Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 14 March 2022

Luke McCully, Hung Cao, Monica Wachowicz, Stephanie Champion and Patricia A.H. Williams

A new research domain known as the Quantified Self has recently emerged and is described as gaining self-knowledge through using wearable technology to acquire information on…

Abstract

Purpose

A new research domain known as the Quantified Self has recently emerged and is described as gaining self-knowledge through using wearable technology to acquire information on self-monitoring activities and physical health related problems. However, very little is known about the impact of time window models on discovering self-quantified patterns that can yield new self-knowledge insights. This paper aims to discover the self-quantified patterns using multi-time window models.

Design/methodology/approach

This paper proposes a multi-time window analytical workflow developed to support the streaming k-means clustering algorithm, based on an online/offline approach that combines both sliding and damped time window models. An intervention experiment with 15 participants is used to gather Fitbit data logs and implement the proposed analytical workflow.

Findings

The clustering results reveal the impact of a time window model has on exploring the evolution of micro-clusters and the labelling of macro-clusters to accurately explain regular and irregular individual physical behaviour.

Originality/value

The preliminary results demonstrate the impact they have on finding meaningful patterns.

Details

Applied Computing and Informatics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-1964

Keywords

Article
Publication date: 11 April 2023

Jeen Guo, Pengcheng Xiang, Qiqi Liu and Yun Luo

The purpose of this paper is to propose a method that can calculate the transportation infrastructure network service capacity enhancement given by planned transportation…

Abstract

Purpose

The purpose of this paper is to propose a method that can calculate the transportation infrastructure network service capacity enhancement given by planned transportation infrastructure projects construction. Managers can sequence projects more rationally to maximize the construction effectiveness of infrastructure investments.

Design/methodology/approach

This paper designed a computational network simulation software to generate topological networks based on established rules. Based on the topological networks, the software simulated the movement path of users and calculated the average travel time. This software allows the adjustment of parameters to suit different research objectives. The average travel time is used as an evaluation index to determine the most appropriate construction sequence.

Findings

In this paper, the transportation infrastructure network of Sichuan Province in China was used to demonstrate this software. The average travel time of the existing transportation network in Sichuan Province was calculated as 211 min using this software. The high-speed railways from Leshan to Xichang and from Xichang to Yibin had the greatest influence on shortening the average travel time. This paper also measured the changes in the average travel time under two strategies: shortening the maximum and minimum priorities. All the transportation network optimisation plans for Sichuan Province will be somewhere between these two strategies.

Originality/value

The contribution of this research are three aspects: First, a complex network analysis method that can take into account the differences of node elements is proposed. Second, it provides an effective tool for decision makers to plan transportation infrastructure construction. Third, the construction sequence of transportation infrastructure development plan can effect the infrastructure investment effectiveness.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 August 2023

M. Mary Victoria Florence and E. Priyadarshini

This study aims to propose the use of time series autoregressive integrated moving average (ARIMA) models to predict gas path performance in aero engines. The gas path is a…

82

Abstract

Purpose

This study aims to propose the use of time series autoregressive integrated moving average (ARIMA) models to predict gas path performance in aero engines. The gas path is a critical component of an aero engine and its performance is essential for safe and efficient operation of the engine.

Design/methodology/approach

The study analyzes a data set of gas path performance parameters obtained from a fleet of aero engines. The data is preprocessed and then fitted to ARIMA models to predict the future values of the gas path performance parameters. The performance of the ARIMA models is evaluated using various statistical metrics such as mean absolute error, mean squared error and root mean squared error. The results show that the ARIMA models can accurately predict the gas path performance parameters in aero engines.

Findings

The proposed methodology can be used for real-time monitoring and controlling the gas path performance parameters in aero engines, which can improve the safety and efficiency of the engines. Both the Box-Ljung test and the residual analysis were used to demonstrate that the models for both time series were adequate.

Research limitations/implications

To determine whether or not the two series were stationary, the Augmented Dickey–Fuller unit root test was used in this study. The first-order ARIMA models were selected based on the observed autocorrelation function and partial autocorrelation function.

