Publication date: 14 December 2021

SeyedReza RazaviAlavi and Simaan AbouRizk

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site…

Abstract

Purpose

Integrating construction and site layout planning in mechanized tunnel infrastructure projects is essential due to the mutual impacts of construction planning and site layout decisions. Simulation can incorporate site layout planning and construction planning of tunneling projects in a unified environment. However, simulation adoption by industry practitioners has remained relatively limited due to the special skills required for building and using simulation models. Therefore, this paper aims to create a simple-to-use simulation tool that supports site layout and construction operation planning of tunneling projects. This tool intends to promote the simulation application in site layout planning.

Design/methodology/approach

The current paper proposes simulation as a decision support tool (DST) to provide an integrated environment for modeling tunnel construction operations, site layout and capturing the mutual impacts. A special purpose simulation (SPS) tool was customized and developed for typical mechanized tunneling projects, by tunnel boring machines, to facilitate building the model and allow access to users with limited simulation knowledge.

Findings

The results show that the developed SPS tool is of great assistance to construction industry practitioners to analyze a variety of site layout and construction plan scenarios and make informed decisions based on its comprehensive and intuitive outputs.

Originality/value

The main contribution of this research is to promote simulation application in site layout planning of tunneling projects through the development of a simple-to-use tool, which has sufficient details for site layout planning and constraints. The developed DST enables planners to make decisions simultaneously on the site layout, other construction planning variables and identify the most efficient plan.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 September 2011

Yasser Ebrahimy, Simaan M. AbouRizk, Siri Fernando and Yasser Mohamed

The purpose of this paper is to develop a simulation model capable of capturing the complex variables impacting the productivity of tunneling construction projects.

2025

Abstract

Purpose

The purpose of this paper is to develop a simulation model capable of capturing the complex variables impacting the productivity of tunneling construction projects.

Design/methodology/approach

Simulation modeling is used to construct high‐level models of construction supply networks in order to perform quantitative analysis, enabling planners to work out the embedded complexities of the system.

Findings

This study presents a detailed simulation model of a real life tunnel construction project along with its supply chain of liner segments. Using this detailed model, a sensitivity analysis for the tunneling project shows the impact of chosen variables on the duration of a tunneling project; these results are used to verify the importance of considering the whole supply chain of a construction project in the planning stage.

Practical implications

Effective quality control, consideration of the shortage of storage space, and anticipation of required lead time when placing the first order to achieve the full storage capacity of liners before the start of a project are some practices that can be employed by construction organizations to address supply chain issues for tunneling projects.

Originality/value

Research into quantifying the benefits of implementing supply chain management (SCM) is very limited: the literature for the construction industry generally discusses how SCM concepts can be adopted, or what problems and challenges inhibit such adoption without analyzing and quantifying the effects of these techniques on an actual construction project.

Details

Engineering, Construction and Architectural Management, vol. 18 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 August 2020

Hui Lu, Junxiong Qi, Jue Li, Yong Xie, Gangyan Xu and Hongwei Wang

In shield tunneling projects, human, shield machine and underground environment are tightly coupled and interacted. Accidents often occur under dysfunctional interactions…

Abstract

Purpose

In shield tunneling projects, human, shield machine and underground environment are tightly coupled and interacted. Accidents often occur under dysfunctional interactions among them. Therefore, this paper aims to develop a multi-agent based safety computational experiment system (SCES) and use it to identify the main influential factors of various aspects of human, shield machine and underground environment.

Design/methodology/approach

The methods mainly comprised computational experiments and multi-agent technologies. First, a safety model with human-machine-environment interaction consideration is developed through the multi-agent technologies. On this basis, SCES is implemented. Then computational experiments are designed and performed on SCES for analyzing safety performance and identifying the main influential factors.

Findings

The main influential factors of two common accidents are identified. For surface settlement, the main influential factors are ranked as experience, soil density, soil cohesion, screw conveyor speed and thrust force in descending order of influence levels; for mud cake on cutter, they are ranked as soil cohesion, experience, cutter speed and screw conveyor speed. These results are consistent with intuition and previous studies and demonstrate the applicability of SCES.

Practical implications

The proposed SCES provides comprehensive risk factor identification for shield tunneling projects and also insights to support informed decisions for safety management.

