Search results
1 – 10 of over 1000The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…
Abstract
Purpose
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.
Design/methodology/approach
This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.
Findings
The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.
Research limitations/implications
The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.
Practical implications
The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.
Originality/value
The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.
Details
Keywords
Leticia Mahuwi and Baraka Israel
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial…
Abstract
Purpose
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial for developing effective strategies and policies. This research seeks to investigate whether e-procurement plays a significant role in enhancing transparency and accountability and subsequently reducing corruption risks in the public pharmaceutical procurement system.
Design/methodology/approach
The study employed a cross-sectional questionnaire survey to gather data from 274 procurement personnel and pharmacists working in 28 government-owned hospitals in the Southern Highlands of Tanzania. The collected data were then analysed using confirmatory factor analysis (CFA) and the Hayes PROCESS macro to test the study hypotheses.
Findings
The study findings revealed a negative and significant relationship between transparency and procurement corruption (ß = −0.117, p < 0.008). Moreover, accountability negatively and significantly affects procurement corruption (ß = −0.162, p = 0.006). Furthermore, the findings indicate that, at a high degree of e-procurement system implementation, transparency and accountability have a stronger impact on procurement anti-corruption measures.
Practical implications
Policymakers and decision-makers should implement robust mechanisms that enhance transparency, accountability and anti-corruption efforts. These may include providing clear and accessible information on procurement processes, efficient mechanisms for monitoring and reporting procurement irregularities and continuous improvement of e-procurement systems. By incorporating these measures and nurturing collaboration amongst procurement stakeholders, it becomes possible to foster a procurement environment characterised by integrity, fairness, accountability and reduced corruption.
Originality/value
Whilst previous studies delved into exploring the effect of transparency and accountability on procurement anti-corruption, the novelty of this study is the inclusion of e-procurement as a moderating variable in the relationship between transparency, accountability and anti-corruption. By so doing, this study adds to the existing body of knowledge regarding anti-corruption measures and offers valuable practical insights for policymakers and professionals aiming to enhance transparency, accountability and ethical conduct within the public pharmaceutical procurement system.
Details
Keywords
Javad Bakhshi, Saba Mani, Navid Ahmadi Eftekhari and Igor Martek
International development projects are a dominant means by which aid is distributed to countries. Over the past 70 years, the distribution of trillions of dollars of development…
Abstract
Purpose
International development projects are a dominant means by which aid is distributed to countries. Over the past 70 years, the distribution of trillions of dollars of development aid has been mediated by the United Nations (UN). However, most of this aid has failed to deliver the expected outcomes for which it was assigned. Nevertheless, a significant proportion of projects can be considered successful. Despite the glaring question as to which factors contribute to the success or failure of projects, no study has comprehensively documented the relationship between procurement mechanisms invoked to deliver aid projects and project outcomes. This study aims to assess this relationship.
Design/methodology/approach
Leveraging network analysis methodology, this study examines the World Bank data set of over 247,000 developmental contracts worldwide granted over the past 20 years. It identifies the range of procurement practices used and interrogates their ability to deliver satisfactory project outcomes.
Findings
Eleven prevalent practices are identified covering aid projects across twelve sectors. As might be expected, Africa is the largest recipient of aid, while the Middle East is the least. Overwhelmingly, international competitive bidding (ICB) is the leading procurement procedure, both in terms of contract number and total dollar value. However, ICB does not always deliver the best outcomes, with other, more boutique approaches sometimes doing better.
Social implications
The breadth of this study, encompassing such a vast data resource, and generating such a rich pool of findings will now empower researchers to take the next important step, which is to progress this study in exploring why it is that certain procurement strategies have worked for some sectors, but not others. Countries, financial institutions, the UN and construction enterprises alike will be very interested in the results.
Originality/value
The spectrum of outcomes identified will be of interest to academics and practitioners alike wishing to investigate further the drivers behind the results described here.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Daniel Ofori, Osman Light and Joseph Ankomah
Electronic government procurement is an important platform that promotes efficient, transparent, competitive and agile delivery of procurement activities in public sector…
Abstract
Purpose
Electronic government procurement is an important platform that promotes efficient, transparent, competitive and agile delivery of procurement activities in public sector organisations. Implementing units who play a major role exhibits different attitude towards new technology. The purpose of this paper is to assess if there is any significant difference between optimistic and discomfort implementing units in relation to the implementation and intention to use the Ghana Electronic Procurement System (GHANEPS).
Design/methodology/approach
Technology Readiness, Technology Acceptance and Unified Theory of Acceptance and Use of Technology and Diffusion Innovation Theory constituted the theoretical foundation. Guided by a cross sectional survey design, quantitative data from a sample of 181 procurement officers was collected using structured questionnaires. The hypothesised relationships were analysed using partial least squares structural equation modelling (PLS-SEM).
