Search results

1 – 10 of 668
Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2023

Loai Ali Zeenalabden Ali Alsaid and Charles Anyeng Ambilichu

This study aims to explore the potential dynamics between performance measurement at the organisational level and emerging urban development projects at the macro-institutional…

Abstract

Purpose

This study aims to explore the potential dynamics between performance measurement at the organisational level and emerging urban development projects at the macro-institutional field level of sustainability governance and accountability.

Design/methodology/approach

Using a theoretical triangulation between three theories, namely contingency theory, institutional theory and social cognitive theory, this study investigates not only the macro-micro dynamics, but also the (recursive) micro-macro dynamics between performance measurement and urban development. Using an Egyptian public sector urban development organisation and its sustainable energy project as an empirical example, interviews, documents and observations were collected.

Findings

The dynamics emerged between field urban development projects and the (unintended) organisational implementation of the performance measurement system, the sustainability key performance indicators (KPIs) reporting system. Contributing to previous literature, these dynamics have been institutionalised through (three) interrelated levels: the (macro-field) urban development contingencies and pressures for sustainability KPIs reporting, the (organisational) institutionalisation of the urban development performance measurement system and then the (micro-organisational) cognitive role of sustainability KPIs reports in (re)making political urban development decisions.

Research limitations/implications

This study faced some limitations that paved the way for future research axes. For political and security reasons, difficulties were encountered in conducting interviews with government actors in the sustainable energy project under study. Also, due to the practical separation of the environmental sustainability system from the sustainability KPIs reporting system in this case study, environmental sustainability is outside the scope.

Practical implications

Sustainability reports may influence public sector decision-making processes in a specific urban development context. These KPIs reports may also increase public sector management opportunities for urban auditing, transparency, accountability and sustainability governance. These KPIs may also guide public sector management to lower prices in poor villages to increase smart energy consumption and improve community health.

Social implications

Sustainability reports may increase decision-makers' understanding of consumer behaviours and societal changes. This may help in making appropriate political decisions to improve their welfare and regular smart energy consumption. Not only urban citizens, but this social advantage may also extend to urban development employees through employees' promotion, training and access to government-funded academic and professional scholarships.

Originality/value

This study is an attempt to develop current public sector performance measurement analyses in the emerging urban development field using a triadic analytical approach. This study also fed the literature with an extended case study that clarified the (multi-level) and (two-way) dynamics between performance measurement and urban development.

Details

Journal of Accounting in Emerging Economies, vol. 14 no. 1
Type: Research Article
ISSN: 2042-1168

Keywords

Book part
Publication date: 10 April 2024

Ifzal Ahmad and M. Rezaul Islam

This chapter explores the vital connection between ethics and community development, underlining the fundamental role of ethical considerations in shaping fair, just, and…

Abstract

This chapter explores the vital connection between ethics and community development, underlining the fundamental role of ethical considerations in shaping fair, just, and sustainable communities. It begins by emphasizing that community development is inherently ethical and delves into the concept of ethics, examining ethical theories like consequentialism, deontology, and virtue ethics in the context of community development. Real-world case studies from diverse countries, such as South Africa, Australia, and India, are interwoven throughout the chapter to provide practical insights. These case studies illustrate the complexities of ethical implementation in community development, from navigating power dynamics to addressing conflicts of interest and balancing immediate needs with long-term sustainability. The chapter also explores macro-level considerations, highlighting the need for systemic change to create a more just and equitable society. It guides practitioners on integrating ethics into their work, establishing a strong moral framework for community development. Continuous learning, reflective practice, and adaptability are underscored as essential in responding to evolving societal contexts, norms, and challenges.

Details

Building Strong Communities: Ethical Approaches to Inclusive Development
Type: Book
ISBN: 978-1-83549-175-1

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 September 2023

Christopher Chapman, Asako Kimura, Norio Sawabe and Hiroyuki Selmes-Suzuki

This paper aims to explore how researchers in general, and field researchers in particular, might respond to systems of governance of the researchers' activity in ways that can…

Abstract

Purpose

This paper aims to explore how researchers in general, and field researchers in particular, might respond to systems of governance of the researchers' activity in ways that can support rather than distort the quality of the research.

Design/methodology/approach

We draw upon literature on serendipity to develop a framework for engaging with the positive and negative potentials of systems of governance. We ground our analysis in discussion of participation in the field comprising two parts: first, the examination of our own activities and second, the accounts of participation found in two career-autobiographical interviews with emeritus professors of management accounting from Japan.

