Article
Publication date: 3 February 2022

Ting Wang, Junyan Xu, Qinghua He, Albert P.C. Chan and Emmanuel Kingsford Owusu

This study intends to review studies on the success criteria and critical success factors (CSFs) for mega infrastructure construction projects (MICPs) from journal articles…

2831

Abstract

Purpose

This study intends to review studies on the success criteria and critical success factors (CSFs) for mega infrastructure construction projects (MICPs) from journal articles between 2000 and 2018 to (1) identify the publication trend of success criteria and CSFs for MICPs; (2) explore distributions of selected papers, including the distribution of journals, authors’ origin/country and publications by country or region focus; and (3) summarize the findings of success criteria and CSFs studies of MICPs.

Design/methodology/approach

A methodical and systematic analysis of 38 selected journal articles was conducted using descriptive analysis to obtain the annual trend of publications, distributions of publication sources, contributors’ origin/country, regions/countries of research focus, methods involved in publications and thematic analysis to identify and categorize success criteria and CSFs for MICPs.

Findings

Australia, the USA, UK, China and Hong Kong had been the leading contributors for publications on success criteria and CSFs for MICPs; meanwhile, China, Australia and the UK have been the countries of focus for most studies on this specific topic. This review identified 20 success criteria grouped into 5 constructs and 36 CSFs grouped into 5 categories and, respectively, integrated them into two conceptual frameworks. The top five CSFs were adequate resource availability, partnering/relationships with key stakeholders, adequate communication and coordination among related parties, public support or acceptance and clear strategic vision. Three implications, namely, evaluation indicators, relationships between CSFs and the success of MICPs and human-related factors, are highlighted in future research.

Originality/value

The identified success criteria and CSFs provide a basis for evaluating the success possibility of MICPs and serve to identify areas for further improvement. Additionally, the CSFs checklist and framework have been established, which could help to conduct further empirical studies. Finally, the holistic analysis identifies gaps in the body of knowledge, revealing avenues for future research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 May 2023

Muge Unal Cilek, Mehmet Faruk Altunkasa and Cengiz Uslu

Public spaces, which offer opportunities for social, cultural and recreational activities, enhance urban life quality (ULQ). Thus, this study aims to investigate the impact of…

Abstract

Purpose

Public spaces, which offer opportunities for social, cultural and recreational activities, enhance urban life quality (ULQ). Thus, this study aims to investigate the impact of public spaces and physical-environmental criteria affecting the usability of ULQ in Adana city, Turkey.

Design/methodology/approach

The study method consists of three stages. Firstly, public spaces and physical-environmental criteria that can be effective in ULQ were determined. Secondly, the effect of the determining criteria on ULQ was evaluated through a 5-point Likert scale questionnaire (1 = very negative, 5 = very positive). The survey was conducted with 601 people in the four central districts of Adana, including Çukurova, Seyhan, Sariçam and Yüregir. Participants evaluated ULQ for both the residence district and Adana city. Lastly, factors affecting ULQ were determined using exploratory factor analysis (EFA). In addition, MANOVA was used to determine the changes in factors according to socio-demographic characteristics.

Findings

Based on the EFA, the results show that the criteria affecting the ULQ are grouped into four factors, including (1) open spaces, (2) cultural, sports and recreation, (3) environmental and (4) transportation. In evaluating these factors, while gender does not affect the perception of ULQ, residence districts show a statistically significant difference in the perception of ULQ. Cultural and transportation factors show statistical differences according to education and age.

Research limitations/implications

This study has a limitation in that it relies solely on the quantitative perceptions of residents with varying demographics, such as age, gender and educational level, to evaluate public spaces and physical environment criteria. While these perspectives are valuable, they may not necessarily reflect the qualitative reality of the urban environment. Therefore, future studies combining quantitative and qualitative data could provide a more comprehensive understanding of the factors affecting ULQ in urban areas.

Social implications

The implementation of the survey showed the subjective perception of ULQ in Adana city. Urban green spaces, including cultural, sports and recreational areas, should be improved in areas with insufficient facilities that affect the quality of urban life. Additionally, the impact of climate conditions on the quality of life should be taken into account when designing the city to ensure maximum utilization of public spaces. Furthermore, safe cycling transportation networks should be developed.

Originality/value

The novelty of this study lies in its unique approach to investigating the effects of public spaces and physical environmental criteria on ULQ based on combining residents' perceptions, literature review and data analysis. The study provides a valuable perspective often overlooked in urban planning research, especially in developing countries like Turkey. Additionally, the study's findings can inform the development of strategies to enhance ULQ.

