Search results

1 – 10 of over 5000
Book part
Publication date: 1 August 2019

Al-Muttar Mohammed Yousif Oudah, Anna V. Shokhnekh, Olga S. Glinskaya, Mohammed-Ikbal Shokhnekh and Ivan A. Chusov

The chapter studies the problems of formation of regional mechanisms of modernization and development of infrastructure of regions and the country, which are determined by…

Abstract

The chapter studies the problems of formation of regional mechanisms of modernization and development of infrastructure of regions and the country, which are determined by complexity of attracting private capital in financing of infrastructure, which is limited by a long return period and the level of profitability of projects. The mechanism of public–private partnership is offered, which allows leveling high risks of implementation of infrastructural projects under guidance of the state. Also, the methodology of foresight control is studied, which is the last stage of modernization and development of infrastructure of regions and the country, as innovational tools of forecasting the future, which is aimed at leveling the risks, allows determining and neutralizing the danger of nontarget usage of invested financial resources, and seeing the threats to internal environment and external environment.

Article
Publication date: 6 July 2012

Solomon Olusola Babatunde, Akintayo Opawole and Olusegun Emmanuel Akinsiku

Federal and State Governments began to explore more subtle alternatives for accessing private sector resources in the delivery and operation of public facilities. The purpose of…

4817

Abstract

Purpose

Federal and State Governments began to explore more subtle alternatives for accessing private sector resources in the delivery and operation of public facilities. The purpose of this paper is to examine the types of infrastructural projects most suitable using public‐private partnership (PPP) for executions and identify the critical success factors in PPP on infrastructural projects with a view to strengthening the partnership between the public (government) and private sector. The overall goal is to enhance infrastructural projects delivery in Nigeria.

Design/methodology/approach

The primary data consists of survey questionnaires, drawn based on the identified factors on existing literature on critical success factors (CSFs). The structured questionnaires were administered on participants that were involved in the execution of PPP projects, either during the initial stage, construction stage or maintenance and operating stages in Lagos State.

Findings

The results of the mean score ranking indicate that transportation, which include roads, rails and airports construction ranked highest followed by provision of electricity and water. Real estate and educational construction projects ranked lowest in terms of suitability of execution using PPPs. However, the result of the one‐way analysis of variance (ANOVA) indicates that, there was no significant difference in the suitability of PPP for execution of the types of infrastructural projects delivery. The paper further identified nine CSFs in public‐private partnerships as follows: competitive procurement process, thorough and realistic assessment of the cost and benefits, favorable framework, appropriate risk allocation and risk sharing, government involvement by providing a guarantee, political support, stable macroeconomic condition, sound economic policy and availability of suitable financial market. The study, however, showed that well organized and committed public agency; social support; project technical feasibility and multi‐benefits objectives are the CFSs that are most important to the private investors. On the other hand, factors such as transparency in the procurement process; shared authority between public and private sector; thorough and realistic assessment of the cost and benefits; commitment and responsibility of public and private sector and strong and good private consortium are the CSFs that are most important to the public clients.

Originality/value

The results indicated that there was no significant difference in the suitability of PPP for execution of infrastructural projects delivery. This shows that PPP is suitable for all types of infrastructural projects. What needs to be done is to ensure that all the success factors responsible for successful implementations of PPPs are well structured in a way that its optimum performance can be guaranteed. Also, in identification of the critical factors in PPP it would help to develop a body of PPP knowledge. This knowledge would help in the establishment of relevant laws, regulations and guidelines and in the development of efficient frameworks for best PPP practices.

Details

Journal of Facilities Management, vol. 10 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 2 August 2013

Martin Haran, Michael McCord, Norman Hutchison, Stanley McGreal, Alastair Adair, Jim Berry and Anil Kashyap

The purpose of this paper is to explore the implications of the Global Financial Crisis (GFC) on Public Private Partnership (PPP) markets around the world. Specifically, it aims…

Abstract

Purpose

The purpose of this paper is to explore the implications of the Global Financial Crisis (GFC) on Public Private Partnership (PPP) markets around the world. Specifically, it aims to highlight the extent of over reliance on debt finance, as well as the conditions needed to attract enhanced levels of institutional investment into key infrastructural provision.

