Search results

1 – 10 of over 50000
Article
Publication date: 13 February 2024

Wenqi Mao, Kexin Ran, Ting-Kwei Wang, Anyuan Yu, Hongyue Lv and Jieh-Haur Chen

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for…

Abstract

Purpose

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for transportation cost optimization. Traditional irregular component loading methods are based on past performance, which frequently wastes vehicle space. Additionally, real-time road conditions, precast component assembly times, and delivery vehicle waiting times due to equipment constraints at the construction site affect transportation time and overall transportation costs. Therefore, this paper aims to provide an optimization model for Just-In-Time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time.

Design/methodology/approach

In order to propose a JIT (just-in-time) delivery optimization model, the effects of the sizes of irregular precast components, the assembly time, and the loading methods are considered in the 3D loading constraint model. In addition, for JIT delivery, incorporating real-time road conditions in the transportation process is essential to mitigate delays in the delivery of precast components. The 3D precast component loading problem is solved by using a hybrid genetic algorithm which mixes the genetic algorithm and the simulated annealing algorithm.

Findings

A real case study was used to validate the JIT delivery optimization model. The results indicated this study contributes to the optimization of strategies for loading irregular precast components and the reduction of transportation costs by 5.38%.

Originality/value

This study establishes a JIT delivery optimization model with the aim of reducing transportation costs by considering 3D loading constraints, real-time road conditions and assembly time. The irregular precast component is simplified into 3D bounding box and loaded with three-space division heuristic packing algorithm. In addition, the hybrid algorithm mixing the genetic algorithm and the simulated annealing algorithm is to solve the 3D container loading problem, which provides both global search capability and the ability to perform local searching. The JIT delivery optimization model can provide decision-makers with a more comprehensive and economical strategy for loading and transporting irregular precast components.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 March 2023

Yiran Dan and Guiwen Liu

Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs…

Abstract

Purpose

Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs. However, there is still a lack of production and transportation scheduling methods that comprehensively consider delivery timeliness and transportation economy. This article aims to study the integrated scheduling optimization problem of in-plant flowshop production and off-plant transportation under the consideration of practical constraints of customer order delivery time window, and seek an optimal scheduling method that balances delivery timeliness and transportation economy.

Design/methodology/approach

In this study, an integrated scheduling optimization model of flowshop production and transportation for precast components with delivery time windows is established, which describes the relationship between production and transportation and handles transportation constraints under the premise of balancing delivery timeliness and transportation economy. Then a genetic algorithm is designed to solve this model. It realizes the integrated scheduling of production and transportation through double-layer chromosome coding. A program is designed to realize the solution process. Finally, the validity of the model is proved by the calculation of actual enterprise data.

Findings

The optimized scheduling scheme can not only meet the on-time delivery, but also improve the truck loading rate and reduce the total cost, composed of early cost in plant, delivery penalty cost and transportation cost. In the model validation, the optimal scheduling scheme uses one less truck than the traditional EDD scheme (saving 20% of the transportation cost), and the total cost can be saved by 17.22%.

Originality/value

This study clarifies the relationship between the production and transportation of precast components and establishes the integrated scheduling optimization model and its solution algorithm. Different from previous studies, the proposed optimization model can balance the timeliness and economy of production and transportation for precast components.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 May 2019

Xiabao Huang and Lixi Yang

Flexible job-shop scheduling is significant for different manufacturing industries nowadays. Moreover, consideration of transportation time during scheduling makes it more…

1062

Abstract

Purpose

Flexible job-shop scheduling is significant for different manufacturing industries nowadays. Moreover, consideration of transportation time during scheduling makes it more practical and useful. The purpose of this paper is to investigate multi-objective flexible job-shop scheduling problem (MOFJSP) considering transportation time.

Design/methodology/approach

A hybrid genetic algorithm (GA) approach is integrated with simulated annealing to solve the MOFJSP considering transportation time, and an external elitism memory library is employed as a knowledge library to direct GA search into the region of better performance.

Findings

The performance of the proposed algorithm is tested on different MOFJSP taken from literature. Experimental results show that proposed algorithm performs better than the original GA in terms of quality of solution and distribution of the solution, especially when the number of jobs and the flexibility of the machine increase.

Originality/value

Most of existing studies have not considered the transportation time during scheduling of jobs. The transportation time is significantly desired to be included in the FJSP when the time of transportation of jobs has significant impact on the completion time of jobs. Meanwhile, GA is one of primary algorithms extensively used to address MOFJSP in literature. However, to solve the MOFJSP, the original GA has a possibility to get a premature convergence and it has a slow convergence speed. To overcome these problems, a new hybrid GA is developed in this paper.

