Search results

1 – 10 of 581
Article
Publication date: 9 June 2023

Binghai Zhou and Yufan Huang

The purpose of this paper is to cut down energy consumption and eliminate production waste on mixed-model assembly lines. Therefore, a supermarket integrated dynamic cyclic…

Abstract

Purpose

The purpose of this paper is to cut down energy consumption and eliminate production waste on mixed-model assembly lines. Therefore, a supermarket integrated dynamic cyclic kitting system with the application of electric vehicles (EVs) is introduced. The system resorts to just-in-time (JIT) and segmented sub-line assignment strategies, with the objectives of minimizing line-side inventory and energy consumption.

Design/methodology/approach

Hybrid opposition-based learning and variable neighborhood search (HOVMQPSO), a multi-objective meta-heuristics algorithm based on quantum particle swarm optimization is proposed, which hybridizes opposition-based learning methodology as well as a variable neighborhood search mechanism. Such algorithm extends the search space and is capable of obtaining more high-quality solutions.

Findings

Computational experiments demonstrated the outstanding performance of HOVQMPSO in solving the proposed part-feeding problem over the two benchmark algorithms non-dominated sorting genetic algorithm-II and quantum-behaved multi-objective particle swarm optimization. Additionally, using modified real-life assembly data, case studies are carried out, which imply HOVQMPSO of having good stability and great competitiveness in scheduling problems.

Research limitations/implications

The feeding problem is based on static settings in a stable manufacturing system with determined material requirements, without considering the occurrence of uncertain incidents. Current study contributes to assembly line feeding with EV assignment and could be modified to allow cooperation between EVs.

Originality/value

The dynamic cyclic kitting problem with sub-line assignment applying EVs and supermarkets is solved by an innovative HOVMQPSO, providing both novel part-feeding strategy and effective intelligent algorithm for industrial engineering.

Article
Publication date: 25 January 2022

Seyed Mohammad Hassan Hosseini

This paper aims to address a distributed assembly permutation flow-shop scheduling problem (DAPFSP) considering budget constraints and factory eligibility. The first stage of the…

Abstract

Purpose

This paper aims to address a distributed assembly permutation flow-shop scheduling problem (DAPFSP) considering budget constraints and factory eligibility. The first stage of the considered production system is composed of several non-identical factories with different technology levels and so the factories' performance is different in terms of processing time and cost. The second stage is an assembly stage wherein there are some parallel work stations to assemble the ready parts into the products. The objective function is to minimize the maximum completion time of products (makespan).

Design/methodology/approach

First, the problem is formulated as mixed-integer linear programing (MIP) model. In view of the nondeterministic polynomial (NP)-hard nature, three approximate algorithms are adopted based on variable neighborhood search (VNS) and the Johnsons' rule to solve the problem on the practical scales. The proposed algorithms are applied to solve some test instances in different sizes.

Findings

Comparison result to mathematical model validates the performance accuracy and efficiency of three proposed methods. In addition, the result demonstrated that the proposed two-level self-adaptive variable neighborhood search (TLSAVNS) algorithm outperforms the other two proposed methods. Moreover, the proposed model highlighted the effects of budget constraints and factory eligibility on the makespan. Supplementary analysis was presented by adjusting different amounts of the budget for controlling the makespan and total expected costs. The proposed solution approach can provide proper alternatives for managers to make a trade-off in different various situations.

Originality/value

The problem of distributed assembly permutation flow-shop scheduling is traditionally studied considering identical factories. However, processing factories as an important element in the supply chain use different technology levels in the real world. The current paper is the first study that investigates that problem under non-identical factories condition. In addition, the impact of different technology levels is investigated in terms of operational costs, quality levels and processing times.

