Search results
1 – 2 of 2Si Yee Tiew, Helena Aman Hashim and Umi Kalsum Zolkafli @ Zulkifly
Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the…
Abstract
Purpose
Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the context of graduate architects. The purpose of this study is to identify factors influencing the effectiveness of graduate architects in CCA and possible methods to enhance their work efficiency through developing the relevant skills in a changing construction environment.
Design/methodology/approach
This paper identified the factors that influence the effectiveness of graduate architects in CCA through the quantitative methods. General skill elements that are perceived as essential for the effectiveness of CCA had been investigated through a survey of graduate architects in the construction industry. One hundred and twenty-seven completed questionnaires returned were analyzed and tested using descriptive analysis and relative important index (RII).
Findings
The result from the study showed that the factors influencing the effectiveness of graduate architects as CCA are building construction skills, design management skills, project management skills, soft skills and dispute resolution skills.
Originality/value
The contribution of this study can be utilized for developing models/tools in the future that would improve the work performance of graduate architects in CCA. Educators may utilize this study to improve their syllabus to cater to the market's demand and facilitate students' entry into the labor market.
Details
Keywords
Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh
The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…
Abstract
Purpose
The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.
Design/methodology/approach
The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.
Findings
Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.
Practical implications
The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.
Originality/value
This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.
Details