Search results
1 – 4 of 4Haibo Feng, Mohamad Kassem, David Greenwood and Omar Doukari
Whole building life cycle assessment (WBLCA) is a key methodology to reduce the environmental impacts in the building sector. Research studies usually face challenges in…
Abstract
Purpose
Whole building life cycle assessment (WBLCA) is a key methodology to reduce the environmental impacts in the building sector. Research studies usually face challenges in presenting comprehensive LCA results due to the complexity of assessments at the building level. There is a dearth of methods for the systematic evaluation and optimization of the WBLCA performance at the design stage. The study aims to develop a design optimization framework based on the proposed WBLCA method to evaluate and improve the environmental performance at the building level.
Design/methodology/approach
The WBLCA development method is proposed with detailed processes based on the EN 15978 standard. The environmental product declaration (EPD) methods were adopted to ensure the WBLCA is comprehensive and reliable. Building information modeling (BIM) was used to ensure the building materials and assembly contributions are accurate and provide dynamic material updates for the design optimization framework. Furthermore, the interactive BIM-LCA calculation processes were demonstrated for measuring the environmental impacts of design upgrades. The TOPSIS-based LCA results normalization was selected to conduct the comparisons of various building design upgrades.
Findings
The case study conducted for a residential building showed that the material embodied impacts and the operational energy use impacts are the two critical factors that contribute 60–90% of the total environmental impacts and resource uses. Concrete and wood are the main material types accounting for an average of 65% of the material embodied impacts. The air and water heating for the house are the main energy factors, as these account for over 80% of the operational energy use. Based on the original WBLCA results, two scenarios were established to improve building performance through the design optimization framework.
Originality/value
The LCA results show that the two upgraded building designs create an average of 5% reduction compared with the original building design and improving the thermal performance of the house with more insulation materials does not always reduce the WBLCA results. The proposed WBLCA method can be used to compare the building-level environmental performances with the similar building types. The proposed framework can be used to support building designers to effectively improve the WBLCA performance.
Details
Keywords
Barbara X. Rodriguez, Kathrina Simonen, Monica Huang and Catherine De Wolf
The purpose of this paper is to present an analysis of common parameters in existing tools that provide guidance to carry out Whole Building Life Cycle Assessment (WBLCA) and…
Abstract
Purpose
The purpose of this paper is to present an analysis of common parameters in existing tools that provide guidance to carry out Whole Building Life Cycle Assessment (WBLCA) and proposes a new taxonomy, a catalogue of parameters, for the definition of the goal and scope (G&S) in WBLCA.
Design/methodology/approach
A content analysis approach is used to identify, code and analyze parameters in existing WBLCA tools. Finally, a catalogue of parameters is organized into a new taxonomy.
Findings
In total, 650 distinct parameter names related to the definition of G&S from 16 WBLCAs tools available in North America, Europe and Australia are identified. Building on the analysis of existing taxonomies, a new taxonomy of 54 parameters is proposed in order to describe the G&S of WBLCA.
Research limitations/implications
The analysis of parameters in WBLCA tools does not include Green Building Rating Systems and is only limited to tools available in English.
Practical implications
This research is crucial in life cycle assessment (LCA) method harmonization and to serve as a stepping stone to the identification and categorization of parameters that could contribute to WBLCA comparison necessary to meet current global carbon goals.
Social implications
The proposed taxonomy enables architecture, engineering and construction practitioners to contribute to current WBLCA practice.
Originality/value
A study of common parameters in existing tools contributes to identifying the type of data that is required to describe buildings and contribute to build a standardized framework for LCA reporting, which would facilitate consistency across future studies and can serve as a checklist for practitioners when conducting the G&S stage of WBLCA.
Details
Keywords
Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey
Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…
Abstract
Purpose
Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.
Design/methodology/approach
The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.
Findings
The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.
Originality/value
This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.
Details