Design/methodology/approach

Quantitative insight for the paper is derived from the Infrastructure Online Database. The Infrastructure Journal (IJ) Online Database profiles PFI/PPP deals around the world depicting the key actors involved, as well as the capital value of deals and the financial structures applied in terms of debt, equity and Multilateral and Government Finance. The quantitative insight derived from the IJ database is complemented by interview evidence and forum‐based discussion. In total, 38 interviews were conducted with a diverse range of key stakeholder groupings from across the public and private sectors, including government advisers, client side representatives (Health and Education sectors), contractors, financiers and FM providers. Interviewees were drawn from five key PPP markets at different stages in the maturity cycle, namely, Australia, Canada, India, the UK and the USA. In addition to the interviews, three forum‐based discussions were undertaken as part of the investigation exploring the key themes to emerge from the interviews from multi‐stakeholder perspectives.

Findings

The findings from the study highlight a number of inherent deficiencies in the PPP model, including the over reliance on private sector debt. Additionally, the research profiles the extent and form of national government interventions in PPP markets around the world, highlighting the need for a more innovative, sustainable and balanced funding frameworks for essential infrastructure conducive to the next economic/financial cycle.

Originality/value

This study is distinct in that it examines the cross‐jurisdictional implications of the global financial crisis on PPP markets.

Article
Publication date: 6 November 2018

Alexander Adeyemi Fakere, Clement Oluwole Folorunso, Olatunde Arayela and Yomi Michael Adedeji

This paper is based on users’ satisfaction with housing infrastructure as a derivative of their participation in evolving the facilities from inception. The paper aims to examine…

Abstract

Purpose

This paper is based on users’ satisfaction with housing infrastructure as a derivative of their participation in evolving the facilities from inception. The paper aims to examine optimal performance of infrastructural facilities with a view to determine the satisfaction of users in the study area.

Design/methodology/approach

This study reports on a cross-sectional doctoral research study on 304 household heads in the transitional and peripheral zones of Akure, Nigeria. The infrastructure studied were water supply, electricity supply, roads, drainage, waste management and security. A structured questionnaire, focus group discussions and physical observations were used. The data were analyzed using descriptive statistics, mean satisfaction scoring and categorical regression analysis.

Findings

Respondents found the infrastructural facilities in their communities to be unsatisfactory; they also indicated low levels of participation in the provision of infrastructure. Residents were most satisfied with waste management and least satisfied with water supply. The results showed a significant relationship between users’ participation and satisfaction with housing infrastructure.

Practical implications

The findings imply that giving adequate attention to users’ involvement in the provision process of infrastructural projects can enhance their satisfaction with infrastructure.

Originality/value

The study highlights the benefits of involving users in the process of providing housing infrastructure, establishing a positive relation with their satisfaction.

Details

Facilities, vol. 36 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Content available
Article
Publication date: 24 December 2021

Iram Khalid, Tooba Ahmad and Sami Ullah

Human-induced changes in climate have affected the environment to the extent that any more economic development at the cost of the environment will be too costly. Thus…

1719

Abstract

Purpose

Human-induced changes in climate have affected the environment to the extent that any more economic development at the cost of the environment will be too costly. Thus, sustainable development options posing no additional harm to the environment are the only viable option. This study aims to examine the likely environmental impacts of infrastructural developments through the China–Pakistan Economic Corridor (CPEC).

Design/methodology/approach

There is a scarcity of academic debate and discussion on the environmental impact of CPEC developments in laws and policies on the environment. The qualitative approach is followed in this study and official documents and reports are used to investigate the environmental challenges posed by CPEC.