Findings
Although there were some observable differences, the bootstrap results show that the difference was not significant, implying that these two groups do not differ much about the GHANEPS introduction and implementation. This is justifiable in the case of Ghana because public policies are made by top officials, and those in the grassroot or implementation domain have no choice but to act accordingly.
Research limitations/implications
This study focused on metropolitan, municipal, district assemblies, public hospitals, tertiary institutions and senior high schools.
Practical implications
The study contributes to the critical antecedents for electronic procurement implementation and public sector management literature. It provides public institutions and practitioners with empirical evidence on how beliefs and perceptions of implementing units about electronic public procurement has some influence on attitude towards usage and intention to use. Positive attitudes and perceptions of the public procurement officers can be reinforced through adequate training and awareness creation.
Social implications
This study outcomes can serve as philosophical underpinnings for societal development.
Originality/value
This study used a multi-group analysis to examine if there is any significant difference between these two categories of implementing units (optimistic group and discomfort group) in relation to facilitating conditions, personal innovativeness, perceived usefulness, perceived ease of use and ultimately to attitude and intention to use GHANEPS.
Details
Keywords
Ibrahim Yahaya Wuni and Derek Asante Abankwa
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural…
Abstract
Purpose
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural, civil engineering and infrastructure projects from the extraction of natural resources and their wasteful usage. However, it introduces additional layers of novel risks and uncertainties in the delivery of projects. The purpose of this study is to review the relevant literature to discover, classify and theorize the critical risk factors for circular construction projects.
Design/methodology/approach
The paper conducted a systematic literature review to investigate the risks of circular construction projects. It deployed a multistage approach, including literature search and assessment, metadata extraction, citation frequency analysis, Pareto analysis and total interpretive structural modeling.
Findings
Sixty-eight critical risk factors were identified and categorized into nine broad taxonomies: material risks, organizational risks, supply chain risks, technological risks, financial risks, design risks, health and safety risks, regulatory risks and stakeholder risks. Using the Pareto analysis, a conceptual map of 47 key critical risk factors was generated for circular construction projects. A hierarchical model was further developed to hypothesize the multiple possible connections and interdependencies of the taxonomies, leading to chain reactions and push effects of the key risks impacting circular construction projects.
Originality/value
This study constitutes the first systematic review of the literature, consolidating and theorizing the chain reactions of the critical risk factors for circular construction projects. Thus, it provides a better understanding of risks in circular construction projects.
Details
Keywords
Benedict Ansere, Joshua Ayarkwa, Michael Nii Addy, Dickson Osei-Asibey and Ivy Maame Abu
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and…
Abstract
Purpose
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and specifically on environmental sustainability in the Public Procurement Act 2003 (Act 663) as amended.
Design/methodology/approach
Through purposive sampling technique and face-to-face interviews using semi-structured open-ended questions, qualitative data was collected from 19 POs who are well vested in the procurement profession and willingly agreed to partake in the research. The qualitative data were analyzed using content analysis technique to help organize and elicit meaning from the data collected and to draw realistic conclusions from it.
Findings
The results showed that most POs were aware of the Public Procurement Act 2003 (Act 663) as amended, primarily through seminars and workshops organized by the Public Procurement Authority. The interviewees demonstrated a good understanding of sustainable procurement, considering its social, environmental and economic aspects. However, one respondent primarily associated sustainability with only environmental issues. The POs were, however, of the view that the Amended Act 914 (2016) does not give detailed highlights on environmental sustainability, making implementation very difficult, especially regarding the procurement of goods. Overall, the findings indicate a positive level of environmental sustainability awareness and knowledge among the interviewed POs regarding the Public Procurement Act 2003 (Act 663) as amended.
Social implications
The findings from the study could be used by policymakers to strategize educational campaigns by using the POs’ knowledge and awareness to the implementers of Act 663 (2003) as amended to effectively ensure environmental sustainability in procurement practices. The findings from the study have also contributed to the literature on procurement policy by drawing the attention of policy formulators to give equal attention to all the sustainability pillars, i.e. social, economic and environmental. This would consequently help the implementers to contribute to achieving sustainable development.
Originality/value
This study is one of the few empirical qualitative types of research seeking the views of POs in tertiary educational institutions in Ghana on sustainability and environmental sustainability as enshrined in the Public Procurement Act 2003 (Act 663) as amended. The findings give positive feedback to policymakers on the knowledge and awareness level of the POs on environmental sustainability and highlight the importance of awareness programmes and educational initiatives by the Public Procurement Authority and other stakeholders to ensure compliance with the Act.