Details

International Journal of Intelligent Computing and Cybernetics, vol. 12 no. 2
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 29 March 2022

Jorge O. Moreno, Cinthya G. Caamal-Olvera and Edgar M. Luna

This paper aims to analyze the demand for mobility in higher education to understand the critical elements of students' mobility and the potential impact of accessing sustainable…

Abstract

Purpose

This paper aims to analyze the demand for mobility in higher education to understand the critical elements of students' mobility and the potential impact of accessing sustainable alternatives. The demand for different means of transportation accounts for socioeconomic variables such as household income and size, gender, age, among other travel factors such as distance, time, speed and direct cost.

Design/methodology/approach

This research uses a unique data set encompassing a representative sample of households across gender and municipalities in the Monterrey Metropolitan Area in Mexico. This paper uses the value of transportation time savings approach to estimate the derived demand for mobility in higher education across different means. The empirical strategy uses a linear utility framework in a multinomial non-ordered logit model to analyze the conditional selection of transportation as a function of sociodemographics, direct monetary costs and travel determinants such as travel time, distance and speed.

Findings

Men students are more likely to use an unsustained transportation mode such as a car or cab than women. Income is a crucial determinant for transportation demand. There is a negative relationship between household income and walking or riding the bus but positive with driving a car. An increase in the time of the trip decreases the probability of walking while increasing the likelihood of using a car or riding the bus to school. Students who feel safe while riding a bus are more likely to use the bus or walk as transportation than using a car. Finally, having access to better quality sidewalks significantly incentive walking over other transportation options.

Practical implications

Results show that individuals would almost always choose private vehicles because of the personal comforts and time savings.

Social implications

Understanding the demand for higher education and access to sustainable transportation might provide new insights into campus planning and development. Access to public transportation options can reduce the travel costs for students with lower incomes and enlarge options for students who have to commute longer distances by car. Sustainable transportation access plays a role in promoting equality and economic development.

Originality/value

This study’s results bring new light on how transportation becomes an essential component of the opportunity cost of college education and could define its role in promoting equality or increasing inequality. This study’s finding is of particular interest for cities where housing location seems to be independent of access to school, work or other amenities.

Details

International Journal of Sustainability in Higher Education, vol. 24 no. 2
Type: Research Article
ISSN: 1467-6370

Keywords

Article
Publication date: 6 January 2021

Cristina Toca Pérez and Dayana Bastos Costa

This paper proposes to apply the lean philosophy principle of minimizing or eliminating non-value adding activities combined with 4D building information modeling (BIM…

Abstract

Purpose

This paper proposes to apply the lean philosophy principle of minimizing or eliminating non-value adding activities combined with 4D building information modeling (BIM) simulations to reduce transportation waste in construction production processes.

Design/methodology/approach

This study adopts design science research (DSR) because of its prescriptive character to produce innovative constructions (artifacts) to solve real-world problems. The artifact proposed is a set of constructs for evaluating the utility of 4D BIM simulations for transportation waste reduction. The authors performed two learning cycles using empirical studies in projects A, B and C. The construction process of cast-in-place (CIP) reinforcement concrete (RC) was selected to demonstrate and evaluate 4D BIM's utility. The empirical studies focused on understanding the current transportation waste, collecting actual performance data during job site visits and demonstrating the usage of 4D BIM.

Findings

In the first cycle, 4D BIM successfully allowed users to understand the CIP-RC process's transportation activities, which were modeled. In the second cycle, 4D BIM enabled better decision-making processes concerning the definitions of strategies for placing reusable formworks for CIP concrete walls by planning transportation activities.

Practical implications

In Cycle 2, three different scenarios were simulated to identify the most suitable formwork assembly planning, and the results were compared to the real situations identified during the job site visits. The scenario chosen demonstrated that the 4D BIM simulation yielded an 18.75% cycle time reduction. In addition, the simulation contributed to a decrease in transportation waste that was previously identified.

Originality/value

The original contribution of this paper is the use of 4D BIM simulation for managing non-value adding activities to reduce transportation waste. The utility of 4D BIM for the reduction of those conflicts considered three constructs: (1) the capacity to improve transportation activity efficiency, (2) the capacity to improve construction production efficiency and (3) the capacity to reduce transportation waste consequences.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2023

Jeen Guo, Pengcheng Xiang, Qiqi Liu and Yun Luo

The purpose of this paper is to propose a method that can calculate the transportation infrastructure network service capacity enhancement given by planned transportation

Abstract

Purpose

The purpose of this paper is to propose a method that can calculate the transportation infrastructure network service capacity enhancement given by planned transportation infrastructure projects construction. Managers can sequence projects more rationally to maximize the construction effectiveness of infrastructure investments.

