Search results

1 – 2 of 2
Article
Publication date: 28 December 2023

Min Luo, Bon-Gang Hwang, Xianbo Zhao and Xiaopeng Deng

This study aims to clarify the psychological mechanism of international contractors' fraud by linking performance pressure to fraudulent intention through the displacement of…

Abstract

Purpose

This study aims to clarify the psychological mechanism of international contractors' fraud by linking performance pressure to fraudulent intention through the displacement of responsibility and addressing the moderating role of moral intensity.

Design/methodology/approach

Based on moral disengagement theory, performance pressure was hypothesized to be positively associated with fraudulent intention by mediating the displacement of responsibility. Drawing on the issue-contingent theory, moral intensity was hypothesized to inhibit the relationship between performance pressure and displacement of responsibility in three aspects: magnitude of consequences (MC), probability of effect (PE) and social consensus (SC). The scenario-based questionnaire was conducted to collect information from contractors spread across 50 countries. The partial least squares structural equation modeling was employed to assess the proposed model.

Findings

The results demonstrated that performance pressure was positively associated with the fraudulent intention, and displacement of responsibility exerted a positive partial mediating impact between performance pressure and fraudulent intention. Regarding moral intensity in the moderating analysis, the negative moderating role of MC and PE was significant, while that of SC was insignificant.

Practical implications

This study provides international construction practitioners with a deep understanding of the formation mechanism of fraud at the psychological level.

Originality/value

It clarifies the psychological mechanism from performance pressure to fraudulent intention by integrating a mediation impact from the displacement of responsibility and a moderation effect from MC and PE. It contributes to the sparse research on how situational factors shape individuals' fraudulent intentions in the international context. It provides a fresh perspective on fraud by constructing a formation model from moral psychological theories.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print