Article
Publication date: 2 January 2024

Emma Mihocic, Koorosh Gharehbaghi, Per Hilletofth, Kong Fah Tee and Matt Myers

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail…

Abstract

Purpose

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail infrastructure. This paper aims to investigate to what degree social, environmental and economic factors influence the government when planning sustainable rail infrastructure projects. To respond to such a matter, this paper focuses on two Australian mega-rail projects: the South West Rail Link (SWRL) and the Mernda Rail Extension (MRE).

Design/methodology/approach

As the basis of an experimental evaluation framework strengths, weaknesses, opportunities and threats (SWOT) and factor analysis were used. These two methods were specifically selected as comparative tools for SWRL and SWRL projects, to measure their overall sustainability effect.

Findings

Using factor analysis, in the MRE, the factors of network capacity, accessibility, employment and urban planning were seen frequently throughout the case study. However, politics and economic growth had lower frequencies throughout this case study. This difference between the high-weighted factors is likely a key element that determined the SWRL to be more sustainable than the MRE. The SWOT analysis showed the strengths the MRE had over the SWRL such as resource use and waste management, and natural habitat preservation. These two analyses have shown that overall, calculating the sustainability levels of a project can be subjective, based on the conditions surrounding various analysis techniques.

Originality/value

This paper first introduces SWRL and MRE projects followed by a discussion about their overall sustainable development. Both projects go beyond the traditional megaprojects' goal of improving economic growth by developing and enhancing infrastructure. Globally, for such projects, sustainability measures are now considered alongside the goal of economic growth. Second, SWOT and factor analysis are undertaken to further evaluate the complexity of such projects. This includes their overall sustainable development vision alignment with environmental, economic and social factors.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 December 2023

Isaac Akomea-Frimpong, Jacinta Rejoice Ama Delali Dzagli, Kenneth Eluerkeh, Franklina Boakyewaa Bonsu, Sabastina Opoku-Brafi, Samuel Gyimah, Nana Ama Sika Asuming, David Wireko Atibila and Augustine Senanu Kukah

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of…

Abstract

Purpose

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of public–private partnership (PPP) infrastructure projects. Such conferences together with available project reports and empirical studies recommend project managers and practitioners to adopt smart technologies and develop robust measures to tackle climate risk exposure. Comparatively, artificial intelligence (AI) risk management tools are better to mitigate climate risk, but it has been inadequately explored in the PPP sector. Thus, this study aims to explore the tools and roles of AI in climate risk management of PPP infrastructure projects.

Design/methodology/approach

Systematically, this study compiles and analyses 36 peer-reviewed journal articles sourced from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results demonstrate deep learning, building information modelling, robotic automations, remote sensors and fuzzy logic as major key AI-based risk models (tools) for PPP infrastructures. The roles of AI in climate risk management of PPPs include risk detection, analysis, controls and prediction.

Research limitations/implications

For researchers, the findings provide relevant guide for further investigations into AI and climate risks within the PPP research domain.

Practical implications

This article highlights the AI tools in mitigating climate crisis in PPP infrastructure management.

Originality/value

This article provides strong arguments for the utilisation of AI in understanding and managing numerous challenges related to climate change in PPP infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 September 2023

Haiyi Zong, Guangbin Wang and Dongping Cao

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus…

Abstract

Purpose

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus generally delivered through complex contractor–subcontractor collaboration chains. This study aims to characterize the complexity of collaborative networks between contractors and subcontractors for infrastructure development through comparing the structural characteristics and the formation mechanisms of contractor–subcontractor collaborative networks for the following two different types of infrastructure: public works (PWCN) owned and operated by government agencies, and public utilities (PUCN) owned and operated by nongovernment agencies.

Design/methodology/approach

Based on the method of stochastic actor-oriented models and the longitudinal dataset of National Quality Award Projects in China during 2001–2020, this study compares how the structural characteristics of project-based collaborative networks between contractors and subcontractors for the two types of projects are different and how related micro-mechanisms, including both structure-based endogenous network effects and attribute-based exogenous homophily effects (institutional, organizational and geographical homophily), collectively underpin the formation of the networks.

Findings

The empirical results provide evidence that while the two networks are both characterized by relatively low levels of network density, PWCN is more globally connected around a minority of superconnected contractors as compared with PUCN. The results further reveal that compared with PUCN, the formation of PWCN is more significantly related to the structure-based anti in-isolates effect, suggesting that PWCN is more open for new entrant subcontractors. With regard to the attribute-based homophily effects, the results provide evidence that while both significantly and positively related to the effects of organizational (same company group) and geographical homophily (same location), the formation of PWCN and PUCN is oppositely driven by the institutional homophily effect (same ownership type).

Originality/value

As an exploratory effort of using network perspective to investigate the formation mechanisms of contractor–subcontractor relationships in the infrastructure development domain, this study contributes to a network and self-organizing system view of how contractors select subcontractors in different types of infrastructure projects. The study also provides insights into how contractor–subcontractor collaborative relationships can be better manipulated to promote the development of complex infrastructure in different contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 March 2023

Xueqing Gan, Jianyao Jia, Yun Le and Yi Hu

Infrastructure projects are pivotal for regional economic development, but also face low project effectiveness. Leadership is always regarded as a key enabler for project team…

Abstract

Purpose

Infrastructure projects are pivotal for regional economic development, but also face low project effectiveness. Leadership is always regarded as a key enabler for project team effectiveness, including vertical leadership and team-level leadership. The purpose of this paper is to examine how vertical leadership facilitates shared leadership in infrastructure project teams.

