resulting in a partnership between a firm and two educational institutions to produce better seed potatoes, using the Triple Helix approach.

Design/methodology/approach

In the Triple Helix model government, academia and the private sector work together to develop and introduce innovations. This led to producing and introducing improved seed potatoes at an affordable price through a public private partnership (PPP). Interviews with experts and a survey of local producers were carried out to identify factors influencing the success of the partnership.

Findings

A Service, Training and Innovation Center (STIC) has been created to produce the first clean potato seeds in Africa on a commercial scale, based on cultivation of in vitro potato plantlets and aeroponics to produce mini-tubers. It is called Seed Potato Advancement Centre, an education–enterprise partnership, using these plantlets to produce mini-tubers through aeroponics. Seed multipliers are responsible for the next three stages of seed multiplication. The final product is the certified potato, sold to ware potato farmers. The availability of disease-free seed potatoes in Rwanda gives a boost to the potato value chains and contributes to food security. The partnership was successful because of the support from the government and donors, with the private sector and the extension services helping to implement the innovations effectively.

Research limitations/implications

The limitation is that the number of experts interviewed is limited and the survey did not only deal with potato-related activities. The focus is on one region only, but the most important potato growing area in Rwanda.

Social implications

STICs function as a tool for cooperation between government, private sector and the knowledge sector to achieve commercial and development goals. They function as a channel for technology transfer. They allow applied research, including agronomic research; information collection; and dissemination, networking, training, organization of outreach activities. The model can be repeated in other sectors and countries.

Originality/value

The paper looks at a PPP in agriculture with educational institutions. Second, the Triple Helix and value chain literature is used to study the introduction and implementation of appropriate innovations, while factors determining the success of the partnership were identified. This concerns the first production of clean seed potatoes in Africa on a commercial scale.

Details

Journal of Agribusiness in Developing and Emerging Economies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-0839

Keywords

Article
Publication date: 3 October 2022

Chunhao Li, Yuping Zhao and Wei Feng Chen

This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance…

Abstract

Purpose

This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance. Formal control and relationship governance are two primary forms of inter-organizational governance that affect project performance. However, little is known about the interplay between formal control and commitment and its effect on PPP projects. More specifically, previous studies have failed to distinguish the function routes of relationship governance resulting from different types of formal control (process and outcome control).

Design/methodology/approach

This study adopts a questionnaire survey to empirically investigate the mechanism that commitment-based governance influences the relationship between formal control and PPP performance. After collecting data from public and private sector professionals involved in 101 Chinese PPP projects, the theoretical framework proposed in this paper is verified by the empirical results of the hierarchical multiple regression analysis.

Findings

The results show that process control has an inverted U-shaped effect and outcome control has a significant positive influence on PPP project performance. Furthermore, commitment moderates the effect of formal control on PPP project performance by increasing the relevance of outcome control and mediates the inverted U-shaped relationship between process control and PPP project performance.

Practical implications

Managers should recognize that process control is a double-edged sword and prevent the overuse of process control. Managers should direct their attention toward efforts to improve the commitment, which allows for the effectiveness of outcome control strategies. Additionally, this study new measurement method for relationship governance suggests that managers should be aware of the difference in parties' perceptions of the relationship.

Originality/value

This study allows for a comprehensive understanding of the relationship governance-control nexus from a commitment perspective. The authors bring into light the dual role of commitment-based governance in the relationship between the two types of formal control and PPP project performance. Moreover, the new approach to measure relationship governance offers valuable insight into the measurement of variables about individual's perception.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 384