Findings

We highlight the potential for a productive tension between two contrasting perspectives that researchers might take on governance of their activity. A contractual perspective sees the value of targets and detailed pre-planning. A reflexive perspective sees the value of exploring the unexpected and considering many alternatives. We offer a framework for considering serendipity and the conditions that facilitate serendipity to help researchers maintain a productive tension between these perspectives.

Research limitations/implications

We build upon retrospective accounts of two successful individuals whose careers evolved in a specific context. The intention is not to set out what might be generally achievable in a research career, nor to propose specific lines of action or planning in relation to specific systems of governance, since these vary across countries and over time. Rather, the paper draws on these materials to illuminate the more general challenge of preparing for serendipity in a way that goes beyond simple opportunism.

Originality/value

We analyse how researchers' mindfulness of serendipity and the nature of contexts that facilitate serendipity can encourage a productive tension between contractual and reflexive perspectives on governance of academic activity.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 3
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 13 February 2024

Anne-Sophie Thelisson and Olivier Meier

Organizational resilience, defined by a firm’s speed in reaching a dynamic equilibrium after a shock and after the shocks are absorbed, and crisis management are critical in a…

Abstract

Purpose

Organizational resilience, defined by a firm’s speed in reaching a dynamic equilibrium after a shock and after the shocks are absorbed, and crisis management are critical in a global crisis. The concept of resilience is increasingly used in the economic press; nevertheless, few studies demonstrate empirically how firms became resilient and the lessons to be learned from it. Traditionally, the concept of resilience is approached as resistance in the face of a crisis. The authors go further by showing three-loop learning, which is part of a logic of innovation and regeneration. This study aims to examine how a business can regenerate itself by effectively managing the external threats and disruptions caused by a crisis. Also, this study deepens knowledge on learning process. The double-loop learning process is known in the literature as enabling firms to learn from unexpected events and react accordingly. The findings point out a third loop implying the co-invention of a new business model and a collective mindfulness of changes made.

Design/methodology/approach

Using longitudinal data, the authors investigate how the global crisis affects merger negotiations between two companies. This study analyzes the period of dialogue (negotiation) between the two entities with a view to carrying out a merger and then their withdrawal from the project during the pandemic, reshuffling the cards for each company. The negotiation period is not normally disclosed because of its highly confidential and strategic nature and it is therefore difficult for researchers to access merger operations at the negotiation stage. From this viewpoint, this case study was chosen because of the availability of generally inaccessible documentation.

Findings

This in-depth case study provides new insights on organizational resilience and the recovery capacity of a firm. The results underline four main triggers that a firm should develop in facing a major crisis: skills; credits; previous and historical relationships; and corporate culture. Recovery capacity depends on reactivity, flexibility, learning and regeneration. Finally, this study points out a three-loop learning experience that can be understood as a learning process in two steps to generate lasting and adaptive changes.

Research limitations/implications

The limitations are those concerning a single case study.

Practical implications

This study highlights the ability to deal with unexpected events. First, this work identifies concrete items that can be perceived by managers as elements enabling a firm to develop resilience. Second, the results show main elements enabling this capacity as reactivity – both companies react quickly and effectively to disturbances to limit the impact on their performance; or flexibility – firms adapt their business model to deal with disruptions. Third, this work underlines a learning capacity process in three steps to recover capacity. This process stimulates creativity and innovation by the teams and stakeholders by placing them at the heart of the change.

Originality/value

This case provides a vivid illustration of firms’ adaptation to a rapidly evolving context because of a global crisis. Theoretical concepts and empirical findings from the literature are combined to present a single consistent picture.

Details

Journal of Business Strategy, vol. 45 no. 3
Type: Research Article
ISSN: 0275-6668

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 2 June 2023

Stephanie Chasserio and Eliane Bacha

Based on the transformative learning theory, this paper analyses a French women-only training programme (WOTP) that aims to develop women’s soft skills in their professional…

Abstract

Purpose

Based on the transformative learning theory, this paper analyses a French women-only training programme (WOTP) that aims to develop women’s soft skills in their professional contexts. This paper aims to focus on the process of personal transformation, the collective dimensions and the unexpected effects of the transformation.

Design/methodology/approach

This paper used a mixed qualitative design that mainly combines a qualitative two-step study of 47 women to assess their personal changes in terms of self-confidence, self-efficacy and assertiveness. This paper used 13 semi-structured interviews to explore the perceived changes in-depth.

