Search results
1 – 10 of 720The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…
Abstract
Purpose
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.
Design/methodology/approach
This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.
Findings
The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.
Research limitations/implications
The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.
Practical implications
The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.
Originality/value
The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.
Details
Keywords
Leticia Mahuwi and Baraka Israel
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial…
Abstract
Purpose
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial for developing effective strategies and policies. This research seeks to investigate whether e-procurement plays a significant role in enhancing transparency and accountability and subsequently reducing corruption risks in the public pharmaceutical procurement system.
Design/methodology/approach
The study employed a cross-sectional questionnaire survey to gather data from 274 procurement personnel and pharmacists working in 28 government-owned hospitals in the Southern Highlands of Tanzania. The collected data were then analysed using confirmatory factor analysis (CFA) and the Hayes PROCESS macro to test the study hypotheses.
Findings
The study findings revealed a negative and significant relationship between transparency and procurement corruption (ß = −0.117, p < 0.008). Moreover, accountability negatively and significantly affects procurement corruption (ß = −0.162, p = 0.006). Furthermore, the findings indicate that, at a high degree of e-procurement system implementation, transparency and accountability have a stronger impact on procurement anti-corruption measures.
Practical implications
Policymakers and decision-makers should implement robust mechanisms that enhance transparency, accountability and anti-corruption efforts. These may include providing clear and accessible information on procurement processes, efficient mechanisms for monitoring and reporting procurement irregularities and continuous improvement of e-procurement systems. By incorporating these measures and nurturing collaboration amongst procurement stakeholders, it becomes possible to foster a procurement environment characterised by integrity, fairness, accountability and reduced corruption.
Originality/value
Whilst previous studies delved into exploring the effect of transparency and accountability on procurement anti-corruption, the novelty of this study is the inclusion of e-procurement as a moderating variable in the relationship between transparency, accountability and anti-corruption. By so doing, this study adds to the existing body of knowledge regarding anti-corruption measures and offers valuable practical insights for policymakers and professionals aiming to enhance transparency, accountability and ethical conduct within the public pharmaceutical procurement system.
Details
Keywords
Advocates of structured stakeholder management (SM) processes have emphasized the use of the appropriate strategies as the most important process in SM. Yet, research effort in…
Abstract
Purpose
Advocates of structured stakeholder management (SM) processes have emphasized the use of the appropriate strategies as the most important process in SM. Yet, research effort in this regard in developing countries has been inadequate. The purpose of the study was to examine the SM strategies used on building projects procured by private corporate organisations in south-western Nigeria to enhance project performance.
Design/methodology/approach
The study used a census survey to select 30 projects managers who indicated (from 106 who responded to a first stage questionnaire) that they have participated in structured SM in the study area between 2008 and 2017. A second-stage questionnaire was designed to elicit information from the respondents. Data analysis was done with the use of frequency, percentile and mean score (MS) and analysis of variance (ANOVA).
Findings
Stakeholders with high power and high interest were managed with the use of “collaborate/partner” strategy (MS = 3.86), stakeholders with high power and low interest were “kept satisfied” (MS = 4.09), stakeholders with low power and high interest were managed by using “keep them informed regularly” strategy (MS = 4.10) and stakeholders with low power and low interest were managed using “monitor and respond when necessary” strategy (M = 3.94). Further results show that static stakeholders with high power were managed by using the “monitor constantly” strategy (MS = 4.11), stakeholders with high power, high legitimacy and high urgency were managed by adopting the “keep satisfied” strategy (MS = 4.26), to manage non-supportive stakeholders, project managers adopted the “keep satisfied” strategy (MS = 4.18) and supportive stakeholders were managed by using “involved” strategy (MS = 4.02). More results showed that there is no significant difference in the opinion of project managers on SM strategies employed irrespective of procurement method.
Practical implications
The study provided a guide to project managers on the appropriate SM strategies to use for future projects.
