Search results

1 – 10 of 16
Article
Publication date: 19 September 2019

Jinying Xu, Ke Chen, Anna Elizabeth Zetkulic, Fan Xue, Weisheng Lu and Yuhan Niu

The practice of facility management (FM) has been evolving with the rapid development of pervasive sensing technologies (PSTs) such as sensors, automatic identification (auto-ID)…

Abstract

Purpose

The practice of facility management (FM) has been evolving with the rapid development of pervasive sensing technologies (PSTs) such as sensors, automatic identification (auto-ID), laser scanning and photogrammetry. Despite the proliferation of research on the use of PSTs for FM, a comprehensive review of such research is missing from the literature. This study aims to cover the knowledge void by examining the status quo and challenges of the selected PSTs with a focus on FM.

Design/methodology/approach

This paper reviewed 204 journal papers recounting cases of using PSTs for FM. The reviewed papers were extracted from Elsevier Scopus database using the advanced search.

Findings

Findings of this study revealed that PSTs and FM applications form a many-to-many mapping, i.e. one PST could facilitate many FM applications, and one application can also be supported by various PSTs. It is also found that energy modeling and management is the most referred purpose in FM to adopt PSTs, while space management, albeit important, received the least attention. Five challenges are identified, which include high investment on PSTs, data storage problem, absence of proper data exchange protocols for data interoperability, a lack of mature data processing methods for data utilization and privacy of users.

Originality/value

This paper paints a full picture of PSTs adoption for FM. It pinpoints the promising explorations for tackling the key challenges to future development.

Details

Facilities , vol. 38 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 23 July 2021

Tirth Patel, Brian H.W. Guo and Yang Zou

This article aims to explore valuable insights into the construction progress monitoring (CPM) research domain, which include main research topics, knowledge gaps and future…

1356

Abstract

Purpose

This article aims to explore valuable insights into the construction progress monitoring (CPM) research domain, which include main research topics, knowledge gaps and future research themes. For a long time, CPM has been significantly researched with increasing enthusiasm. Although a few review studies have been carried out, there is non-existence of a quantitative review study that can deliver a holistic picture of CPM.

Design/methodology/approach

The science mapping-based scientometric analysis was systematically processed with 1,835 CPM-related journal articles retrieved from Scopus. The co-authorship analysis and direct citation analysis were carried out to identify the most influential researchers, countries and publishers of the knowledge domain. The co-occurrence analysis of keyword was assessed to reveal the most dominating research topics and research trend with the visual representation of the considered research domain.

Findings

This study reveals seven clusters of main research topics from the keyword co-occurrence analysis. The evolution of research confirms that CPM-related research studies were mainly focused on fundamental and traditional CPM research topics before 2007. The period between 2007 and 2020 has seen a shift of research efforts towards digitalization and automation. The result suggests Building Information Modelling (BIM) as the most common, growing and influential research topic in the CPM research domain. It has been used in combination with different data acquisition technologies (e.g. photogrammetry, videogrammetry, laser scanning, Internet of Things (IoT) sensors) and data analytics approaches (e.g. machine learning and computer vision).

Practical implications

This study provides the horizon of potential research in the research domain of CPM to researchers, policymakers and practitioners by availing of main research themes, current knowledge gaps and future research directions.

Originality/value

This paper represents the first scientometric study depicting the state-of-the-art of the research by assessing the current knowledge domain of CPM.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 December 2020

Hamid Reza Ovesy, Ali Gharibi and Reza Khaki

This study aims to develop a new correlation method for prediction of in-flight wings deflections by integration of the experimental ground tests with computational fluid dynamics…

Abstract

Purpose

This study aims to develop a new correlation method for prediction of in-flight wings deflections by integration of the experimental ground tests with computational fluid dynamics (CFD) analysis.

