Article
Publication date: 18 June 2021

Pramen P. Shrestha and Jacimaria R. Batista

The purpose of this study is to determine the barriers and constraints executive decision-makers have to face during the delivery method selection stage of water and wastewater

Abstract

Purpose

The purpose of this study is to determine the barriers and constraints executive decision-makers have to face during the delivery method selection stage of water and wastewater projects using alternative project delivery (APD) methods, e.g. design-build (DB), design-build-operate (DBO) and construction management-at-risk (CMAR).

Design/methodology/approach

Structured interviews were conducted with 18 executive decision-makers from public agencies to identify the reasons for transitioning to APD from the design-bid-build (DBB) method. Respondents were also asked about the major obstacles they faced during the decision-making process, as well as key positive and negative factors in using APD methods. The executive decision-makers were also asked about their lessons learned during this process. In addition, this study collected key steps in making APD water and wastewater projects successful. All of the findings from the interview phase were validated by seven public agency executive decision-makers of water and wastewater industries.

Findings

One major study finding was that executive decision-makers chose the APD method because it provided cost and schedule benefits and the owner could also choose the designer or builder based on qualifications. The study also found that the main obstacles executive decision-makers faced were: (1) difficulty in implementing APD methods because they do not follow the low-bid process, (2) reluctance to use DB/CMAR because of the status quo and (3) unfamiliarity of city councils/elected commissions with the DB/CMAR process. The validation survey found that most findings from the initial phase of interviews were confirmed by the executives who took part in validation phase.

Research limitations/implications

The major limitation of this research is the small sample size. As the executive decision-makers are very hard to reach for interviews, the authors failed to get interviews from a large number of them, despite repeated efforts made by the authors. Another limitation of this study is that the authors contacted most of the executive decision-makers listed in the WDBC list. These executive decision-makers worked for public agencies and, therefore, the views from private agencies could not be included in this research. The authors understand that the validation of the study findings is very important. However, due to the scope and limited time available for the research, the authors could not validate the findings of this study with other public agencies.

Practical implications

Selecting APD methods instead of DBB methods in water and wastewater projects for public agencies is a crucial issue during the project planning phase. Agencies' executive decision-makers need to understand the advantages and disadvantages of APD methods, along with the transition process in order to smoothly deliver projects. The findings of this study will assist public agency executive decision-makers to mitigate risks, overcome obstacles and become more educated about the APD method process, so that these projects can be successfully delivered within budget and on time.

Originality/value

This paper contributes to the existing body of knowledge by identifying lessons learned related to various APD method issues, which can be utilized by municipal executive decision-makers to successfully complete future APD projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2019

Elie Georges Andary, Caesar Abi Shdid, Arindam Chowdhury and Irtishad Ahmad

The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years…

Abstract

Purpose

The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the key performance indicators (KPIs) of these projects. Numerous studies have been published about the benefits offered by integrated project delivery (IPD) in improving the delivery of DBB projects. Links correlating IPD principles to improvements in KPIs of DBB construction projects have not been established scientifically, thus leaving owners with no guidance on which IPD principle(s) to implement in order to improve a particular project KPI. The paper aims to discuss this issue.

Design/methodology/approach

Actual data were collected from 43 water and wastewater construction projects – including two control projects with full implementation of selective IPD principles – and used to compute major projects KPIs. Regression analysis and a focus group are then utilized to determine the effect of each implemented IPD principle on various project KPIs.

Findings

Implementation of open communication was found to have a significant effect on reducing project cost overrun, and the co-location of teams significantly reduced the time to respond to RFIs. Collaborative decision making significantly reduced the cost of field rework. Other IPD principles showed less-significant effects on project KPIs and were concluded to be ineffective at improving the projects’ performance.

Practical implications

An implementation framework is developed that can guide utility owners on which IPD principle(s) to implement in order to improve specific project KPIs.