Originality/value
The study was an attempt to appraise the SM strategies in relation to the procurement methods and their relationship with project performance.
Details
Keywords
Ibrahim Yahaya Wuni and Derek Asante Abankwa
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural…
Abstract
Purpose
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural, civil engineering and infrastructure projects from the extraction of natural resources and their wasteful usage. However, it introduces additional layers of novel risks and uncertainties in the delivery of projects. The purpose of this study is to review the relevant literature to discover, classify and theorize the critical risk factors for circular construction projects.
Design/methodology/approach
The paper conducted a systematic literature review to investigate the risks of circular construction projects. It deployed a multistage approach, including literature search and assessment, metadata extraction, citation frequency analysis, Pareto analysis and total interpretive structural modeling.
Findings
Sixty-eight critical risk factors were identified and categorized into nine broad taxonomies: material risks, organizational risks, supply chain risks, technological risks, financial risks, design risks, health and safety risks, regulatory risks and stakeholder risks. Using the Pareto analysis, a conceptual map of 47 key critical risk factors was generated for circular construction projects. A hierarchical model was further developed to hypothesize the multiple possible connections and interdependencies of the taxonomies, leading to chain reactions and push effects of the key risks impacting circular construction projects.
Originality/value
This study constitutes the first systematic review of the literature, consolidating and theorizing the chain reactions of the critical risk factors for circular construction projects. Thus, it provides a better understanding of risks in circular construction projects.
Details
Keywords
Benedict Ansere, Joshua Ayarkwa, Michael Nii Addy, Dickson Osei-Asibey and Ivy Maame Abu
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and…
Abstract
Purpose
This study aims to assess the awareness and knowledge level of procurement officers (POs) in Ghanaian tertiary educational institutions regarding sustainability in general and specifically on environmental sustainability in the Public Procurement Act 2003 (Act 663) as amended.
Design/methodology/approach
Through purposive sampling technique and face-to-face interviews using semi-structured open-ended questions, qualitative data was collected from 19 POs who are well vested in the procurement profession and willingly agreed to partake in the research. The qualitative data were analyzed using content analysis technique to help organize and elicit meaning from the data collected and to draw realistic conclusions from it.
Findings
The results showed that most POs were aware of the Public Procurement Act 2003 (Act 663) as amended, primarily through seminars and workshops organized by the Public Procurement Authority. The interviewees demonstrated a good understanding of sustainable procurement, considering its social, environmental and economic aspects. However, one respondent primarily associated sustainability with only environmental issues. The POs were, however, of the view that the Amended Act 914 (2016) does not give detailed highlights on environmental sustainability, making implementation very difficult, especially regarding the procurement of goods. Overall, the findings indicate a positive level of environmental sustainability awareness and knowledge among the interviewed POs regarding the Public Procurement Act 2003 (Act 663) as amended.
Social implications
The findings from the study could be used by policymakers to strategize educational campaigns by using the POs’ knowledge and awareness to the implementers of Act 663 (2003) as amended to effectively ensure environmental sustainability in procurement practices. The findings from the study have also contributed to the literature on procurement policy by drawing the attention of policy formulators to give equal attention to all the sustainability pillars, i.e. social, economic and environmental. This would consequently help the implementers to contribute to achieving sustainable development.
Originality/value
This study is one of the few empirical qualitative types of research seeking the views of POs in tertiary educational institutions in Ghana on sustainability and environmental sustainability as enshrined in the Public Procurement Act 2003 (Act 663) as amended. The findings give positive feedback to policymakers on the knowledge and awareness level of the POs on environmental sustainability and highlight the importance of awareness programmes and educational initiatives by the Public Procurement Authority and other stakeholders to ensure compliance with the Act.
Details
Keywords
Lekan Damilola Ojo, Deji Rufus Ogunsemi, Ahmed Elyamany and Ayodeji Emmanuel Oke
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for…
Abstract
Purpose
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for ameliorating poor project outcomes in the construction industry is a critical step to overcoming its implementation. Therefore, this study aims to examine the barriers to the adoption of VM in the Nigerian construction industry (NCI) and identify the critical ones for action by construction stakeholders.
