Search results

1 – 10 of 13
Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 June 2023

Nirodha Fernando, Kasun Dilshan T.A. and Hexin (Johnson) Zhang

The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial…

Abstract

Purpose

The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial forecasted budget to have transparency in transactions. Early cost estimating is challenging for Quantity Surveyors due to incomplete project details at the initial stage and the unavailability of standard cost estimating techniques for bridge projects. To mitigate the difficulties in the traditional preliminary cost estimating methods, there is a requirement to develop a new initial cost estimating model which is accurate, user friendly and straightforward. The research was carried out in Sri Lanka, and this paper aims to develop the artificial neural network (ANN) model for an early cost estimate of concrete bridge systems.

Design/methodology/approach

The construction cost data of 30 concrete bridge projects which are in Sri Lanka constructed within the past ten years were trained and tested to develop an ANN cost model. Backpropagation technique was used to identify the number of hidden layers, iteration and momentum for optimum neural network architectures.

Findings

An ANN cost model was developed, furnishing the best result since it succeeded with around 90% validation accuracy. It created a cost estimation model for the public sector as an accurate, heuristic, flexible and efficient technique.

Originality/value

The research contributes to the current body of knowledge by providing the most accurate early-stage cost estimate for the concrete bridge systems in Sri Lanka. In addition, the research findings would be helpful for stakeholders and policymakers to propose policy recommendations that positively influence the prediction of the most accurate cost estimate for concrete bridge construction projects in Sri Lanka and other developing countries.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 27 January 2022

Guus Keusters, Hans Bakker and Erik-Jan Houwing

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to…

Abstract

Purpose

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to perform better. Although the integrated design process is critical for project success, the literature lacks studies describing the link to project performance. Therefore, this study aims to investigate the dominant variables that affect the integrated design process and consequently project performance.

Design/methodology/approach

A multiple case study was conducted to determine the dominant variables that affect the integrated design process and project performance. The research included four projects. Semi-structured interviews were the main source of data.

Findings

The cases indicated that the extent to which an integrated approach is achieved in the design process is essential for project performance. This applies to the integration of stakeholders’ interests as well as the integration of disciplines. Above all, it was concluded that the project team participants’ competencies for integration are a dominant factor for project performance, as the integrated design process has changed from a technical challenge to an integrative one.

Originality/value

This study provides insights into the dominant variable of the integrated design process that affects project performance, which is underexposed in the literature. The study results reveal the importance of competencies related to integration and adoption of the design problem context, which are not yet included in civil engineering design methods. In this respect, empathy is introduced as a new and critical competence for the civil engineering industry, which needs further research.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 April 2024

Katariina Juusola, Krishna Venkitachalam, Daniel Kleber and Archana Popat

This study aims to explore the use of knowledge sharing (KS) in delivering open social innovation (OSI) solutions for sustainable development in the context of economically…

Abstract

Purpose

This study aims to explore the use of knowledge sharing (KS) in delivering open social innovation (OSI) solutions for sustainable development in the context of economically marginalized, rural societies in India.

Design/methodology/approach

The study is guided by an exploratory, qualitative approach using an embedded case study design with four social enterprises. The study approaches the use of KS in three stages of OSI: (1) the stages of ideating and prototyping, (2) the initial stages of experimenting and business development and (3) the more current and future-oriented stages of organizations’ strategies for expanding market opportunities for maximizing impact.

Findings

The first stage used KS for collaborative efforts among diverse stakeholders to recognize the needs of marginalized people and ideate suitable ecological solutions. The social enterprises acted as orchestrators in this stage. The second stage involved a more dynamic role of KS in the refinement of social enterprises’ market offerings, generating additional innovations and value propositions, which diversified the scope of the social enterprises. This was facilitated by enterprises’ ability to be open systems, which change and evolve through OSI processes and KS. In the third stage, social enterprises’ use of KS was shifted towards future business development by expanding market opportunities with solutions that tackle complex societal and ecological problems, thereby contributing to sustainable development goals.