Originality/value

Further, the authors find that the trend of predicted values and original values are similar and the error between them is small.

Details

Aircraft Engineering and Aerospace Technology, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 28 February 2023

Lin-Lin Xie, Yajiao Chen, Sisi Wu, Rui-Dong Chang and Yilong Han

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to…

Abstract

Purpose

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to focus on finding suitable algorithms to solve various scheduling problems and fail to find the potential scheduling rules in these optimal or near-optimal solutions, that is, the possible intrinsic relationships between attributes related to the scheduling of activity sequences. Data mining (DM) is used to analyze and interpret data to obtain valuable information stored in large-scale data. The goal of this paper is to use DM to discover scheduling concepts and obtain a set of rules that approximate effective solutions to resource-constrained project scheduling problems. These rules do not require any search and simulation, which have extremely low time complexity and support real-time decision-making to improve planning/scheduling.

Design/methodology/approach

The resource-constrained project scheduling problem can be described as scheduling a group of interrelated activities to optimize the project completion time and other objectives while satisfying the activity priority relationship and resource constraints. This paper proposes a new approach to solve the resource-constrained project scheduling problem by combining DM technology and the genetic algorithm (GA). More specifically, the GA is used to generate various optimal project scheduling schemes, after that C4.5 decision tree (DT) is adopted to obtain valuable knowledge from these schemes for further predicting and solving new scheduling problems.

Findings

In this study, the authors use GA and DM technology to analyze and extract knowledge from a large number of scheduling schemes, and determine the scheduling rule set to minimize the completion time. In order to verify the application effect of the proposed DT classification model, the J30, J60 and J120 datasets in PSPLIB are used to test the validity of the scheduling rules. The results show that DT can readily duplicate the excellent performance of GA for scheduling problems of different scales. In addition, the DT prediction model developed in this study is applied to a high-rise residential project consisting of 117 activities. The results show that compared with the completion time obtained by GA, the DT model can realize rapid adjustment of project scheduling problem to deal with the dynamic environment interference. In a word, the data-based approach is feasible, practical and effective. It not only captures the knowledge contained in the known optimal scheduling schemes, but also helps to provide a flexible scheduling decision-making approach for project implementation.

Originality/value

This paper proposes a novel knowledge-based project scheduling approach. In previous studies, intelligent optimization algorithm is often used to solve the project scheduling problem. However, although these intelligent optimization algorithms can generate a set of effective solutions for problem instances, they are unable to explain the process of decision-making, nor can they identify the characteristics of good scheduling decisions generated by the optimization process. Moreover, their calculation is slow and complex, which is not suitable for planning and scheduling complex projects. In this study, the set of effective solutions of problem instances is taken as the training dataset of DM algorithm, and the extracted scheduling rules can provide the prediction and solution of new scheduling problems. The proposed method focuses on identifying the key parameters of a specific dynamic scheduling environment, which can not only reproduces the scheduling performance of the original algorithm well, but also has the ability to make decisions quickly under the dynamic interference construction scenario. It is helpful for project managers to implement quick decisions in response to construction emergencies, which is of great practical significance for improving the flexibility and efficiency of construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 December 2023

Farshad Peiman, Mohammad Khalilzadeh, Nasser Shahsavari-Pour and Mehdi Ravanshadnia

Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the…

Abstract

Purpose

Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the accuracy and actualization of predicted values. This study primarily aimed to examine natural gradient boosting (NGBoost-2020) with the classification and regression trees (CART) base model (base learner). To the best of the authors' knowledge, this concept has never been applied to EVM AD forecasting problem. Consequently, the authors compared this method to the single K-nearest neighbor (KNN) method, the ensemble method of extreme gradient boosting (XGBoost-2016) with the CART base model and the optimal equation of EVM, the earned schedule (ES) equation with the performance factor equal to 1 (ES1). The paper also sought to determine the extent to which the World Bank's two legal factors affect countries and how the two legal causes of delay (related to institutional flaws) influence AD prediction models.