Design/methodology/approach
This study used two rounds of Delphi surveys with 15 VM experts to identify the challenges to VM adoption. The Delphi team’s data from the two surveys were analysed using descriptive statistics. The mean-mode approach was used to identify ten major barriers to VM adoption based on the consensus reached during the second round of the Delphi poll. Following that, an interrater agreement analysis and a significant level analysis were performed.
Findings
Of the 17 identified barriers hindering VM adoption on construction projects in the NCI, 10 were found to be profound after statistical analyses of the data. The significant barriers include communication gap between the client and other consultants; delay in design preparation because of VM services; the pretext that VM is being practiced in the construction industry; and the wrong perception of VM by construction professionals, among others. The findings of the analysis suggested that the lack of VM adoption in the NCI was because of inadequate knowledge of VM techniques among construction professionals. Therefore, it is advised that VM training be provided for concerned stakeholders to address the lack of VM expertise among Nigerian construction professionals.
Practical implications
This study investigated the barriers to VM adoption on construction projects in the NCI with the opinions of a few construction professionals who can be regarded as VM experts. As against obtaining large survey responses from construction professionals who may not be knowledgeable in the VM process, the limited VM experts’ responses provide a valid basis for drawing inferences and making recommendations to address the paucity of VM applications in the NCI.
Originality/value
Through a Delphi survey, the critical barriers to the adoption of VM were identified, along with recommendations to help construction stakeholders overcome the challenges and enjoy the benefits of VM.
Details
Keywords
Patience Tunji-Olayeni, Kahilu Kajimo-Shakantu, Timothy Oluwafemi Ayodele and Olubola Babalola
Sustainability transformation in the construction industry is vital for the attainment of sustainable development goals. While conventional construction has been at the expense of…
Abstract
Purpose
Sustainability transformation in the construction industry is vital for the attainment of sustainable development goals. While conventional construction has been at the expense of social and economic sustainability, sustainable construction can enhance environmental, social and economic outcomes for the construction industry and society at large. However, the industry struggles with new initiates because its stakeholders are products of unique institutions which shape their decisions and intentions to adopt new practices. This study assessed the institutional pressures that influence the adoption of sustainable construction to enhance our understanding of other factors that can promote and accelerate the adoption of sustainable construction.
Design/methodology/approach
The study adopted a quantitative research design with the use of online questionnaires to elicit information from construction professionals in South Africa. Descriptive statistics of frequencies, mean and standard deviation were used to analyse the data obtained from the survey. Linear regression was also used to assess the influence of institutional pressures on the adoption of sustainable construction.
Findings
Mimetic pressures were found to have a significant influence on the adoption of sustainable construction. The decision to adopt sustainable construction was based on the sustainability actions of industry leaders (mimetic pressure). Normative and coercive pressures had no significant influence on the adoption of sustainable construction.
Practical implications
Mimetic pressure from competitors and normative pressures is already exerting some pressure on stakeholders to adopt sustainable construction. However, there cannot be a long-term commitment that will yield the needed sustainability transformations without additional normative pressure from learned societies and coercive pressure from the government. As one of the pioneering works from the global south, this study provides empirical validations of the influence of institutional pressures on the adoption of sustainable construction. It also enhances understanding of how institutional pressures from the social context can promote and accelerate the adoption of sustainable construction.
Originality/value
The findings present one of the pioneering efforts to empirically validate the influence of institutional pressures on the adoption of sustainable construction.
Details
Keywords
Innocent Chigozie Osuizugbo, Fidelis Okechukwu Ezeokoli, Kevin Chuks Okolie and Aduragbemi Deborah Olojo
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into…
Abstract
Purpose
The application of good buildability practices is vital for improving the performance of projects and businesses in the construction sector. Despite the plethora of research into buildability in construction in the previous years, there is little information concerning how buildability practice can be successfully implemented. This paper aims to develop a conceptual framework that explains how buildability practice can be implemented successfully in the construction industry.
