Article
Publication date: 28 June 2022

Dedong Wang, Xiaoru Zhao and Kangning Zhang

The increasingly uncertain and unstable factors in the internal and external environments of megaprojects lead to more potential crises and challenges, hence increasing the…

1444

Abstract

Purpose

The increasingly uncertain and unstable factors in the internal and external environments of megaprojects lead to more potential crises and challenges, hence increasing the importance of improving organizational resilience. This study aimed to explore the effects of transformational leadership and employee self-efficacy on organizational resilience from a leader–employee perspective.

Design/methodology/approach

By combining the perspectives of leaders and employees, this study constructed a development mechanism of the organizational resilience of megaprojects. Organizational climate and organizational learning were selected as two organizational resources to study the mediating roles of leaders and employees. A partial least-squares structural equation model was used to test the hypotheses based on data collected from 243 respondents.

Findings

Results show that transformational leadership and employee self-efficacy positively affect organizational resilience and organizational resources. Organizational learning positively mediates the effects of leader–employee factors on organizational resilience, whereas organizational climate does not.

Originality/value

This study verifies the positive role of transformational leadership and employee self-efficacy in organizational resilience and reveals the development mechanism of using organizational resources to build organizational resilience. This paper enlightens project managers and employees on how to well respond to the uncertainty and complexity of megaprojects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 February 2023

Giacomo Pigatto, Lino Cinquini, Andrea Tenucci and John Dumay

This study aims to explore the serendipitous discovery of integrated reporting (IR) by Alpha, an Italian small and medium-sized enterprise (SME). Alpha piqued the curiosity when…

1567

Abstract

Purpose

This study aims to explore the serendipitous discovery of integrated reporting (IR) by Alpha, an Italian small and medium-sized enterprise (SME). Alpha piqued the curiosity when the authors discovered that it experimented with IR alongside other management accounting practices, such as the Balanced Scorecard. As the authors reflected on Alpha’s experiences, the authors had to opportunistically develop a new framework to understand the change that was taking place at Alpha fully. Thus, the authors developed the serendipitous drift framework. This study contributes to addressing the gap between management accounting research that sees change as a planned, ordered process versus research that sees it as an unmanageable drift.

Design/methodology/approach

The authors ground the research on a qualitative methodology based on a single case study. This methodology allows us to focus on understanding what has happened at Alpha to discover new themes and provide theoretical generalisations. The authors developed the framework using middle-range thinking and fleshed it out using empirical findings from the case study. Middle-range thinking implies going back and forth between the theory and the empirical material. Therefore, the authors develop the serendipitous drift framework from prior theories and use it to inform the empirical study. In turn, the empirical material collected in Alpha helps refine and flesh out the serendipitous drift framework. The framework explains how Alpha leveraged serendipity to steer change towards favourable outcomes for them.

Findings

The authors find that the search for change undertaken by Alpha’s managers was non-specific but purposeful. Their dispositions were sagacious enough to recognise the potential value found in management accounting practices, such as IR and the Balanced Scorecard. They chanced upon new and unforeseen practices through trial and error, iteration, internal engagement and networking.

Research limitations/implications

Overall, the results indicate that Alpha’s managers shaped the disorder of management accounting changes, even though it followed unexpected, uncertain and messy paths. Indeed, appropriate informal controls can act as a frame of reference for choosing, adapting and implementing new management accounting practices to shape the disorder. Informal controls can both guide and bound the experimentation process towards desirable outcomes.

Originality/value

The authors contribute to management accounting change theory by developing a framework rooted in serendipity and drifting theories. The framework identifies how searching, sagacity and chance are essential for making positive, unexpected discoveries. Therefore, the authors provide novel insights on how and why IR and other management accounting practices are eventually translated and adopted in the case company. Moreover, the serendipitous drift framework has the potential to help managers frame cultural controls to actively seek opportunities for valuable serendipitous eureka moments through networking and experimentation.

Details

Meditari Accountancy Research, vol. 31 no. 7
Type: Research Article
ISSN: 2049-372X

Keywords

Article
Publication date: 26 January 2023

Loai Ali Zeenalabden Ali Alsaid and Charles Anyeng Ambilichu

This study aims to explore the potential dynamics between performance measurement at the organisational level and emerging urban development projects at the macro-institutional…

Abstract

Purpose

This study aims to explore the potential dynamics between performance measurement at the organisational level and emerging urban development projects at the macro-institutional field level of sustainability governance and accountability.