Design/methodology/approach

This paper develops the conceptual model based on the literature review. Then the questionnaire survey was conducted. The empirical data obtained from 117 infrastructure project teams in China were analyzed by partial least squares structural equation modeling (PLS-SEM) for validating the proposed model. Finally, the results were comparatively discussed to explain the dual-pathway between vertical leadership and shared leadership. And the practical implications were presented for the project managers in infrastructure project teams.

Findings

Drawing on social learning theory and social cognitive theory, the results show that both participative leadership and task-oriented leadership can facilitate shared leadership. Further, team atmosphere fully mediates the link between participative leadership and shared leadership. Team efficacy fully mediates the relation between task-oriented leadership and shared leadership. Also, role clarity has a negative moderating effect on the former path.

Originality/value

The study extends the knowledge of leadership theory in the construction field. Based on the proposed conceptual model and PLS-SEM results, this study unveils the black box between vertical leadership and shared leadership and contributes to the theory of leadership on how the impact of different vertical leadership on team process promotes shared leadership.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 April 2023

Weiling Jiang and Igor Martek

Political risk has been identified as a major impediment to the success of foreign invested projects, in developing countries. Infrastructure projects are especially sensitive to…

Abstract

Purpose

Political risk has been identified as a major impediment to the success of foreign invested projects, in developing countries. Infrastructure projects are especially sensitive to host-country political climates. Governance in emerging economies can be unstable, which adversely impacts infrastructure projects, given their high capital-intensity, long operational periods and high asset specificity. While the detrimental impact of political risk is well documented, the mitigation of such impacts on infrastructure projects remains largely unexamined. This study, therefore, addresses this by exploring the available identified political risk management (PRM) strategies based on resilience theory and evaluating their effectiveness.

Design/methodology/approach

A mixed-method approach was employed to identify PRM strategies. Firstly, a comprehensive literature review identified 40 potential PRM strategies. However, the applicability of those 40 strategies was uncertain due to the scarcity of PRM studies. Thus, expert interviews, drawing on the insights of Chinese infrastructure industry professionals with experience in FII, were applied to review the identified strategies. This process reduced the pool of applicable strategies to 34. Subsequently, 356 questionnaires were sent out to investors from China, Australia and Singapore, with 218 valid responses returned. Based on the data collected from the surveys, statistical analysis was used to evaluate and classify applicable PRM strategies.

Findings

Results reveal the most effective top five strategies for offsetting the detrimental effects of political risk on foreign infrastructure investment to be: (1) selection of suitable markets and projects; (2) maintaining good relationship with government; (3) purchasing political insurance; (4) utilizing capable contractors from both host country and home country; and (5) adopting an appropriate entry mode. The 34 strategies were further consolidated into four meta-strategies through factor analysis, resulting in the formulation of a strategy selection matrix.

Originality/value

The findings of this study offer a rational means by which infrastructure investment practitioners considering projects in developing countries, may arrive at an optimal political risk mitigation strategy. The findings also offer government of host countries directives to improving the political environment in order to attract foreign investment flows into local infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 February 2023

Malindu Sasanka Sandanayake, Zora Vrcelj, Yanni Bouras, Hing-Wah Chau and Patrick Hastings

The present study aims to inform the requirements for developing a sustainable rating tool for small-scale infrastructure projects (SSIPs) through research findings.

Abstract

Purpose

The present study aims to inform the requirements for developing a sustainable rating tool for small-scale infrastructure projects (SSIPs) through research findings.

Design/methodology/approach

A review-based comparative study of existing infrastructure sustainability (IS) rating tools for assessment of SSIPs is presented. Key stakeholder participants of the existing IS rating tools, are interviewed to identify existing barriers and requirements for sustainability rating. The study further presents possible rating tool options to optimise the sustainable performance evaluation of SSIPs.

Findings

Findings of this study indicated that prevalent IS rating tools are majorly applied to large-scale infrastructure projects and sustainability of SSIPs are seldom assessed. Based on a literature review and series of interviews, it was found that user friendliness, efficient structure, training and technical support, cost effectiveness and stakeholder recognition are the five key requirements of a sustainability rating tool for SSIPs. Additionally, six sustainability assessment options were proposed for SSIPs which range from pathways for existing tools through to new, customisable tools. Upon comparison, a new modified tool with verification process and revised tool with defined grouping of sustainable criteria was more effective for evaluation of SSIPs.

Research limitations/implications

Use of case specific information for validation and framework development may lack generalisation. However, methodology can be used for future decision-making by making necessary adjustments to suit different local regional requirements.

Originality/value

Despite lack of generalisation, the findings can lead to future general studies on sustainability of SSIPs. Findings of the study provide foundation knowledge and awareness for sustainability evaluation of SSIPs.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of over 2000