Findings

The findings show three possible environmental concerns which could increase the climate change vulnerability of Pakistan. The coal-fired power plants are the most prominent threat based on their CO2 contributions and smog. Second, cutting more than 54,000 trees for roads infrastructure will increase CO2 concentration along the CPEC route. Third, increasing vehicle trafficking by up to 7,000 trucks per day on Karakorum Highway alone will release 36.5 million tons of additional CO2.

Originality/value

It is essential to rethink the environmental cost of CPEC. The study suggests economic and legal cooperation between Pakistan and China as a way forward to deal with climate change issues. Environmental laws should be a vital part of CPEC projects to ensure their safety, security and sustainability.

Details

International Journal of Development Issues, vol. 21 no. 1
Type: Research Article
ISSN: 1446-8956

Keywords

Article
Publication date: 1 October 1997

Kong‐Yam Tan

States that since the mid‐1980s, substantial deregulation and competitive liberalization of the South‐East Asian economies in their trade and investment regimes has resulted in…

3336

Abstract

States that since the mid‐1980s, substantial deregulation and competitive liberalization of the South‐East Asian economies in their trade and investment regimes has resulted in greater integration of their economies with the North‐East Asian economies. Proposes that, together with the rising purchasing power of the expanding middle class, massive infrastructural development, as well as the expansion in intra‐regional trade and investment, East Asia has emerged as an independent centre of growth in the global economy since the early 1990s. Presents empirical evidence on the rise of this autonomous growth momentum. Contends that, no longer a mere wagon hitched to the locomotive of the US and European economy, East Asia′s emerging independent engine of growth has tremendous implications for executives of multinationals keen to expand market share and form strategic alliances with companies in East Asia. Submits that it also has implications for fund managers in the OECD countries keen to look to the region for asset diversification and higher returns.

Details

Management Decision, vol. 35 no. 8
Type: Research Article
ISSN: 0025-1747

Keywords

Book part
Publication date: 6 December 2017

Roberto Moro Visconti, Anna Doś and Asli Pelin Gurgun

The aim of the chapter is to compare Public–Private Partnership (PPP) healthcare investments in developed countries with those in emerging economies, analysing the sustainability…

Abstract

The aim of the chapter is to compare Public–Private Partnership (PPP) healthcare investments in developed countries with those in emerging economies, analysing the sustainability issues of health-led growth. Healthcare PPP best practices in developed nations represent a template that catching-up economies may follow with local adaptations. A comparison starts from the UK case and then examines the Turkish experience as an ideal bridge between advanced and developing countries. Healthcare investments are a primary social infrastructure, with a deep impact on poverty alleviation. Demand for the infrastructure necessary to provide healthcare services has increased substantially in developing and emerging economies due to rapid economic growth, industrialization and urbanization, while public supply is limited by budget constraints. PPP best practices provide a global benchmark (World bank, 2015b). Integrated supply and value chains and management of viability milestone improve healthcare PPP sustainability and bankability. Different legal frameworks and funding issues are not thoroughly investigated. Careful customization and local fine-tuning of best practices require further scrutiny. Homogenization of best practices improves comparison of different projects, fostering competition and easing cross-border investments, accompanied by knowledge transfer, sharing and consequent value co-creation. Best practices improve value for money, bankability and resilience of PPP investments, with potential benefits for healthcare services and quality of life. This chapter makes an innovative and comprehensive comparison of healthcare PPP projects worldwide, looking for a common denominator of value-enhancing rules and resilient pro-growth strategies.