Design/methodology/approach

The ground test results are implemented in the curve fitting process to determine deflections at 66 specific points (SPs) on the front and rear wing torque box. By using the obtained deflections and the corresponding applied loads, an experimental deflection equation (EDE) for each point is established through the Castigliano’s theorem. The CFD aerodynamic loads of typical aircraft, which have been obtained earlier by the authors, are once again used in the current research. The total applied loads to each part are achieved via summation of inertia and aerodynamic loads. The obtained loads are transformed to the equivalent concentrated loads at the SPs. By substituting the concentrated load values in the EDEs, the SPs deflections are achieved for mentioned flight conditions. The resulted deflections and the corresponding input flight parameters, i.e. M and α, are incorporated into a linear regression method for development of the appropriate in-flight deflection equations (IFDEs). The validity of IFDEs is approved by comparing IFDEs’ deflections with the corresponding ones calculated through EDEs for different flight conditions.

Findings

As an alternative approach to the fairly expensive flight tests, the IFDEs can be used to predict the in-flight wing deflections with comparable degree of accuracy.

Originality/value

Prediction of actual wing deflections distributions without flight tests execution at any given flight condition.

Details

Aircraft Engineering and Aerospace Technology, vol. 93 no. 1
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 2 May 2019

Hadi Mahami, Farnad Nasirzadeh, Ali Hosseininaveh Ahmadabadian, Farid Esmaeili and Saeid Nahavandi

This paper aims to propose an automatic imaging network design to improve the efficiency and accuracy of automated construction progress monitoring. The proposed method will…

Abstract

Purpose

This paper aims to propose an automatic imaging network design to improve the efficiency and accuracy of automated construction progress monitoring. The proposed method will address two shortcomings of the previous studies, including the large number of captured images required and the incompleteness and inaccuracy of generated as-built models.

Design/methodology/approach

Using the proposed method, the number of required images is minimized in two stages. In the first stage, the manual photogrammetric network design is used to decrease the number of camera stations considering proper constraints. Then the image acquisition is done and the captured images are used to generate 3D points cloud model. In the second stage, a new software for automatic imaging network design is developed and used to cluster and select the optimal images automatically, using the existing dense points cloud model generated before, and the final optimum camera stations are determined. Therefore, the automated progress monitoring can be done by imaging at the selected camera stations to produce periodic progress reports.

Findings

The achieved results show that using the proposed manual and automatic imaging network design methods, the number of required images is decreased by 65 and 75 per cent, respectively. Moreover, the accuracy and completeness of points cloud reconstruction is improved and the quantity of performed work is determined with the accuracy, which is close to 100 per cent.

Practical implications

It is believed that the proposed method may present a novel and robust tool for automated progress monitoring using unmanned aerial vehicles and based on photogrammetry and computer vision techniques. Using the proposed method, the number of required images is minimized, and the accuracy and completeness of points cloud reconstruction is improved.

Originality/value

To generate the points cloud reconstruction based on close-range photogrammetry principles, more than hundreds of images must be captured and processed, which is time-consuming and labor-intensive. There has been no previous study to reduce the large number of required captured images. Moreover, lack of images in some areas leads to an incomplete or inaccurate model. This research resolves the mentioned shortcomings.

Article
Publication date: 19 January 2024

Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…

68

Abstract

Purpose

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.

Design/methodology/approach

The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.

Findings

The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.

Research limitations/implications

The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.

Originality/value

These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 September 2002

M. Saadat and L. Cretin

This paper results from research carried out to survey the various large commercial aerospace engineering component measurement systems. The commercial aircraft manufacturing…

1289

Abstract

This paper results from research carried out to survey the various large commercial aerospace engineering component measurement systems. The commercial aircraft manufacturing industry is special due to the size of the components involved. Accuracy constraints remain very close, despite the size, and therefore accurate methods of measurement are necessary to control the quality of the final product. A survey of various current methods of measurement for such components is presented. These methods are based around three main principles: theodolites, photogrammetry, and laser technology. Each method has its own advantages and disadvantages in terms of accuracy, repeatability, range and cost. It is also often necessary to consider what each technique provides in terms of data storage and analysis. Most techniques use computer‐based systems to store results and perform various calculations. These systems also have their own requirements in terms of the environment in which they are used. It is important to consider whether a particular system can be installed in an area suitable to measure the required component, as well as ensuring that the stability requirements are met. In this paper the principles and characteristics of conventional optical tooling, electronic triangulation, electronic trilateration, photogrammetry, laser trackers, and laser scanners are reviewed.