Details
Keywords
Amer A. Hijazi, Srinath Perera, Rodrigo N. Calheiros and Ali Alashwal
Despite a large amount of BIM data at the handover stage, it is still difficult to identify and effectively isolate valuable construction supply chain (CSC) data that need to be…
Abstract
Purpose
Despite a large amount of BIM data at the handover stage, it is still difficult to identify and effectively isolate valuable construction supply chain (CSC) data that need to be reliably handed over for operation. Moreover, the role of reconciling disparate data is usually played by one party. The integration of blockchain and BIM is a plausible framework for building a reliable digital asset lifecycle. This paper proposes a BIM single source of truth (BIMSSoT) data model using blockchain for ensuring a reliable CSC data delivery.
Design/methodology/approach
This paper utilises a blended methodology, the foundation of which is ingrained in business and management research with elements of information and communication technology (ICT) research wherever required. Knowledge elicitation case studies utilising novel interventions such as a data flow diagram (DFD), taxonomy and entity-relationship diagram (ERD) were used in this paper to develop the BIMSSoT data model. The model was validated using an expert forum, and its technological feasibility was established by developing a proof of concept.
Findings
The practical contribution of this research leads to the progression of BIM towards digital engineering to go beyond object-based 3D modelling by building structured and reliable datasets, transitioning from project-centric records to a digital ecosystem of linked databases by utilizing blockchain's potential for ensuring trusted data.
Originality/value
To the best of the author's knowledge, prior to this paper, no research had investigated a detailed data model development leveraging blockchain and BIM to integrate an immutable and complete record of CSC data as another dimension of BIM for operations.
Details
Keywords
Lekan Damilola Ojo, Deji Rufus Ogunsemi, Ahmed Elyamany and Ayodeji Emmanuel Oke
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for…
Abstract
Purpose
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for ameliorating poor project outcomes in the construction industry is a critical step to overcoming its implementation. Therefore, this study aims to examine the barriers to the adoption of VM in the Nigerian construction industry (NCI) and identify the critical ones for action by construction stakeholders.
Design/methodology/approach
This study used two rounds of Delphi surveys with 15 VM experts to identify the challenges to VM adoption. The Delphi team’s data from the two surveys were analysed using descriptive statistics. The mean-mode approach was used to identify ten major barriers to VM adoption based on the consensus reached during the second round of the Delphi poll. Following that, an interrater agreement analysis and a significant level analysis were performed.
Findings
Of the 17 identified barriers hindering VM adoption on construction projects in the NCI, 10 were found to be profound after statistical analyses of the data. The significant barriers include communication gap between the client and other consultants; delay in design preparation because of VM services; the pretext that VM is being practiced in the construction industry; and the wrong perception of VM by construction professionals, among others. The findings of the analysis suggested that the lack of VM adoption in the NCI was because of inadequate knowledge of VM techniques among construction professionals. Therefore, it is advised that VM training be provided for concerned stakeholders to address the lack of VM expertise among Nigerian construction professionals.
Practical implications
This study investigated the barriers to VM adoption on construction projects in the NCI with the opinions of a few construction professionals who can be regarded as VM experts. As against obtaining large survey responses from construction professionals who may not be knowledgeable in the VM process, the limited VM experts’ responses provide a valid basis for drawing inferences and making recommendations to address the paucity of VM applications in the NCI.
Originality/value
Through a Delphi survey, the critical barriers to the adoption of VM were identified, along with recommendations to help construction stakeholders overcome the challenges and enjoy the benefits of VM.
Details
Keywords
Innocent Chigozie Osuizugbo, Fidelis Okechukwu Ezeokoli, Kevin Chuks Okolie and Aduragbemi Deborah Olojo
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into…
Abstract
Purpose
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into buildability in construction in the previous years, there is little information concerning how buildability practice can be successfully implemented. This paper aims to develop a conceptual framework that explains how buildability practice can be implemented successfully in the construction industry.
Design/methodology/approach
The paper uses an integrative literature review method to synthesise literature from different domains to describe various themes by which buildability assessment can be successfully implemented in the construction industry.
Findings
The findings of the review of literature conceptualised a buildability implementation framework at four principal themes: buildability attributes for improving the practice of construction management, factors supporting the implementation of buildability assessment, measures for improving the buildability of building designs and factors impeding the implementation of buildability assessment.
Originality/value
The outcome of this study contributes to knowledge in three different ways. First, the framework emerging from this study provides guidance to stakeholders on strategies for the successful implementation of buildability. Second, the information gathered in this study is useful for the development of buildability assessment tool. Finally, the framework has a potential of improving the practice of embedding buildability into designs. The detailed descriptions of the relevant variables at each principal theme advance the understanding of buildability in the construction industry and are fundamental to developing buildability assessment tools for the industry.
Details