Design/methodology/approach

Using a theoretical triangulation between three theories, namely contingency theory, institutional theory and social cognitive theory, this study investigates not only the macro-micro dynamics, but also the (recursive) micro-macro dynamics between performance measurement and urban development. Using an Egyptian public sector urban development organisation and its sustainable energy project as an empirical example, interviews, documents and observations were collected.

Findings

The dynamics emerged between field urban development projects and the (unintended) organisational implementation of the performance measurement system, the sustainability key performance indicators (KPIs) reporting system. Contributing to previous literature, these dynamics have been institutionalised through (three) interrelated levels: the (macro-field) urban development contingencies and pressures for sustainability KPIs reporting, the (organisational) institutionalisation of the urban development performance measurement system and then the (micro-organisational) cognitive role of sustainability KPIs reports in (re)making political urban development decisions.

Research limitations/implications

This study faced some limitations that paved the way for future research axes. For political and security reasons, difficulties were encountered in conducting interviews with government actors in the sustainable energy project under study. Also, due to the practical separation of the environmental sustainability system from the sustainability KPIs reporting system in this case study, environmental sustainability is outside the scope.

Practical implications

Sustainability reports may influence public sector decision-making processes in a specific urban development context. These KPIs reports may also increase public sector management opportunities for urban auditing, transparency, accountability and sustainability governance. These KPIs may also guide public sector management to lower prices in poor villages to increase smart energy consumption and improve community health.

Social implications

Sustainability reports may increase decision-makers' understanding of consumer behaviours and societal changes. This may help in making appropriate political decisions to improve their welfare and regular smart energy consumption. Not only urban citizens, but this social advantage may also extend to urban development employees through employees' promotion, training and access to government-funded academic and professional scholarships.

Originality/value

This study is an attempt to develop current public sector performance measurement analyses in the emerging urban development field using a triadic analytical approach. This study also fed the literature with an extended case study that clarified the (multi-level) and (two-way) dynamics between performance measurement and urban development.

Details

Journal of Accounting in Emerging Economies, vol. 14 no. 1
Type: Research Article
ISSN: 2042-1168

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2039

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 8 September 2023

Juliano Idogawa, Flávio Santino Bizarrias and Ricardo Câmara

The purpose of this study is to determine the influence of project critical success factors (CSFs) on change management in the context of business process management (BPM)…

1560

Abstract

Purpose

The purpose of this study is to determine the influence of project critical success factors (CSFs) on change management in the context of business process management (BPM). Despite widespread interest in BPM, the existing literature is insufficient in addressing the antecedents that contribute to change management in business process projects.

Design/methodology/approach

Key factors of change management success in BPM projects were initially identified in a systematic literature review (SLR) and were used as antecedents of change management through a structural equation modeling (SEM) with 464 business project stakeholders. Next, a neural network analysis allowed the key factors to be ranked non-linearly. Finally, a latent class analysis (LCA) was performed to determine the sample's heterogeneous groups based on their project management characteristics.

Findings

Project management, top management support and technological competencies were the main CSFs identified as having positive effects on change management. The most important factor is project management, followed by top management support, which plays a crucial mediating role in enabling change management. Although relevant, technological competencies were secondary in the study. Regarding project management CSF, four heterogeneous classes of individuals were determined.

Research limitations/implications

Although this study provides an opportunity to observe CSFs, it does not address the need to analyze the phenomenon in different classifications of projects, regarding maturity, complexity, project management approach and other aspects that differentiate projects in a meaningful way.

Practical implications

The study allows practitioners to understand the critical factors underlying change management and take necessary actions to manage it, recognizing that individuals have heterogeneous profiles regarding project management.

Originality/value

This study pioneeringly discusses the CSFs of change management BPM projects to enable successful change management, ranking the main factors and mapping heterogeneous profiles.