Design/methodology/approach
The paper uses an integrative literature review method to synthesise literature from different domains to describe various themes by which buildability assessment can be successfully implemented in the construction industry.
Findings
The findings of the review of literature conceptualised a buildability implementation framework at four principal themes: buildability attributes for improving the practice of construction management, factors supporting the implementation of buildability assessment, measures for improving the buildability of building designs and factors impeding the implementation of buildability assessment.
Originality/value
The outcome of this study contributes to knowledge in three different ways. First, the framework emerging from this study provides guidance to stakeholders on strategies for the successful implementation of buildability. Second, the information gathered in this study is useful for the development of buildability assessment tool. Finally, the framework has a potential of improving the practice of embedding buildability into designs. The detailed descriptions of the relevant variables at each principal theme advance the understanding of buildability in the construction industry and are fundamental to developing buildability assessment tools for the industry.
Details
Keywords
Ifedolapo Helen Babalola, Clinton Ohis Aigbavboa, John Aliu and Ayodeji Emmanuel Oke
The workforce upon which the construction industry relies, known as human resources (HRs), faces challenges such as poor management, inadequate implementation of human resource…
Abstract
Purpose
The workforce upon which the construction industry relies, known as human resources (HRs), faces challenges such as poor management, inadequate implementation of human resource management practices (HRMPs) and psychosocial issues. This study aims to identify and assess the impact of emotional intelligence (EI) attributes on the implementation of HRMPs in the Nigerian construction industry (NCI) to enhance business performance as well as the performance and productivity of HRs.
Design/methodology/approach
A mixed-methods research design combining qualitative and quantitative approaches was used to gather expert perspectives on specific EI attributes. Data analysis involved the use of interquartile deviation, median, standard deviation, mean, Cronbach’s alpha and exploratory factor analysis (EFA).
Findings
The study identified 12 EI attributes that influenced HRMPs implementation, with 1 attribute having a very high impact (9.00–10.00) and 11 scoring high impact (7.00–8.99). Further analysis using EFA resulted in the identification of two major attribute clusters: “team relationship” and “self-management”.
Practical implications
These findings have significant implications for construction professionals, HRs and policymakers, as they address the challenges faced by construction stakeholders in terms of physical and mental well-being, which can affect their emotions while carrying out construction activities. Construction organizations should consider incorporating support systems into their policies to influence HRMPs implementation in the workplace.
Originality/value
The study provides valuable insights for developing nations such as Nigeria regarding the essential EI attributes for successful HRMPs implementation.
Details
Keywords
J. Sreejith and P.G. Saleeshya
Rice is an important grain in Indian scenarios, and the purpose of the research work is to identify the attributes which can be the possible barriers in the traditional rice…
Abstract
Purpose
Rice is an important grain in Indian scenarios, and the purpose of the research work is to identify the attributes which can be the possible barriers in the traditional rice supply chain network.
Design/methodology/approach
A multilevel conceptual model is developed based on the literature review, and a field study is conducted by administering a questionnaire from the experts. Fuzzy logic methodology and a ranking score method is applied to identify the rice supply chain performance and the barriers of the traditional rice supply chain network.
Findings
The rice supply chain performance index for the traditional rice supply chain network is obtained, and the performance of the existing rice supply chain is found to be “fair”. The “information flow” is the attribute that can be a critical weak attribute in the traditional rice supply chain network. A proposed model of the blockchain technology-enabled rice supply chain network is developed as a solution for the “information flow” barrier.
Research limitations/implications
The present research work is focussed on the generalized rice supply chain model of the Indian scenario, and more detailed studies can be carried out based on the regional issues.
Originality/value
The rice supply chain plays an important role in Indian economic development, and hence the current research paper focusses on identifying the barriers and the performance of the existing rice supply chain network.
Details