Design/methodology/approach

This paper designed a computational network simulation software to generate topological networks based on established rules. Based on the topological networks, the software simulated the movement path of users and calculated the average travel time. This software allows the adjustment of parameters to suit different research objectives. The average travel time is used as an evaluation index to determine the most appropriate construction sequence.

Findings

In this paper, the transportation infrastructure network of Sichuan Province in China was used to demonstrate this software. The average travel time of the existing transportation network in Sichuan Province was calculated as 211 min using this software. The high-speed railways from Leshan to Xichang and from Xichang to Yibin had the greatest influence on shortening the average travel time. This paper also measured the changes in the average travel time under two strategies: shortening the maximum and minimum priorities. All the transportation network optimisation plans for Sichuan Province will be somewhere between these two strategies.

Originality/value

The contribution of this research are three aspects: First, a complex network analysis method that can take into account the differences of node elements is proposed. Second, it provides an effective tool for decision makers to plan transportation infrastructure construction. Third, the construction sequence of transportation infrastructure development plan can effect the infrastructure investment effectiveness.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 August 2019

Xueyan Yang, Changxi Ma, Changfeng Zhu, Bo Qi, Fuquan Pan and Chengming Zhu

For the purpose of reducing the incidence of hazardous materials transport accident, eliminating the potential threats and ensuring their safety, aiming at the shortcomings in the…

2732

Abstract

Purpose

For the purpose of reducing the incidence of hazardous materials transport accident, eliminating the potential threats and ensuring their safety, aiming at the shortcomings in the process of current hazardous materials transportation management, this paper aims to construct the framework of hazardous materials transportation safety management system under the vehicle-infrastructure connected environment.

Design/methodology/approach

The system takes the intelligent connected vehicle as the main supporter, integrating GIS, GPS, eye location, GSM, networks and database technology.

Findings

By analyzing the transportation characteristics of hazardous materials, this system consists of five subsystems, which are vehicle and driver management subsystem, dangerous sources and hazardous materials management subsystem, route analysis and optimization subsystem, early warning and emergency rescue management subsystem, and basic information query subsystem.

Originality/value

Hazardous materials transportation safety management system includes omnibearing real-time monitoring, timely updating of system database, real-time generation and optimization of emergency rescue route. The system can reduce the transportation cost and improve the ability of accident prevention and emergency rescue of hazardous materials.

Details

Journal of Intelligent and Connected Vehicles, vol. 2 no. 1
Type: Research Article
ISSN: 2399-9802

Keywords

Article
Publication date: 28 April 2020

Hong Zhang and Lu Yu

Prefabricated construction concerns off-site production, multi-mode transportation and on-site installation of the prefabricated components, which are interdependent and…

1078

Abstract

Purpose

Prefabricated construction concerns off-site production, multi-mode transportation and on-site installation of the prefabricated components, which are interdependent and dynamically interactive, so coordination among the multiple stages along the prefabricated component supply chain (PCSC) is indispensable. This study aims to solve the dynamic transportation planning problem for the PCSC by addressing the interdependency, dynamic interaction and coordination among the multiple stages and different objectives of the stakeholders.

Design/methodology/approach

The PCSC is analyzed and then the formulation for the dynamic transportation planning problem is developed based on the just-in-time (JIT) strategy. The particle swarm optimization (PSO) algorithm is applied to solve the dynamic optimization problem.

Findings

The proposed dynamic transportation planning method for the PCSC regarding component supplier selection, transportation planning for means, routes and schedule, site layout planning and transportation plan adjustment is able to facilitate coordination among the multiple stages by addressing their interdependencies and dynamic interactions, as well as different economic objectives of the stakeholders such as suppliers or the contractor.

Originality/value

The study helps to achieve the advantages of prefabricated construction by prompting coordination among multiple stages of the PCSC by realizing different benefits of the stakeholders. In addition, it provides the stakeholders with the competitive bidding prices and the evaluation data for the bids quote. Meanwhile, it contributes to the domain knowledge of the PCSC management with regard to the viewpoint of coordination and integration of multiple stages rather than only one stage as well as the dynamic optimization model based on the JIT strategy and the PSO algorithm.