Findings

The analysis shows that beyond “fixing their lack of skills” – including self-limiting behaviours, low feelings of self-efficacy and difficulty claiming one’s place – a WOTP can trigger a transformational learning experience at the individual level and can modify the surveyed women’s attitudes and behaviours at work. The results also highlight the collective dimension of transformation and, to some extent, an avenue for a societal transformation.

Practical implications

One can state that these WOTPs may positively contribute to human resources development in organisations, and that they may be considered a relevant practice in the move to promote women and gender diversity in organisations.

Originality/value

The findings reveal that, at their individual levels, these women may become agents of change by influencing and acting in their professional lives. The results stress that training women may contribute to organisational changes in terms of gender diversity. These findings contribute to the enrichment of the transformative learning theory by developing the collective and societal dimensions.

Open Access
Article
Publication date: 14 December 2023

Paola Bellis, Silvia Magnanini and Roberto Verganti

Taking the dialogic organizational development perspective, this study aims to investigate the framing processes when engaging in dialogue for strategy implementation and how…

Abstract

Purpose

Taking the dialogic organizational development perspective, this study aims to investigate the framing processes when engaging in dialogue for strategy implementation and how these enable the evolution of implementation opportunities.

Design/methodology/approach

Through a qualitative exploratory study conducted in a large multinational, the authors analyse the dialogue and interactions among 25 dyads when identifying opportunities to contribute to strategy implementation. The data analysis relies on a process-coding approach and linkography, a valuable protocol analysis for identifying recursive interaction schemas in conversations.

Findings

The authors identify four main framing processes – shaping, unveiling, scattering and shifting – and provide a framework of how these processes affect individuals’ mental models through increasing the tangibility of opportunities or elevating them to new value hierarchies.

Research limitations/implications

From a theoretical perspective, this study contributes to the strategy implementation and organizational development literature, providing a micro-perspective of how dialogue allows early knowledge structures to emerge and shape the development of opportunities for strategy implementation.

Practical implications

From a managerial perspective, the authors offer insights to trigger action and change in individuals to contribute to strategy when moving from formulation to implementation.

Originality/value

Rather than focusing on the structural control view of strategy implementation and the role of the top management team, this study considers strategy implementation as a practice and what it takes for organizational actors who do not take part in strategy formulation to enact and shape opportunities for strategy implementation through constructive dialogue.

Details

Journal of Knowledge Management, vol. 28 no. 11
Type: Research Article
ISSN: 1367-3270

Keywords

Article
Publication date: 29 June 2023

Samer Abaddi and Moh'd Anwer AL-Shboul

Digital entrepreneurship is the key to economic survival and the lantern of jobs in developing countries. The debate about the challenges facing early digital entrepreneurs (DEs…

Abstract

Purpose

Digital entrepreneurship is the key to economic survival and the lantern of jobs in developing countries. The debate about the challenges facing early digital entrepreneurs (DEs) in developing countries is still ambiguous. This study attempts to fulfill the gap with an in-depth examination of Jordan.

Design/methodology/approach

Referring to a digital start-up database hosted by the Ministry of Digital Economy and Entrepreneurship in Jordan, the study interviews a random sample of (n = 45) early (less than one-year seniority) DEs. Thematic analysis is carried out facilitated by NVivo 20 software. E-Commerce, agriculture technology, data and artificial intelligence and entertainment were at the top of the interviewed start-ups.

Findings

Nine challenges were observed, critically analyzed and discussed. The challenges are (1) the lack of realistic funding in terms and guarantees; (2) the negligence of guidance and advisory of incubators and entrepreneurship centres; (3) the emergence of unexpected risks; (4) the stringent economic situation; (5) competition; (6) legal and legislative obstacles; (7) obstacles to accessing markets; (8) team management and finally (9) disorganization in the entrepreneurial environment. The study sets recommendations to support early DEs in their journey.

Practical implications

This study highlights the significant implications for aspiring DEs by focusing on some challenges that might face their start-ups such as institutional, technology and local dimensions of context and measures to develop the entrepreneurial and digital competencies. This includes sustainable funding, poor direct guidance and advisory, unexpected failures/risks, and economic obstacles. This study might be considered a road map for the decision-makers to build their strategies for eliminating the main barriers for early DEs and start-ups.

Originality/value

Although recent literature discussed the challenges of entrepreneurs in Jordan, this is the first that identifies early DEs’ challenges and uses 45% samples of the community.

Details

Management & Sustainability: An Arab Review, vol. 3 no. 1
Type: Research Article
ISSN: 2752-9819

Keywords

1 – 10 of 668