Details

Sensor Review, vol. 22 no. 3
Type: Research Article
ISSN: 0260-2288

Keywords

Article
Publication date: 1 August 2000

Bryan Greenway

Discusses robot accuracy and repeatability and the mechanical and control aspects of robots that lead to errors occuring in static positioning and dynamic path following. Outlines…

2219

Abstract

Discusses robot accuracy and repeatability and the mechanical and control aspects of robots that lead to errors occuring in static positioning and dynamic path following. Outlines the steps that should be taken to minimise errors and concludes that robot users should encourage manufacturers to utilize the ISO and ANSI standards when measuring and presenting robot capabilities. This will not only give users the ability to objectively compare systems, but also push robot manufacturers to develop a better understanding of the products they are selling.

Details

Industrial Robot: An International Journal, vol. 27 no. 4
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 4 July 2023

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq, Fahim Ullah and Khaled Galal Ahmed

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams…

Abstract

Purpose

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams carry out this activity in the field and why teams continue to adopt the current method. The study aims to provide a comprehensive understanding of the current monitoring process and its effectiveness, identify any shortcomings and propose recommendations for improvements that can lead to better project outcomes.

Design/methodology/approach

The study conducted semi-structured interviews with 28 construction management practitioners to explore their views on contractual requirements, traditional progress monitoring practices and advanced monitoring methods. Thematic analysis was used to identify existing processes, practices and incentives for advanced monitoring.

Findings

Standard construction contracts mandate current progress monitoring practices, which often rely on manual, document-centric and labor-intensive methods, leading to slow and erroneous progress reporting and project delays. Key barriers to adopting advanced tools include rigid contractual clauses, lack of incentives and the absence of reliable automated tools. A holistic automated approach that covers the entire CPM process, from planning to claim management, is needed as a viable alternative to traditional practices.

Research limitations/implications

The study's findings can inform researchers, stakeholders and decision-makers about the existing monitoring practices and contribute to enhancing project management practices.

Originality/value

The study identified contractually mandated progress monitoring processes, traditional methods of collecting, transferring, analyzing and dispensing progress-related information and potential incentives and points of departure towards technologically advanced methods.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 17 November 2022

Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…

1033

Abstract

Purpose

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.

Design/methodology/approach

In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.

Findings

The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.

Originality/value

Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 October 2022

Ahmed Gouda Mohamed and Amr Mousa

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building…

Abstract

Purpose

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building components while monitoring and consistently recording numerous components’ functions throughout its lifecycle, especially in Egypt. This research paper aims to develop an integrated as-is BIM-facility management (FM) information model for the existing building’s components via a case study, depicting a repository for historical data and knowledge amassed from inspections and conveying maintenance decisions automatically during the FM practices.

Design/methodology/approach

The developed approach pursues four successive steps: data acquisition and processing of building components; components recognition from point clouds; modelling scanned point clouds; and quick response code information transfer to BIM components.

Findings

The proposed approach incorporates the as-is BIM with the building components’ as-is FM information to portray a repository for historical data and knowledge collected from inspections to proactively benefit facility managers in simplifying, expediting and enhancing maintenance decisions automatically during FM practices.

Originality/value

This paper presents a digital alternative to manual maintenance recordkeeping concerning building components to retrieve their as-is and historical data using a case study in Egypt. This paper proposes a broad scan to as-is information BIM approach for the existing building’s components to condone maintenance interventions using a versatile, affordable, readily available and multi-functional method for scanning the building’s components using a handheld tool.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

1 – 10 of 16