Originality/value

This study demonstrates that not all IPD principles will result in performance improvement of a project. A selective and cost-effective implementation of certain IPD principle will have to be based on the nature of the project and the particular KPIs targeted for improvement.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2021

Omid Amiri, Amir Ayazi, Mahmoud Rahimi and Garshasb Khazaeni

Water and wastewater (WW) projects are gaining attention in Iran because of shortages of water resources. However, these projects are lengthy and they are accompanied by numerous…

Abstract

Purpose

Water and wastewater (WW) projects are gaining attention in Iran because of shortages of water resources. However, these projects are lengthy and they are accompanied by numerous risks, such as lack of sufficient financial resources. Public–private partnerships (PPPs) are taken into account as a constructive approach to deal with the problem of insufficient government funds and they are increasingly being implemented to construct the required infrastructures in different countries. Although WW projects in PPPs can reduce the government’s debt, investors are still uncertain about this approach. Hence, this study aims to identify and evaluate the risk of all parties involved in WW-PPP projects, from the viewpoint of investor.

Design/methodology/approach

First, the risk factors which are involved in WW projects are identified by interviewing experts and reviewing the literature by means of fault tree analysis (FTA) tool. Second, the probability and effects of the risky factors which are related to specific event are evaluated and analyzed by hybridization of interval fuzzy Type-2 sets (IT2FS) and risk score formulation. Finally, some solutions are proposed to deal with the most challenging risks.

Findings

Six gate events, namely, risks which are related to investors such as investor’s consultant-related risks, risky conditions from engineering, procurement, and construction (EPC) contractors’ point of view, risk factors which public sector takes into account, public sector’s consultant-related risks which public sector’s consultant consider challenging and external factors were defined according to the literature. From FTA tool and by interviewing the experts, 94 basic events were identified. Finally, from hybridization of IT2FSs and risk score formulation, top five risks are determined as “Difficulty of injecting financial resources into the project,” “Fluctuation in inflation rate,” “Poor decision-making process” in public sector, “Difficulty of importing the equipment which are required for the project (such as pumps, grain catchers, garbage collectors, etc.) from other countries” and “Impact of risky conditions in other projects on operation of PPP project.”

Originality/value

In the absence of a constructive approach for risk identification and a reliable model for evaluating the identified risks in PPP projects, this research project is one of the first research studies which used FTA for identifying risks and hybridization of IT2FSs and risk score formulation for evaluating the risks.

Details

Construction Innovation , vol. 22 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 July 2020

Andrew Kamunda, Suresh Renukappa, Subashini Suresh and Haddy Jallow

The UK water industry is a private sector that has no government mandate to implement building information modelling (BIM) but would benefit from its use. Research has identified…

Abstract

Purpose

The UK water industry is a private sector that has no government mandate to implement building information modelling (BIM) but would benefit from its use. Research has identified that fragmentation and inefficiency still existed in the water industry project delivery processes. These issues can be addressed by harnessing the collaboration that BIM brings by using emerging information technology. The UK water industry has had little research in the use of BIM in the project delivery processes over the years.

Design/methodology/approach

The aim of the research is to explore and examine BIM elements currently used in the water industry, as well as understand the organisational cultural support for BIM. It also investigated the adoption of BIM which will enable to improve water industry project delivery processes. An empirical study was performed in the UK given the relatively new and unexplored nature of the research problem, a qualitative research methodology was adopted. In total, 14 semi-structured interviews from six water sector organisations were conducted to collect data, which was then analysed using thematic analysis for inference and conclusion.

Findings

The study identified that BIM has already changed how projects are delivered by the water companies and their supply chain. Use of emerging technology such as Autodesk Revit, Civil 3D and virtual reality has gained traction and is leading organisations to continue investing in these areas to remain relevant. Although staff training was offered by all organisations within the study cohort, some interviews still thought that more can be done by their organisations as BIM is still maturing. Those interviewed regarded BIM models as data and information rich with the ability to enable the supply chain to obtain quicker approvals.

Originality/value

The paper provides a richer insight into the understanding and awareness of BIM elements used in the water industry to improve project delivery processes. This study suggests that the water industry supply chain has taken positive steps and started to benefit from BIM use. It also recommends that there is a need for cross-sector collaboration to capture and share best and worst practices relating to BIM adoption in the water sector.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 November 2019

Jeffrey Feghaly, Mounir El Asmar, Samuel Ariaratnam and Wylie Bearup

The purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method…

501

Abstract

Purpose

The purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method for their water treatment plant projects.