Details

Kybernetes, vol. 52 no. 6
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 13 October 2023

Mengdi Zhang, Aoxiang Chen, Zhiheng Zhao and George Q. Huang

This research explores mitigating carbon emissions and integrating sustainability in e-commerce logistics by optimizing the multi-depot pollution routing problem with time windows…

Abstract

Purpose

This research explores mitigating carbon emissions and integrating sustainability in e-commerce logistics by optimizing the multi-depot pollution routing problem with time windows (MDPRPTW). A proposed model contrasts non-collaborative and collaborative decision-making for order assignment among logistics service providers (LSPs), incorporating low-carbon considerations.

Design/methodology/approach

The model is substantiated using improved adaptive large neighborhood search (IALNS), tabu search (TS) and oriented ant colony algorithm (OACA) within the context of e-commerce logistics. For model validation, a normal distribution is employed to generate random demand and inputs, derived from the location and requirements files of LSPs.

Findings

This research validates the efficacy of e-commerce logistics optimization and IALNS, TS and OACA algorithms, especially when demand follows a normal distribution. It establishes that cooperation among LSPs can substantially reduce carbon emissions and costs, emphasizing the importance of integrating sustainability in e-commerce logistics optimization.

Research limitations/implications

This paper proposes a meta-heuristic algorithm to solve the NP-hard problem. Methodologies such as reinforcement learning can be investigated in future work.

Practical implications

This research can help logistics managers understand the status of sustainable and cost-effective logistics operations and provide a basis for optimal decision-making.

Originality/value

This paper describes the complexity of the MDPRPTW model, which addresses both carbon emissions and cost reduction. Detailed information about the algorithm, methodology and computational studies is investigated. The research problem encompasses various practical aspects related to routing optimization in e-commerce logistics, aiming for sustainable development.

Details

Industrial Management & Data Systems, vol. 124 no. 1
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 17 February 2022

Kamran Zolfi and Javid Jouzdani

As far as the authors know, no research has already been carried out on the multi-floor dynamic facility layout problem (MF-DFLP) in the continuous form regarding the flexible bay…

Abstract

Purpose

As far as the authors know, no research has already been carried out on the multi-floor dynamic facility layout problem (MF-DFLP) in the continuous form regarding the flexible bay structure, the number and the variable location of the elevator. Therefore, the present paper models the given problem and attempts to find a sub-optimal solution for it using a meta-heuristic simulated annealing (SA) algorithm.

Design/methodology/approach

The efficient use of resources has always been a prominent matter for decision-makers. Many reasons including land use, construction considerations and proximity of departments have led to the design of multi-floor facilities. On the other hand, their fast-evolving environment calls for dynamic planning. Therefore, in this paper, a model and the SA algorithm for MF-DFLP are presented.

Findings

After presenting a mathematical model, the problem was solved precisely in a small size using the GAMS software. Also, a near-optimal solution method using a SA meta-heuristic algorithm is suggested and the proposed algorithm was run in the MATLAB software. To evaluate the presented model and the proposed solution, some test cases were considered in two aspects. The first aspect was the test cases that are newly generated in small, medium and large sizes to compare the exact optimal solution with the results of the meta-heuristic algorithm. Eight test cases with small sizes were solved using the GAMS software, the optimum solutions were obtained in a reasonable time, and the cost of their solutions was equal to that of the SA algorithm. Eight test cases with medium sizes were run in the GAMS software with the time limit of 80,000 s, and the SA algorithm had performed better for these test cases. Two test cases were also considered in large size that GAMS could not solve them, whereas the SA algorithm successfully found a proper solution for each. The second aspect included the test cases from the literature. The result showed that suggested algorithm is more capable of finding best solutions than compared algorithms.

Originality/value

In this paper, an unequal area MF-DFLP was studied in a continuous layout form in which the location and number of the elevators were considered to be variable, and the layouts were considered with flexible bay structure. These conditions were investigated for the first time.

Details

Journal of Facilities Management , vol. 21 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 15 January 2024

Caroline Cipolatto Ferrão, Jorge André Ribas Moraes, Leandro Pinto Fava, João Carlos Furtado, Enio Machado, Adriane Rodrigues and Miguel Afonso Sellitto

The purpose of this study is to formulate an algorithm designed to discern the optimal routes for efficient municipal solid waste (MSW) collection.