Originality/value

A safety model with human-machine-environment interaction consideration is developed and computational experiments are used to analyze the safety performance. The novel method and model could contribute to system-based safety research and promote systematic understanding of the safety performance of shield tunneling projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 March 2011

Vahed Ghiasi, Husaini Omar, Bujang B. Kim Huat, Ratnasamy Muniandi, B. Zainuddin and Yusof

The purpose of this paper is to introduce the numerical methods in tunnel engineering and their capabilities to indicate the fracture and failure in all kinds of tunneling

Abstract

Purpose

The purpose of this paper is to introduce the numerical methods in tunnel engineering and their capabilities to indicate the fracture and failure in all kinds of tunneling methods such as New Austrian Tunneling Method, tunnel boring machine and cut‐cover. An essential definition of numerical modeling of tunnels to determine the interaction between geo‐material (soil and rock) surrounding the tunnel structure is discussed.

Design/methodology/approach

Tunnel geo‐material (soil and rock) interaction requires advanced constitutive models for the numerical simulation of linear, nonlinear, time‐dependent, anisotropic, isotropic, homogenous and nonhomogeneous behaviors. The numerical models discussed in this paper are developed in finite element method (FEM), finite deference method (FDM), boundary element method and discrete element method and these tools are used to illustrate the behavior of tunnel structure deformation under different loads and in complicated conditions. The disadvantage of this method is the tunnel lining assumed an independent structure under fixed load which is unable to model soil‐lining interaction. Predicting the effect of all natural factors on tunnels is the most difficult method. The above‐mentioned numerical methods are very simple and quick to use and the results are conservative and practical for users. One of the most significant advantages of the numerical method is in predicting the critical area surrounding the tunnel and the tunnel structure before making the tunnel construction due to different loads.

Findings

Numerical modeling is used as control method in reducing the risk of tunnel construction failures. Since some factors such as settlement and deformation are not completely predictable in rock and soil surrounding the tunnel, using numerical modeling is a very economical and capable method in predicting the behavior of tunnel structures in various complicated conditions of loading. Another benefit of using numerical simulation is in the colorful illustrations predicting the tunnel behavior before, during and after construction and operation.

Originality/value

There are not many conducted studies using numerical models to tunnel structures that estimate the critical zones. As some of the methods available have limitation in simulating and modeling the whole tunnel design factors, numerical modeling seems to be the best option, because it is fast, economical, accurate and more interesting in predicating critical zones in tunnel. However, what softwares predict are not always the same as real ground nature conditions in which there is tunnel.

Details

Journal of Engineering, Design and Technology, vol. 9 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 October 2018

Xueliang Zhang, Meixia Wang, Binghua Zhou and Xintong Wang

Because of the properties of loess, the occurrence of collapse following deformation of a large settlement is a common problem during the excavation of tunnels on loess…

Abstract

Purpose

Because of the properties of loess, the occurrence of collapse following deformation of a large settlement is a common problem during the excavation of tunnels on loess ground. Hence, risk management for safer loess tunnel construction is of great significance. The purpose of this paper is to explore the influence of factors on collapse risk of loess tunnels and establish a risk assessment model using rough set theory and extension theory.

Design/methodology/approach

The surrounding rock level, groundwater conditions, burial depth, excavation method and support close time were selected as the factors and settlement deformation was the verification index for risk assessment. First, using rough set theory, the influence of risk factors on the collapse risk of loess tunnels was calculated by researching engineering data of excavated sections. Then, a collapse risk assessment model was developed based on extension theory. As the final step, the model was applied to practical engineering in the Loess Plateau of China.

Findings

The weights of surrounding rock level, groundwater conditions, burial depth, excavation method and support close time obtained using rough set theory were respectively 10.811 per cent, 18.919 per cent, 24.324 per cent, 40.541 per cent and 5.406 per cent. The assessment results obtained using the model were in good agreement with field observations.

Originality/value

This study highlights key points in collapse risk management of loess tunnels, which could be very useful for future construction methods. The model, using easily obtained parameters, helps in predicting the collapse risk level of loess tunnels excavated under different geological conditions and by different construction organizations and provides a reference for future studies.