Design/methodology/approach

The selection factors were identified by compiling and validating key project delivery selection factors across various industries through an extensive literature review and two industry expert workshops. This resulted in the development of a web-based decision-support tool to facilitate project delivery method selection within the water industry.

Findings

The research effort led to the identification of 13 key project delivery method selection factors (seven primary factors and six secondary factors) for water treatment plant projects. These factors were utilized to develop EXPRSS-TP, a pioneering web-based project delivery method decision-support tool for the water industry.

Practical implications

A project delivery method selection process is typically an informal process that may range from days to weeks at a time. Based on this work, the assessment can now be completed in about one hour and provides decision-makers with the most favorable delivery method for their project. And with the new tool that encompasses the new knowledge, not only is the decision reached at an accelerated pace, EXPRSS-TP also documents the entire selection process, allowing for a written and retained record of this key decision and its procedure.

Originality/value

This paper contributes to the exisiting body of knowledge by identifying key project delivery selection factors across numerous industries, assessing and combining them, and finally incorporating them into one comprehensive process. EXPRSS-TP improves the traditional project delivery method selection process and provides evidence-based project delivery method selection recommendations.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 September 2014

Marcus Jefferies, Graham John Brewer and Thayaparan Gajendran

There has been a significant increase in the use of relationship contracting in the global construction industry, with strategies such as Partnering, Alliancing and Public-Private…

3182

Abstract

Purpose

There has been a significant increase in the use of relationship contracting in the global construction industry, with strategies such as Partnering, Alliancing and Public-Private Partnerships all used. These approaches were introduced to the Australian construction industry in the 1990s in an attempt to overcome the adversarial nature of traditional contracting methods. The purpose of this paper is to investigate factors that influence the successful implementation of Project Alliancing by means of a case study approach focusing on the procurement of a large water treatment plant. The research findings identify critical success factors (CSFs) both from literature and the case study project.

Design/methodology/approach

The research traces the origins of Alliancing and identifies CSFs by reviewing literature and analysing a current case study project. The paper first identifies CSFs on a global scale by establishing a theoretical framework of CSFs and then compares this to the case study project. A case study of an Australian Alliance project is investigated whereby a semi-structured interview process, involving senior managers from the six partners from the Alliance, was used in conjunction with a review of project documentation. The findings of the case study project are compared to the literature and any new CSFs are identified.

Findings

Alliancing helps to establish and manage the relationships between all parties, remove barriers and encourage maximum contribution to achieve success. Alliancing provides a project delivery method that promotes open communication, equality and a systematic problem resolution process. Team culture focusing on an “open book/no blame” approach is vital to the success of an Alliance. Five CSFs were identified as specifically influencing the success of the case study project: the use of an integrated Alliance office; the staging of project and stretch targets; establishing project specific key performance indicators; facilitating on-going workshops; and the integration of a web-based management programme.

Originality/value

The research findings assist both public and private sectors by identifying factors that are critical for success in Alliancing. Five additional factors were identified as specifically influencing the success of the case study project. Since this research was conducted, Australia has seen a further increase in relationship contracting where the likes of Alliancing is often used as the default approach for certain Public Sector projects. Ongoing research into Alliancing is vital to ensure the development of sustainable procurement models, successful operational viability, fair risk distribution and value for money.

Details

Engineering, Construction and Architectural Management, vol. 21 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2021

Mohammad Vahdatmanesh, Afshin Firouzi and James Olabode Bamidele Rotimi

Post-disaster housing reconstruction (PDHR) demands a considerable percentage of global property investment, yet the post-disaster environment presents intricate challenges to…

Abstract

Purpose

Post-disaster housing reconstruction (PDHR) demands a considerable percentage of global property investment, yet the post-disaster environment presents intricate challenges to reconstruction financing for governments and at the same time, revenue uncertainty for private investors. The purpose of this study is to develop a methodology for tackling land shortage and the financial challenges of PDHR in the aftermath of a disaster.

Design/methodology/approach

This study developed a methodology based on a combined minimum revenue guarantee and maximum revenue cap model using a well-established real options analysis (ROA) for revenue risk sharing in PDHR projects and land readjustment (LR) for finance. The applicability of the purported model is demonstrated through an illustrative example.

