Search results

1 – 8 of 8
Article
Publication date: 11 January 2024

Clinton Aigbavboa, Andrew Ebekozien, Emmanuel Kofi Afetorgbor, Bernard Martins Arthur-Aidoo and Wellington Didibhuku Thwala

Several organisations dedicate a portion of their budget and business websites to corporate social responsibility (CSR) events. This illustrates the significance attached to CSR…

Abstract

Purpose

Several organisations dedicate a portion of their budget and business websites to corporate social responsibility (CSR) events. This illustrates the significance attached to CSR events. In Ghana, a social disconnection may exist between the community and the construction sector. Therefore, this research aims to investigate the benefits of CSR in the construction industry, the implementation challenges and measures to enhance CSR in the Ghanaian built environment.

Design/methodology/approach

The qualitative technique was adopted using an extensive review of literature supported by structured interviews and analysed by context analysis. The participants include ministry and municipal directors, contractor associations, unions and institutions of engineers. The study achieved saturation.

Findings

Findings reveal that the construction industry’s CSR impacts the community’s social behaviour and has economic and environmental significance. The absence of government implementation policy and finance constraints were identified as Ghana’s major CSR implementation challenges. Also, besides the government instituting a mandatory policy on CSR in the industry, findings suggest that stakeholders, especially players in the industry and policymakers, should form an integral part of the CSR decisions.

Practical implications

Findings will support and recommend holistic measures to mitigate CSR implementation hindrances and encourage CSR via a central government's mandatory policy in the Ghanaian built environment.

Originality/value

Besides most studies used questionnaires, the contribution deduced shows that construction companies' management could use the knowledge from this study and involve all the relevant stakeholders when undertaking CSR activities. Also, the study would fill the scarcity of relevant materials concerning CSR in Ghanaian construction sector.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Open Access
Article
Publication date: 13 October 2023

Clinton Ohis Aigbavboa, Lawrence Yao Addo, Andrew Ebekozien, Wellington Didibhuku Thwala and Bernard Martins Arthur-Aidoo

Access to clean drinking water is a major encumbrance in developing countries. In Ghana, urban water supply is below internationally recognised standards, especially among the…

Abstract

Purpose

Access to clean drinking water is a major encumbrance in developing countries. In Ghana, urban water supply is below internationally recognised standards, especially among the urban poor, sub-urban and rural communities. Stakeholders and institutional inefficiencies may be hindrances facing the Ghanaian water supply process. Therefore, this study aims to appraise the motivational factors and outcome of stakeholders’ engagement and identify the factors that influence effective institutional management of urban water supply in Ghana.

Design/methodology/approach

Sequential exploratory mixed methods were adopted and analysed to proffer answers to the research questions. Nineteen participants and 521 respondents were sampled for the qualitative and quantitative phases.

Findings

Findings reveal that the institutional processes and stakeholder engagement significantly influence the effectiveness of the management of urban water supply in Ghana. Findings identified 35 motivational factors and categorised them into the health of the population, socio-economic, technological and innovation trends, policy reform and adaptive governance. Also, the 22 institutional factors identified were categorised into three groups: regulatory framework, ethics for managing water supply and the culture of managing water supply.

Originality/value

Besides the study addressing the theoretical gap regarding which variables are germane in influencing the effective management of urban water supply, the study may be among the top studies that have appraised the role of stakeholders in the institutional management of urban water supply in Ghana.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 4 May 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa, Samuel Adeniyi Adekunle, John Aliu and Wellington Didibhuku Thwala

Studies show that the twenty-first-century construction industry needs reskilling and upskilling tools to train large numbers of the workforce for better-integrated project…

Abstract

Purpose

Studies show that the twenty-first-century construction industry needs reskilling and upskilling tools to train large numbers of the workforce for better-integrated project delivery. Evidence shows that digitisation via the fourth industrial revolution (4IR) technology can play a critical role in reskilling and competency demand. Attempting to use digital technology may have had some challenges. Studies about the perceived hindrances facing Nigeria's built environment professionals (BEP) reskilling and upskilling needs in the workplace via 4IR technologies are scarce. Thus, the study investigated the perceived encumbrances facing Nigeria's BEP training needs and proffered measures to improve their performance in the workplace via 4IR technologies.

Design/methodology/approach

The researchers engaged BEP in Lagos and Abuja, Nigeria. Regarding the data collection, a qualitative research design was adopted. The study achieved saturation after 32 virtual interviews. A thematic analysis was adopted for the collected data.

Findings

The study shows that using 4IR for reskilling and upskilling will enhance integrated project delivery. But the level of usage in training needs is low. Findings identified the various ways reskilling and upskilling could be achieved. Also identified are the major built environment areas that require 4IR training. Findings highlighted possible encumbrances facing the use of 4IR technologies by Nigerian BEP for reskilling and upskilling needs in the workplace and proffered feasible measures to improve 4IR usage for training needs.

Research limitations/implications

The study is restricted to the perceived encumbrances and proffers measures to improve BEP reskilling and upskilling needs via 4IR technologies via a qualitative method. Future research is required to validate the findings and test the proposed framework that emerged from the study.

Practical implications

The study confirms that reskilling and upskilling measures are required at all skill levels and may lead to economic growth. The paper would advance Nigerian higher educational accreditation agencies and various BEP regulatory bodies to review the curriculum and incorporate 4IR as a component or module.

Originality/value

The thematic network analysis and proposed framework could be utilised to stimulate Nigeria's BEP reskilling and upskilling needs in the workplace via 4IR technologies. It would stir main stakeholders, especially government policymakers, to facilitate programmes to improve 4IR technologies usage.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 December 2022

Timothy Adu Gyamfi, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot…

Abstract

Purpose

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana.

Design/methodology/approach

The researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices.

Findings

The results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations.

Research limitations/implications

To incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables.

Originality/value

The study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 December 2022

Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…

Abstract

Purpose

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.

Design/methodology/approach

A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.

Findings

Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.

Practical implications

The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.

Originality/value

Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 March 2022

Ephraim Zulu, Sambo Lyson Zulu, Mwansa Chabala, Neema Kavishe, Charles Chifunda and Innocent Musonda

While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to…

Abstract

Purpose

While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to which design teams in developing countries consider environmental sustainability at the building design stage. Therefore, using Zambia as a case study, this study examined the extent to which infrastructure design teams in a developing country consider environmental sustainability at the design stage.

Design/methodology/approach

The study used a qualitative research approach using structured interviews because there are hardly any studies which have explored the extent to which designers incorporate environmental sustainability in infrastructure designs in developing countries. The data is analysed thematically using the ATLAS.ti software.

Findings

The results show that environmental sustainability is not an important design consideration because it is secondary to functional, technical and aesthetic considerations. Environmental considerations are also made in an ad hoc manner and when it is cost-effective for the project. Regulatory requirements pertaining to environmental protection are adhered to without any cost considerations. It was, therefore, theorised that building design teams in developing countries make technical, functional and aesthetic consideration during the infrastructure design stage ahead of environmental considerations.

Originality/value

There is a paucity of studies that have investigated whether building infrastructure designers consider issues of environmental sustainability at the design stage in developing countries. The findings have practical implications on how developing countries can foster environmental sustainability at the design stage and avoid generating a building infrastructure stock that will require environmental resilience adaptation in the future.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 8 of 8