Details

Journal of Engineering, Design and Technology, vol. 16 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 31 May 2019

Seyed Ehsan Zahed, Sirwan Shahooei, Ferika Farooghi, Mohsen Shahandashti and Siamak Ardekani

The purpose of this paper is to conduct life-cycle cost analysis of a short-haul underground freight transportation (UFT) system for the Dallas Fort Worth international airport.

Abstract

Purpose

The purpose of this paper is to conduct life-cycle cost analysis of a short-haul underground freight transportation (UFT) system for the Dallas Fort Worth international airport.

Design/methodology/approach

The research approach includes: identifying the cost components of the proposed airport UFT system; estimating life-cycle cost (LCC) of system components using various methods; determining life-cycle cash flows; evaluating the reliability of the results using sensitivity analysis; and assessing the validity of the results using analogues cases.

Findings

Although the capital cost of constructing an airport UFT system seems to be the largest cost of such innovative projects, annual costs for running the system are more significant, taking a life-cycle perspective. System administrative cost, tunnel operation and maintenance, and tunnel construction cost are the principle cost components of the UFT system representing approximately 46, 24 and 19 percent of the total LCC, respectively. The shipping cost is estimated to be $4.14 per ton-mile. Although this cost is more than the cost of transporting cargos by trucks, the implementation of UFT systems could be financially justified considering their numerous benefits.

Originality/value

This paper, for the first time, helps capital planners understand the LCC of an airport UFT system with no or limited past experience, and to consider such innovative solutions to address airport congestion issues.

Details

Built Environment Project and Asset Management, vol. 9 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 19 July 2019

Zhi Ding, Xiao Zhang, Xinsheng Yin and Jiqing Jiang

This paper aims to analyse the effect of soft soil grouting on the deformation of the closed shield tunnel with the measured data.

204

Abstract

Purpose

This paper aims to analyse the effect of soft soil grouting on the deformation of the closed shield tunnel with the measured data.

Design/methodology/approach

Combining the measured data of vertical, horizontal and convergence deformation of the adjacent tunnel during the grouting construction in foundation pit engineering, the influence of grouting on metro tunnel in soft soil area is analyzed.

Findings

The researches indicate that early grouting has the main effect on the horizontal displacement of the tunnel; Due to the disturbing effect of the uninterrupted grouting construction on the soil and the transfer pressure of the rheological soil to the bottom of the tunnel, the tunnel is obviously lifted; And the convergence deformation of the tunnel increases caused by the overburden pressure in the vertical direction, so that the tunnel appears the phenomenon of staggered seam, large opening of bolted joint, damaged segment even leakage of water.

Originality/value

The study based on the field monitoring data is rarely reported, especially the topic about inadvertent grouting in soft soil area is likely to cause severe deformation of adjacent metro tunnel.

Details

Engineering Computations, vol. 36 no. 5
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 10 May 2019

Zhi Ding, Xinjiang Wei, Xiao Zhang and Xinsheng Yin

The shield tunnels closely constructed near the foundations have an inevitable influence on the structures, even results in the large settlement or uplift of the structures.

Abstract

Purpose

The shield tunnels closely constructed near the foundations have an inevitable influence on the structures, even results in the large settlement or uplift of the structures.

Design/methodology/approach

The comparison of structural deformation of three different foundations is presented based on the field monitoring data.

Findings

Shield tunnelling parameters vary for the different types of foundations. For the long pile foundations, the recommended speed is 3 to 4 cm/min, the grouting pressure is about 0.3 MPa and the grouting rate ranges from 150 to 180.

Originality/value

The study based on the field monitoring data is rarely reported, especially the topic about the structural deformation of different types of the foundations.

Details

Engineering Computations, vol. 36 no. 4
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 13 September 2022

Mohamed Nabil Houhou, Tamir Amari and Abderahim Belounar

This paper aims to investigate the responses of single piles and pile groups due to tunneling-induced ground movements in a two-layered soil system. The analyses mainly…

10

Abstract

Purpose

This paper aims to investigate the responses of single piles and pile groups due to tunneling-induced ground movements in a two-layered soil system. The analyses mainly focus on the additional single pile responses in terms of bending moment, lateral deflection, axial force, shaft resistance and pile settlement. Subsequently, a series of parametric studies were carried out to better understand the responses of single piles induced by tunneling. To give further understanding regarding the pile groups, a 2 × 2 pile group with two different pile head conditions, namely, free and capped, was considered.