Details

The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies
Type: Book
ISBN: 978-1-78714-494-1

Keywords

Book part
Publication date: 7 August 2019

Andreas Folkers

The chapter analyses the role of smart grid technology in the German energy transition. Information technologies promise to help integrate volatile renewable energies (wind and…

Abstract

The chapter analyses the role of smart grid technology in the German energy transition. Information technologies promise to help integrate volatile renewable energies (wind and solar power) into the grid. Yet, the promise of intelligent infrastructures does not only extend to technological infrastructures, but also to market infrastructures. Smart grid technologies underpin and foster the design of a “smart” electricity market, where dispersed energy prosumers can adapt, in real time, to fluctuating price signals that register changes in electricity generation. This could neutralize fluctuations resulting from the increased share of renewables. To critically “think” the promise of smart infrastructure, it is not enough to just focus on digital devices. Rather, it becomes necessary to scrutinize economic assumptions about the “intelligence” of markets and the technopolitics of electricity market design. This chapter will first show the historical trajectory of the technopolitical promise of renewable energy as not only a more sustainable, but also a more democratic alternative to fossil and nuclear power, by looking at the affinities between market liberal and ecological critiques of centralized fossil and nuclear based energy systems. It will then elucidate the co-construction of smart grids and smart markets in the governmental plans for an “electricity market 2.0.” Finally, the chapter will show how smart grid and smart metering technology fosters new forms of economic agency like the domo oeconomicus. Such an economic formatting of smart grid technology, however, forecloses other ecologically prudent and politically progressive ways of constructing and engaging with intelligent infrastructures.

Article
Publication date: 17 October 2010

Marieke Fijnvandraat and Harry Bouwman

The objective of this paper is to offer a validated framework for the analysis of (future) risks and uncertainties involved in the decision‐making process concerning the upgrade

1032

Abstract

Purpose

The objective of this paper is to offer a validated framework for the analysis of (future) risks and uncertainties involved in the decision‐making process concerning the upgrade and roll‐out of large infrastructural projects, e.g. broadband networks. The framework classifies risks and uncertainties based on the nature of the risks, levels and sources.

Design/methodology/approach

The approach takes the form of conceptual as well as qualitative and quantitative empirical analyses.

Findings

Telecommunications operators are faced with various types of risks and uncertainties in their decision‐making process concerning the upgrade and roll‐out of their broadband networks. In one respect, these risks and uncertainties have to do with the characteristics of large infrastructural projects, while, on the other hand, being caused by (unknown) competitor behaviour, (unknown) end‐user demand, rapid technological development and different development paths available to operators. Framing risks and uncertainties into a typology provides greater insight into the categories, characteristics and sources of the risks and uncertainties, as well as being a first step in finding ways to deal with them.

Originality/value

The paper presents and validates a framework for the analysis of risks and uncertainty. It also offers empirical data on how operators manage risk and uncertainties.

Details

Foresight, vol. 12 no. 6
Type: Research Article
ISSN: 1463-6689

Keywords

Open Access
Article
Publication date: 14 August 2021

Tomasz Kusio

According to the growing role of stakeholders in the implementation of public-private partnership (PPP) initiatives, the purpose of this study is to diagnose the maturity of PPPs…

1367

Abstract

Purpose

According to the growing role of stakeholders in the implementation of public-private partnership (PPP) initiatives, the purpose of this study is to diagnose the maturity of PPPs in Poland, taking into account the range of stakeholders’ participation in public-private initiatives.

Design/methodology/approach

The introductory study on the stakeholders of PPPs has been based on the report analysis of Polish initiatives and the case studies’ comparative analysis. The cases represent touristic projects realized within PPPs.

Findings

The results of the study indicate that the PPPs’ personal context, though recognized internationally, is to a very low extent present in the Polish case. As the PPP market is still in the process of development, the stakeholders’ issue should be taken into consideration in the processes of the PPP development in Poland.

Practical implications

As regional development is continuously a key issue, especially in rural areas context, the PPP initiatives are of great importance, and therefore the discussion of pros and cons in this context may contribute to the legislation at the regional level.

Originality/value

The study sheds some light and gives some interesting perspectives on the issue of the personal context of PPPs and social capital. Also, the text describes the path of developing PPPs in Poland and especially the touristic projects. The research part presents the original case study comparative analysis based on table-oriented form and as such enables the new way of contextual analysis.

Details

International Journal of Organizational Analysis, vol. 29 no. 6
Type: Research Article
ISSN: 1934-8835

Keywords

1 – 10 of over 5000