Details

Open House International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0168-2601

Keywords

Content available
Book part
Publication date: 24 July 2023

Abstract

Details

Visual and Multimodal Urban Sociology, Part B
Type: Book
ISBN: 978-1-80455-633-7

Content available
Book part
Publication date: 24 July 2023

Abstract

Details

Visual and Multimodal Urban Sociology, Part A
Type: Book
ISBN: 978-1-83909-968-7

Article
Publication date: 11 July 2023

Xiaoyan Chen, Yajiao Chen, Xinyue Zhang and Qinghua He

Green innovation (GI) in megaprojects has become a significant research topic that attracts both megaproject management scholars' and practitioners' attention. Green…

Abstract

Purpose

Green innovation (GI) in megaprojects has become a significant research topic that attracts both megaproject management scholars' and practitioners' attention. Green transformational leadership (GTL) is acknowledged as an important antecedent to GI in the permanent context. However, limited research investigates the mechanism and condition of how GTL effectively affects GI in the temporary (i.e. megaproject) context. This study seeks to examine the mechanism and condition of GTL in improving GI by assessing the mediating role of green knowledge sharing (GKS) and the moderating effect of innovation climate (IC).

Design/methodology/approach

Regression analysis was performed on data obtained from 303 experts who have been involved in megaprojects.

Findings

GTL has a significant positive impact on two aspects of GI, including green product innovation (GPDI) and green process innovation (GPCI). Besides, GKS mediates the relationship between GTL and the two aspects of GI. Moreover, IC plays a significantly positive moderating role in the relationship between GTL and GKS and the relationship between GKS and the two aspects of GI.

Originality/value

This study adds knowledge to the theory and practice by unveiling the “black box” between GTL and GI in the temporary (i.e. megaproject) context. First, this study extends the continuing discussion on the direct effect of GTL on GI to the temporary (i.e. megaproject) context. Second, this study facilitates the understanding of the mechanism to generate better GI performance considering the mediating role of GKS and the moderating effect of IC in the temporary (i.e. megaproject) context. The results can illuminate megaproject practitioners on generating better GI performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 1 February 2022

Jin Xue, Geoffrey Qiping Shen, Xiaomei Deng, Adedayo Johnson Ogungbile and Xiaoling Chu

Relationship management evolves with dynamic and complex environments of megaprojects. However, studies on the longitudinal measurement of relationship management performance for…

Abstract

Purpose

Relationship management evolves with dynamic and complex environments of megaprojects. However, studies on the longitudinal measurement of relationship management performance for each stakeholder in dynamic and complex project environments are lacking. The purpose of this research is to propose an NK-network evolution model to evaluate stakeholder performance on relationship management in the development of megaprojects.

Design/methodology/approach

The model input includes the stakeholder-associated issues and stakeholders' relational strategies, the co-effects of which determine the internal effects of relationship management in megaprojects. The model processing simulates the stakeholder performance of relationship management under the dynamic and complex nature of megaprojects. The NK model shows the dynamic stakeholder interactions on relationship management, whereas the network model presents the complex stakeholder structures of the relationships between stakeholders and relevant issues. The model output is the evolution graph to reveal the weak stakeholder performance on relationship management in the timeline of the project duration.

Findings

The research finding reveals that all stakeholders experience the plunge of stakeholder performance of relationship management at the decision-making moment of the planning stage. Construction, environmental and pressure groups may experience the hardship of relationship management at the start of the construction stage. The government is likely to suffer difficulties in relationship management in the late construction stage. Local industry groups would face challenges in relationship management in the middle of the construction stage and handover stage.

Originality/value

The research provides a useful approach to measuring weak moments of relationship management for each stakeholder in various project phases, considering the dynamic and complex environments of megaprojects. The proposed model extends the current knowledge body on how to make project stakeholder analysis by modelling dynamic and complex environments of megaprojects, with bridging the knowledge domains of evolution modeling techniques and network methods.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 August 2023

Sepani Senaratne, Abhishek KC and Siryana Rai

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from…

Abstract

Purpose

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.

Design/methodology/approach

This research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.

Findings

Every case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.

Originality/value

This research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 June 2022

Linlin Xie, Tianhao Ju, Ting Han and Lei Hou

As megaprojects bear extensive and profound social responsibilities throughout the project life cycle, formulating effective measures for improving construction enterprise social…

Abstract

Purpose

As megaprojects bear extensive and profound social responsibilities throughout the project life cycle, formulating effective measures for improving construction enterprise social responsibility is key to project success. Given the current research is relatively lack of these measures, this study aims to formulate a meta-network framework to improve the megaproject social responsibility behaviour (MSRB) for construction enterprises.

Design/methodology/approach

First, this study implements literature review, expert interview and field investigation to identify the construction enterprise MSRB and its influencing factors. Second, this study evaluates the MSRB implementation level of the selected construction enterprises and proposes the above mentioned meta-network framework. Next, this meta-network is configured to reflect the impact of MSRB strategic adjustment. Last but not least, a real-world case study is carried out to validate this framework.

Findings

The best MSRB performance is always witnessed from the contractor group, followed by the project client group and the site supervisor group. The outcomes of implementing certain managerial strategies indicate that (1) social responsibility cognition is a critical factor for all the groups; (2) communication mechanism and normative pressure are the critical factors for clients; (3) coercive pressure is a critical factor for supervisors and (4) cultural cognitive pressure is a critical factor for clients and contractors.

Originality/value

The use of the framework in proactive assessment and management of MSRB can lead to effective strategies for construction enterprises to increase the efficiency and quality of projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988