Design/methodology/approach

Using the PLAXIS three-dimensional (3D) software, a full 3D numerical modeling is performed to investigate the effects of ground movements caused by tunneling on adjacent pile foundations. The numerical model was validated using centrifuge test data found in the literature. The relevance of the 3D model is also judged by comparison with the 2D plane strain model using the PLAXIS 2D code.

Findings

The numerical test results reveal that tunneling induces significant displacements and internal forces in nearby piles. The magnitude and distribution of internal forces depend mainly on the position of the pile toe relative to the tunnel depth and the distance between the pile and the vertical axis of the tunnel. As the volume loss increases from 1% to 3%, the apparent loss of pile capacity increases from 11% to 20%. By increasing the pile length from 0.5 to 1.5 times, the tunnel depth, the maximum pile settlement and lateral deflection decrease by about 63% and 18%, respectively. On the other hand, the maximum bending moment and axial load increase by about 7 and 13 times, respectively. When the pile is located at a distance of 2.5 times the tunnel diameter (Dt), the additional pile responses become insignificant. It was found that an increase in tunnel depth from 1.5Dt to 2.5Dt (with a pile length of 3Dt) increases the maximum lateral deflection by about 420%. Regarding the interaction between tunneling and group of piles, a positive group effect was observed with a significant reduction of the internal forces in rear piles. The maximum bending moment of the front piles was found to be higher than that of the rear piles by about 47%.

Originality/value

Soil is a complex material that shows differently in primary loading, unloading and reloading with stress-dependent stiffness. This general behavior was not possibly being accounted for in simple elastic perfectly plastic Mohr–Coulomb model which is often used to predict the behavior of soils. Thus, in the present study, the more advanced hardening soil model with small-strain stiffness (HSsmall) is used to model the non-linear stress–strain soil behavior. Moreover, unlike previous studies THAT are usually based on the assumption that the soil is homogeneous and using numerical methods by decoupled loadings under plane strain conditions; in this study, the pile responses have been exhaustively investigated in a two-layered soil system using a fully coupled 3D numerical analysis that takes into account the real interactions between tunneling and pile foundations. The paper presents a distinctive set of findings and insights that provide valuable guidance for the design and construction of shield tunnels passing through pile foundations.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Open Access
Article
Publication date: 2 May 2022

Ao Li, Dingli Zhang, Zhenyu Sun, Jun Huang and Fei Dong

The microseismic monitoring technique has great advantages on identifying the location, extent and the mechanism of damage process occurring in rock mass. This study aims…

Abstract

Purpose

The microseismic monitoring technique has great advantages on identifying the location, extent and the mechanism of damage process occurring in rock mass. This study aims to analyze distribution characteristics and the evolution law of excavation damage zone of surrounding rock based on microseismic monitoring data.

Design/methodology/approach

In situ test using microseismic monitoring technique is carried out in the large-span transition tunnel of Badaling Great Wall Station of Beijing-Zhangjiakou high-speed railway. An intelligent microseismic monitoring system is built with symmetry monitoring point layout both on the mountain surface and inside the tunnel to achieve three-dimensional and all-round monitoring results.

Findings

Microseismic events can be divided into high density area, medium density area and low density area according to the density distribution of microseismic events. The positions where the cumulative distribution frequencies of microseismic events are 60 and 80% are identified as the boundaries between high and medium density areas and between medium and low density areas, respectively. The high density area of microseismic events is regarded as the high excavation damage zone of surrounding rock, which is affected by the grade of surrounding rock and the span of tunnel. The prediction formulas for the depth of high excavation damage zone of surrounding rock at different tunnel positions are given considering these two parameters. The scale of the average moment magnitude parameters of microseismic events is adopted to describe the damage degree of surrounding rock. The strong positive correlation and multistage characteristics between the depth of excavation damage zone and deformation of surrounding rock are revealed. Based on the depth of high excavation damage zone of surrounding rock, the prestressed anchor cable (rod) is designed, and the safety of anchor cable (rod) design parameters is verified by the deformation results of surrounding rock.

Originality/value

The research provides a new method to predict the surrounding rock damage zone of large-span tunnel and also provides a reference basis for design parameters of prestressed anchor cable (rod).

Details

Railway Sciences, vol. 1 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

1 – 10 of over 3000