Findings

The results show that flexibility in the options could increase the PDHR contractor’s risk profile by increasing the expected value of the contractor investment and reducing the probability of investment loss. On the other side, a cap on the contractor revenue stream would allow the government to benefit from any excess in revenue and would counterbalance the value of the option.

Practical implications

The framework proposed in this study could serve as a practical risk-revenue sharing in PDHR projects. Governments and policymakers could use the findings to enable the successful delivery of PDHR projects and consequently bring the quality of life of affected people to pre-disaster conditions.

Originality/value

This study can be considered as a first attempt toward the use of the Australian barrier style options structure, and the trinomial lattice valuation model in PDHR projects, which incorporates LR, public-private partnerships, governmental guarantees and PDHR concepts in one ROA-based framework.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 17 July 2020

Mayssa Kalach, Mohamed-Asem Abdul-Malak and Issam Srour

The purpose of this paper is to analyse the impact of schedule compression under alternative project delivery methods (APDMs) on the design information release (DIR). The…

Abstract

Purpose

The purpose of this paper is to analyse the impact of schedule compression under alternative project delivery methods (APDMs) on the design information release (DIR). The objectives are to understand the dynamics and the respective implications of the DIR under alternative design-construction (DC) modes (e.g. fast-track).

Design/methodology/approach

The methodology of work includes: (1) identifying the relevant factors that may impact the release of design deliverables under APDMs, (2) representing the selected APDMs with corresponding DC sequencing modes and (3) conceptualizing the possible alternative dynamics of the released deliverables.

Findings

The findings reveal that in contrast to the traditional one-time packaging of design deliverables, multiple DIR – with less certainty on their scope, timing, frequency and coordination quality – are released under alternative DC modes. This uncertainty mainly emanates from the deduced impact of the identified factors (e.g. DC overlapping intensity and degree of pressure by the builder) on the design deliverables dynamics.

Practical implications

This study can be of benefit to Architecture/Engineering (A/E) professionals as well as to project owners in better planning for their roles and responsibilities under each of the identified modes, as it helps raising their awareness on new issues brought about by APDMs. For instance, the presented analysis indirectly informs designers, design review professionals and project owners about a potentially increased liability exposure emanating from the reduced certainty on the DIR's coordination quality. Moreover, it informs design managers about the need for a design team's re-formation and/or re-structuring (i.e. of the involved staff) in order to accommodate for the hypothesized DIR dynamics.

Originality/value

This work offers a novel study that theorizes the impact of time-reduction-related factors, under alternative DC modes, on the release of design deliverables.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 April 2021

Laura Panadès-Estruch

This article critically analyses the extent to which selected Public-Private Partnerships (PPPs) transportation projects in the Caribbean subregion embrace good practices and how…

1987

Abstract

Purpose

This article critically analyses the extent to which selected Public-Private Partnerships (PPPs) transportation projects in the Caribbean subregion embrace good practices and how they benefit the public sector.

Design/methodology/approach

The article begins with the general rationale of PPPs, leading to a discussion on the specific challenges of the Caribbean subregion and an assessment of certain critical projects. The sample cases include the L F Wade International Airport in Bermuda, the cruise berthing and cargo port redevelopment project in the Cayman Islands, and the Sanger International Airport in Jamaica. There are five aspects to the critical assessment: (a) an evaluation of the type of PPP arrangement used; (b) the legal/policy framework; (c) financial implications; (d) accountability; and (e) miscellaneous data. Desk-based research is conducted as supported by both international and local sources to convey a uniquely local perspective in this under-researched area of scholarship.

Findings

PPP frameworks in the Caribbean are improving quickly but remain a work in progress. Jamaica leads the region. Bermuda trails behind. Problems of legal compliance with frameworks and limited market engagement persist, leading to risk management problems.

Originality/value

This article fills a literature gap on critical analysis of individual Caribbean PPP transportation projects. Previous reports, mostly by international organisations, cover regional or sectorial trends. Other sources take a descriptive but not critical approach.