Details

Business Process Management Journal, vol. 29 no. 7
Type: Research Article
ISSN: 1463-7154

Keywords

Book part
Publication date: 10 April 2024

Ifzal Ahmad and M. Rezaul Islam

This chapter explores the vital connection between ethics and community development, underlining the fundamental role of ethical considerations in shaping fair, just, and…

Abstract

This chapter explores the vital connection between ethics and community development, underlining the fundamental role of ethical considerations in shaping fair, just, and sustainable communities. It begins by emphasizing that community development is inherently ethical and delves into the concept of ethics, examining ethical theories like consequentialism, deontology, and virtue ethics in the context of community development. Real-world case studies from diverse countries, such as South Africa, Australia, and India, are interwoven throughout the chapter to provide practical insights. These case studies illustrate the complexities of ethical implementation in community development, from navigating power dynamics to addressing conflicts of interest and balancing immediate needs with long-term sustainability. The chapter also explores macro-level considerations, highlighting the need for systemic change to create a more just and equitable society. It guides practitioners on integrating ethics into their work, establishing a strong moral framework for community development. Continuous learning, reflective practice, and adaptability are underscored as essential in responding to evolving societal contexts, norms, and challenges.

Details

Building Strong Communities: Ethical Approaches to Inclusive Development
Type: Book
ISBN: 978-1-83549-175-1

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 16 November 2023

Violina P. Rindova and Antoaneta P. Petkova

Strategy scholars have theorized that a firm's strategic leaders play an important role in firm dynamic capabilities (DCs). However, little research to date has studied how…

Abstract

Strategy scholars have theorized that a firm's strategic leaders play an important role in firm dynamic capabilities (DCs). However, little research to date has studied how leaders shape the development of DCs. This inductive theory-building study sheds new light on the multilevel architecture of DCs by uncovering that the three core DCs – sensing, seizing, and reconfiguring – operate through distinct individual, group, and organizational processes. Further, the role of strategic leadership is critical as organizational processes create DCs only when they are purposefully designed by firms' strategic leaders to enable change and opportunity pursuit. Whether strategic leaders design processes for change and opportunity pursuit, in turn, reflects the extent to which they view change as positive and desirable. Our insights about the role of strategic leaders' positive attitude toward change as an important aspect of firm DCs uncover new interconnections between strategic leadership, organizational design, and the micro-foundations of DCs. Collectively our findings about the role of positive attitude toward change, the purposeful design of processes for change, and the varying manifestations of these processes at different levels of analysis reveal the coupling of strategic and organizational processes in enabling strategic dynamism and change.

Open Access
Article
Publication date: 12 December 2023

Christine T. Domegan, Tina Flaherty, John McNamara, David Murphy, Jonathan Derham, Mark McCorry, Suzanne Nally, Maurice Eakin, Dmitry Brychkov, Rebecca Doyle, Arthur Devine, Eva Greene, Joseph McKenna, Finola OMahony and Tadgh O'Mahony

To combat climate change, protect biodiversity, maintain water quality, facilitate a just transition for workers and engage citizens and communities, a diversity of stakeholders…

Abstract

Purpose

To combat climate change, protect biodiversity, maintain water quality, facilitate a just transition for workers and engage citizens and communities, a diversity of stakeholders across multiple levels work together and collaborate to co-create mutually beneficial solutions. This paper aims to illustrate how a 7.5-year collaboration between local communities, researchers, academics, companies, state agencies and policymakers is contributing to the reframing of industrial harvested peatlands to regenerative ecosystems and carbon sinks with impacts on ecological, economic, social and cultural systems.

Design/methodology/approach

The European Union LIFE Integrated Project, Peatlands and People, responding to Ireland’s Climate Action Plan, represents Europe’s largest rehabilitation of industrially harvested peatlands. It makes extensive use of marketing research for reframing strategies and actions by partners, collaborators and communities in the evolving context of a just transition to a carbon-neutral future.

Findings

The results highlight the ecological, economic, social and cultural reframing of peatlands from fossil fuel and waste lands to regenerative ecosystems bursting with biodiversity and climate solution opportunities. Reframing impacts requires muddling through the ebbs and flows of planned, possible and unanticipated change that can deliver benefits for peatlands and people over time.

Research limitations/implications

At 3 of 7.5 years into a project, the authors are muddling through how ecological reframing impacts economic and social/cultural reframing. Further impacts, planned and unplanned, can be expected.

Practical implications

This paper shows how an impact planning canvas tool and impact taxonomy can be applied for social and systems change. The tools can be used throughout a project to understand, respond to and manage for unplanned events. There is constant learning, constantly going back to the impact planning canvas and checking where we are, what is needed. There is action and reaction to each other and to the diversity of stakeholders affected and being affected by the reframing work.

Originality/value

This paper considers how systemic change through ecological, economic, social and cultural reframing is a perfectly imperfect process of muddling through which holds the promise of environmental, economic, technological, political, social and educational impacts to benefit nature, individuals, communities, organisations and society.