Abstract

Purpose

The purpose of this study is to formulate an algorithm designed to discern the optimal routes for efficient municipal solid waste (MSW) collection.

Design/methodology/approach

The research method is simulation. The proposed algorithm combines heuristics derived from the constructive genetic algorithm (CGA) and tabu search (TS). The algorithm is applied in a municipality located at Southern Brazil, with 40,000 inhabitants, circa.

Findings

The implementation achieved a remarkable 25.44% reduction in daily mileage of the vehicles, resulting in savings of 150.80 km/month and 1,809.60 km/year. Additionally, it reduced greenhouse gas emissions (including fossil CO2, CH4, N2O, total CO2e and biogenic CO2) by an average of 26.15%. Moreover, it saved 39 min of daily working time.

Research limitations/implications

Further research should thoroughly analyze the feasibility of decision-making regarding planning, scheduling and scaling municipal services using digital technology.

Practical implications

The municipality now has a tool to improve public management, mainly related with municipal solid waste. The municipality reduced the cost of public management of municipal solid waste, redirecting funds to other priorities, such as public health and education.

Originality/value

The study integrates MSW collection service with an online platform based on Google MapsTM. The advantages of employing geographical information systems are agility, low cost, adaptation to changes and accuracy.

Details

Management of Environmental Quality: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1477-7835

Keywords

Article
Publication date: 17 October 2023

Derya Deliktaş and Dogan Aydin

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the…

Abstract

Purpose

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the general problem and has still attracted the attention of researchers. The type-I simple assembly line balancing problems (SALBP-I) aim to minimise the number of workstations on an assembly line by keeping the cycle time constant.

Design/methodology/approach

This paper focuses on solving multi-objective SALBP-I problems by utilising an artificial bee colony based-hyper heuristic (ABC-HH) algorithm. The algorithm optimises the efficiency and idleness percentage of the assembly line and concurrently minimises the number of workstations. The proposed ABC-HH algorithm is improved by adding new modifications to each phase of the artificial bee colony framework. Parameter control and calibration are also achieved using the irace method. The proposed model has undergone testing on benchmark problems, and the results obtained have been compared with state-of-the-art algorithms.

Findings

The experimental results of the computational study on the benchmark dataset unequivocally establish the superior performance of the ABC-HH algorithm across 61 problem instances, outperforming the state-of-the-art approach.

Originality/value

This research proposes the ABC-HH algorithm with local search to solve the SALBP-I problems more efficiently.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 5 April 2024

Ting Zhou, Yingjie Wei, Jian Niu and Yuxin Jie

Metaheuristic algorithms based on biology, evolutionary theory and physical principles, have been widely developed for complex global optimization. This paper aims to present a…

Abstract

Purpose

Metaheuristic algorithms based on biology, evolutionary theory and physical principles, have been widely developed for complex global optimization. This paper aims to present a new hybrid optimization algorithm that combines the characteristics of biogeography-based optimization (BBO), invasive weed optimization (IWO) and genetic algorithms (GAs).

Design/methodology/approach

The significant difference between the new algorithm and original optimizers is a periodic selection scheme for offspring. The selection criterion is a function of cyclic discharge and the fitness of populations. It differs from traditional optimization methods where the elite always gains advantages. With this method, fitter populations may still be rejected, while poorer ones might be likely retained. The selection scheme is applied to help escape from local optima and maintain solution diversity.

Findings

The efficiency of the proposed method is tested on 13 high-dimensional, nonlinear benchmark functions and a homogenous slope stability problem. The results of the benchmark function show that the new method performs well in terms of accuracy and solution diversity. The algorithm converges with a magnitude of 10-4, compared to 102 in BBO and 10-2 in IWO. In the slope stability problem, the safety factor acquired by the analogy of slope erosion (ASE) is closer to the recommended value.