Originality/value

The present study contributes to studies on OSI, focusing on sustainable development and the role played by social enterprises operating in rural, economically marginalized areas, which have been an understudied phenomenon in the open innovation literature.

Details

Journal of Strategy and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1755-425X

Keywords

Article
Publication date: 12 April 2024

Sandra Carrasco and Irene Perez Lopez

This study explores the opportunities for a gender-inclusive architecture, engineering and construction (AEC) industry, focussing on the gap between architectural education and…

Abstract

Purpose

This study explores the opportunities for a gender-inclusive architecture, engineering and construction (AEC) industry, focussing on the gap between architectural education and practice. This study focusses on three research questions: (1) What factors influence women architects' career retention and advancement in the AEC industry? How can practice outcomes be linked with educational approaches for gender inclusion in the AEC industry? (3) What critical factors can enable structural changes in architecture education, including AEC-related subjects and practice/career pathways towards gender equity?

Design/methodology/approach

This paper is based on a systematic literature review (SLR). The established timeframe for selecting papers in this study considered the last 20 years, as various seminal studies in feminism and gender inclusion in architecture emerged in the early 2000s through the definition of keywords used in two prestigious databases. The academic articles selected were filtered through a process of inclusion and exclusion, following criteria for suitability and relevance using a Preferred Reporting Items for Systematic Reviews (PRISMA) diagram.

Findings

This study revealed key trends in the literature review consistent with the research questions, including (1) the disproportionate struggles women face at individual, interpersonal and organisational levels and the gender-based bias from entry and progression in the AEC industry that also requires multi-level interventions; (2) traditional architecture education affects female students and educators who find networking, social capital and leadership opportunities to challenge gender-based stereotypes and promote workplace equity, and finally, (3) observe enablers for fostering equity in architecture and education, which should not be limited to policy-driven interventions but structural transformations through transparency, mentorship, leadership, awareness raising and empowerment of women and men, promoting inclusivity and gender equity in the AEC industry.

Research limitations/implications

This study considers a global understanding of gender equity in the AEC industry, regional and country-specific analysis needs to be considered in future studies. The study's focus is on women’s inclusion, acknowledging the limitations of conventional binary gender concepts; future studies need to include the experiences of LGBTI + communities and other underrepresented groups. The literature review considers only academic articles; future research should also consider industry reports, government initiatives and organisational documents for a broader understanding of diversity efforts in business.

Originality/value

This paper observes the issues for gender-inclusive architecture within the context of a male-dominant AEC industry through linking architectural education and practice. Studies rarely focus on this link and address workplace issues. This study highlights this link and extends the discussion through the critical literature review, providing a new ground for geographic-specific or intersectional studies.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 29 March 2024

Ibrahim Yahaya Wuni

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of…

Abstract

Purpose

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of complexity, challenges and risks that if unaddressed, can derail the gains in sustainable construction projects. This study developed a multidimensional risk assessment model for sustainable construction projects in the United Arab Emirates (UAE).

Design/methodology/approach

The research activities a comprised comprehensive literature review to shortlist relevant risks, an analysis of the probability – impact rating of the shortlisted risks – and the development of a risk assessment model for SC projects in the UAE. The model is developed based on the multicriteria framework and mathematical formulation of the fuzzy synthetic evaluation approach.

Findings

The developed model quantified the overall risk level in sustainable construction projects to be 3.71 on a 5-point Likert scale, indicating that investment in SC projects in the UAE is risky and should be carefully managed. The developed model further revealed that each of the risk groups, comprising management (3.82), technical (3.78), stakeholder (3.68), regulatory (3.66), material (3.53) and economic risks (3.502), presents a significant threat to realizing outcomes typical of SC projects.

Originality/value

This study developed a multidimensional risk assessment model capable of objectively quantifying the overall risk level and provides decision support to project teams to improve risk management in sustainable construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16133

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

1 – 10 of 13