Details

Public Administration and Policy, vol. 24 no. 1
Type: Research Article
ISSN: 1727-2645

Keywords

Open Access
Article
Publication date: 27 April 2022

Fahmida Akhter, Mohammad Rokibul Hossain, Hamzah Elrehail, Shafique Ur Rehman and Bashar Almansour

The study seeks to evaluate the extent and quality of environmental reporting following a longitudinal analysis and covering a wide spectrum of industries in a single frame. The…

5954

Abstract

Purpose

The study seeks to evaluate the extent and quality of environmental reporting following a longitudinal analysis and covering a wide spectrum of industries in a single frame. The study also attempts to identify the set of most favored environmental reporting items by firms and items which are least disclosed. Furthermore, the study attempts to test whether certain corporate attributes such as firm size, age of the firm, leverage ratio, profitability, presence of independent directors in the board and gender diversity have any influencing power over environmental disclosure practices. The whole study has been carried out from legitimacy theory setting.

Design/methodology/approach

The study follows longitudinal analysis to identify the extent and quality of environmental disclosures. A self-constructed checklist of 12 environmental reporting items has been developed analyzing the annual report and content analysis method is followed to measure the extent and quality of environmental disclosures and identify environmental reporting items which are mostly disclosed and which are least disclosed. The study further uses panel data regression analysis to investigate whether certain corporate attributes have any impact on environmental disclosures using multiple linear regression. Total of 345 annual reports of listed financial and nonfinancial institutions have been observed in this study ranging from 2015 to 2019.

Findings

The key finding suggests that strict enforcement of Green Banking Rules 2011 fosters country’s commercial banks to invest more to protect the environment and commercial banks encourage nonfinancial institutions for environmental performance and related disclosures through finance. Therefore, almost 50% of sample firms disclose their environmental performance through reporting in either narrative, quantitative or monetary format which was only 2.23% in the last decade. Findings also reveal that tree plantation is the most reported environment disclosure followed by investment in renewable energy and green infrastructural projects and the least reported items are fund allocation for climatic changes and carbon management policy. Further analysis shows that firm size and leverage ratio both have positive impact on environmental reporting.

Research limitations/implications

An in-depth analysis may be conducted to identify why certain environmental items are least disclosed such as fund allotment for climatic changes, carbon management policy, etc. and how corporations may earn social appreciation and motivation by investing in those least preferred items in legitimacy theory setting. Future research may also take into consideration other corporate attributes which are not considered in the study.

Originality/value

The study conducted an in-depth analysis to understand the most favored form of environmental disclosures (narrative/quantitative/monetary) and their extent after incorporation of regulatory guidelines, which is the first of its kind in the research of environmental disclosures. The study indeed contributes to the documentation of environmental reporting in the context of a developing country where there is a lack of longitudinal analysis from the lens of legitimacy theory. Moreover, a wide spectrum of industries has been taken into consideration which facilitates the generalized findings on the environmental disclosure practices of corporations in Bangladesh.

研究目的

本研究擬評估公司報告環境方面的程度和質量, 以及對就環境報告披露而言、最受青睞和最不受歡迎的項目加以處理。研究亦擬測試企業屬性對實踐環境信息披露的影響。

研究方法

研究使用內容分析法、去測量環境信息披露的程度和質量。研究使用多元回歸分析、去探討企業屬性對環境信息披露的影響。研究涵蓋孟加拉國上市公司共345個年度報告, 涵蓋的年期為2015年至 2019年。

研究結果

研究結果似乎顯示綠色金融規則 - 2011 、成功鼓勵機構為保護環境而投放更多資源; 機構最樂於匯報的項目為植樹, 而披露最少的則為氣候變化和碳管理政策。進一步的研究分析顯示, 公司的規模和杠杆比率均會對環境匯報帶來正面的影響。

研究的原創性/新穎性

本研究豐富了關於發展中國家環境匯報的官方文件記錄, 而在這類國家, 透過合法化理論而進行的縱貫性分析研究頗為缺乏。本研究以深度分析法、去瞭解環境信息披露方面最受青睞的信息披露方式 (故事形式的敘述/定量形式/金融形式), 也去瞭解納入強制的規管指引後環境信息披露的程度; 就此而言, 本研究為這類環境信息披露研究的首個研究。