Originality/value

This paper introduces a periodic selection strategy and constructs a hybrid optimizer, which enhances the global exploration capacity of metaheuristic algorithms.

Details

Engineering Computations, vol. 41 no. 2
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 29 May 2023

Peipei Wang, Kun Wang, Yunhan Huang and Peter Fenn

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly…

Abstract

Purpose

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.

Design/methodology/approach

A preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naïve Bayes classifier (NBC) and Bayesian belief networks (BBNs).

Findings

The model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.

Originality/value

The identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2022

Elham Samadpour, Rouzbeh Ghousi and Ahmad Makui

In this study, the authors investigate a different routing and scheduling problem in the field of home health care (HHC) management system. The purpose of this paper is to route…

Abstract

Purpose

In this study, the authors investigate a different routing and scheduling problem in the field of home health care (HHC) management system. The purpose of this paper is to route and schedule the workday of health workers, assign the patients to suitable health workers, make accurate decisions to minimize costs, provide timely services and, in general, enhance the efficiency of HHC centers.

Design/methodology/approach

A mixed-integer linear programming model is developed to assign health workers to patients. The model considers health professionals with different skills, namely nurses and physicians. Additionally, three groups of patients are considered: patients who need a nurse, patients who need a physician and patients who need both. In the third group, the nurse must be present at the patient’s home following the physician’s visit in order to perform the required tasks.

Findings

The results of this study show a reduction in costs which results from the fewer health workers employed and dispatched in comparison with traditional approaches. With the help of our solution approach and model, HHC centers may not only successfully reduce their costs but also manage to meet their patients’ demands by assigning suitable nurses and physicians.

Originality/value

Previous studies have often focused on problems involving only one group of health professionals and rarely address problems involving multiple groups. The authors consider this a shortcoming, because in many cases, patients should be visited several times and by various health professionals.

Details

Kybernetes, vol. 52 no. 9
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 11 May 2023

Farbod Zahedi, Hamidreza Kia and Mohammad Khalilzadeh

The vehicle routing problem (VRP) has been widely investigated during last decades to reduce logistics costs and improve service level. In addition, many researchers have realized…

Abstract

Purpose

The vehicle routing problem (VRP) has been widely investigated during last decades to reduce logistics costs and improve service level. In addition, many researchers have realized the importance of green logistic system design in decreasing environmental pollution and achieving sustainable development.

Design/methodology/approach

In this paper, a bi-objective mathematical model is developed for the capacitated electric VRP with time windows and partial recharge. The first objective deals with minimizing the route to reduce the costs related to vehicles, while the second objective minimizes the delay of arrival vehicles to depots based on the soft time window. A hybrid metaheuristic algorithm including non-dominated sorting genetic algorithm (NSGA-II) and teaching-learning-based optimization (TLBO), called NSGA-II-TLBO, is proposed for solving this problem. The Taguchi method is used to adjust the parameters of algorithms. Several numerical instances in different sizes are solved and the performance of the proposed algorithm is compared to NSGA-II and multi-objective simulated annealing (MOSA) as two well-known algorithms based on the five indexes including time, mean ideal distance (MID), diversity, spacing and the Rate of Achievement to two objectives Simultaneously (RAS).

Findings

The results demonstrate that the hybrid algorithm outperforms terms of spacing and RAS indexes with p-value <0.04. However, MOSA and NSGA-II algorithms have better performance in terms of central processing unit (CPU) time index. In addition, there is no meaningful difference between the algorithms in terms of MID and diversity indexes. Finally, the impacts of changing the parameters of the model on the results are investigated by performing sensitivity analysis.

Originality/value

In this research, an environment-friendly transportation system is addressed by presenting a bi-objective mathematical model for the routing problem of an electric capacitated vehicle considering the time windows with the possibility of recharging.

1 – 10 of 581