Article
Publication date: 1 June 2023

Sareh Khazaeli, Mohammad Saeed Jabalameli and Hadi Sahebi

Due to the importance of quality to customers, this study considers criteria of quality and profit and optimizes both in a multi-echelon cold chain of perishable agricultural…

Abstract

Purpose

Due to the importance of quality to customers, this study considers criteria of quality and profit and optimizes both in a multi-echelon cold chain of perishable agricultural products whose quality immediately begins to deteriorate after harvest. The two objectives of the proposed cold chain are to maximize profit and quality. Since postharvest quality loss in the supply chain depends on various decisions and factors, in addition to strategic decisions, the authors consider the temperature setting in refrigerated facilities and transportation vehicles due to the unfixed shelf life of the products which is related to the temperature found by Arrhenius formula.

Design/methodology/approach

The authors use bi-objective mixed-integer nonlinear programming to design a four-echelon supply chain. The authors integrate the supply chain echelons to detect the sources and factors of quality loss. The four echelons include supply, processing, storage and customer. The decisions, including facility location, assigning nodes of each echelon to corresponding nodes from the adjacent echelon, allocation of vehicles to transport the products from farms to wholesalers, processing selection, and temperature setting in refrigerated facilities, are made in an integrated way. Model verification and validation in the case study are done based on three perishable herbal plants.

Findings

The model obtains a 29% profit against a total cost of 71 and 93% of original quality of the crops is maintained, indicating a 7% quality loss. The final quality of 93% is the result of making a US$6m investment in the supply chain, including the procurement of high-quality raw materials; facility establishment; high-speed, high-capacity vehicles; location assignment; processing selection and refrigeration equipment in the storage and transportation systems, helping to maximize both the final quality of the products and the total profit.

Research limitations/implications

The proposed supply chain model should help managers with modeling decisions, especially when it comes to cold chains for agricultural products. The model yields these results – optimal location-allocation decisions for the facilities to minimize distances between the network nodes, which save time and maintain the majority of the products’ original quality; choosing the most appropriate processing method, which reduces the perishability rate; providing high-capacity, high-speed vehicles in the logistics system, which minimizes transportation costs and maximizes the quality; and setting the right temperature in the refrigerated facilities, which mitigates the postharvest decay reaction rate of the products.

Practical implications

Comparison of the results of the present research with those of the traditional chain (obtained through experts) shows that since the designed chain increases the profit as well as the final quality, it has benefits for the main chain stakeholders, which are customers of agricultural products. This study model is expected to have a positive impact on the environment by placing strong emphasis on quality and preventing excessive waste generation and air pollution by imposing a financial penalty on extra demand production.

Social implications

Since profit and quality of the final product are two important factors in all cultures and communities, the proposed supply chain model can be used in any food industry around the world. Applying the proposed model induces growth in local industries and promotes the culture of prioritizing quality in societies.

Originality/value

To the best of the authors’ knowledge, this is the first research on a bi-objective four-echelon (supply, processing, storage and customer) postharvest supply chain for agricultural products including that integrates transportation logistics and considers the deterioration rate of products as a time-dependent variable at different levels of decision-making.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 4 November 2014

Athakorn Kengpol, Sopida Tuammee and Markku Tuominen

The purpose of this paper is to develop a framework for route selection in multimodal transportation which can reduce cost, lead time, risk and CO2 emission in multimodal…

3303

Abstract

Purpose

The purpose of this paper is to develop a framework for route selection in multimodal transportation which can reduce cost, lead time, risk and CO2 emission in multimodal transportation systems.

Design/methodology/approach

This research proposes the development of a framework for route selection in multimodal transportation that includes a six-phase framework to select an optimal multimodal transportation route. The first phase is to collect the data of each route and select the origin and destination. The second phase is to calculate time and cost of each route by using a multimodal transport cost-model. In the third phase, the CO2 emissions are calculated based upon the 2006 guidelines of Intergovernmental Panel on Climate Change. The fourth phase proposes an integrated quantitative risk assessment, analytic hierarchy process (AHP) and data envelopment analysis methodology to evaluate the multimodal transportation risk. The fifth phase is to prioritize criteria by using the AHP which can be used in the objective function. The final phase is to calculate the optimal route by using the zero-one goal programming.

Findings

The aims of the model are to minimize transportation costs, transportation time, risk and CO2 emission.

Practical implications

The approach has been tested on a realistic multimodal transportation service, originating from Bangkok in Thailand to a destination at Da Nang port in Vietnam. The results have shown that the approach can provide guidance in choosing the lowest cost route in accordance with other criteria, and to minimize the CO2 emission effectively.

Originality/value

The contribution of this research lies in the development of a new decision support approach that is flexible and applicable to logistics service providers, in selecting multimodal transportation route under the multi-criteria in term of cost, time, risk and importantly the environmental impact.

1 – 10 of over 50000