Design/methodology/approach

In this paper, data from 30 construction projects of various building types in Iran, Pakistan, India, Turkey, Malaysia and Nigeria (due to the high number of delayed projects and the detrimental effects of these delays in these countries) were used to develop three models. The target variable of the models was a dimensionless output, the ratio of estimated duration to completion (ETC(t)) to planned duration (PD). Furthermore, 426 tracking periods were used to build the three models, with 353 samples and 23 projects in the training set, 73 patterns (17% of the total) and six projects (21% of the total) in the testing set. Furthermore, 17 dimensionless input variables were used, including ten variables based on the main variables and performance indices of EVM and several other variables detailed in the study. The three models were subsequently created using Python and several GitHub-hosted codes.

Findings

For the testing set of the optimal model (NGBoost), the better percentage mean (better%) of the prediction error (based on projects with a lower error percentage) of the NGBoost compared to two KNN and ES1 single models, as well as the total mean absolute percentage error (MAPE) and mean lags (MeLa) (indicating model stability) were 100, 83.33, 5.62 and 3.17%, respectively. Notably, the total MAPE and MeLa for the NGBoost model testing set, which had ten EVM-based input variables, were 6.74 and 5.20%, respectively. The ensemble artificial intelligence (AI) models exhibited a much lower MAPE than ES1. Additionally, ES1 was less stable in prediction than NGBoost. The possibility of excessive and unusual MAPE and MeLa values occurred only in the two single models. However, on some data sets, ES1 outperformed AI models. NGBoost also outperformed other models, especially single models for most developing countries, and was more accurate than previously presented optimized models. In addition, sensitivity analysis was conducted on the NGBoost predicted outputs of 30 projects using the SHapley Additive exPlanations (SHAP) method. All variables demonstrated an effect on ETC(t)/PD. The results revealed that the most influential input variables in order of importance were actual time (AT) to PD, regulatory quality (RQ), earned duration (ED) to PD, schedule cost index (SCI), planned complete percentage, rule of law (RL), actual complete percentage (ACP) and ETC(t) of the ES optimal equation to PD. The probabilistic hybrid model was selected based on the outputs predicted by the NGBoost and XGBoost models and the MAPE values from three AI models. The 95% prediction interval of the NGBoost–XGBoost model revealed that 96.10 and 98.60% of the actual output values of the testing and training sets are within this interval, respectively.

Research limitations/implications

Due to the use of projects performed in different countries, it was not possible to distribute the questionnaire to the managers and stakeholders of 30 projects in six developing countries. Due to the low number of EVM-based projects in various references, it was unfeasible to utilize other types of projects. Future prospects include evaluating the accuracy and stability of NGBoost for timely and non-fluctuating projects (mostly in developed countries), considering a greater number of legal/institutional variables as input, using legal/institutional/internal/inflation inputs for complex projects with extremely high uncertainty (such as bridge and road construction) and integrating these inputs and NGBoost with new technologies (such as blockchain, radio frequency identification (RFID) systems, building information modeling (BIM) and Internet of things (IoT)).

Practical implications

The legal/intuitive recommendations made to governments are strict control of prices, adequate supervision, removal of additional rules, removal of unfair regulations, clarification of the future trend of a law change, strict monitoring of property rights, simplification of the processes for obtaining permits and elimination of unnecessary changes particularly in developing countries and at the onset of irregular projects with limited information and numerous uncertainties. Furthermore, the managers and stakeholders of this group of projects were informed of the significance of seven construction variables (institutional/legal external risks, internal factors and inflation) at an early stage, using time series (dynamic) models to predict AD, accurate calculation of progress percentage variables, the effectiveness of building type in non-residential projects, regular updating inflation during implementation, effectiveness of employer type in the early stage of public projects in addition to the late stage of private projects, and allocating reserve duration (buffer) in order to respond to institutional/legal risks.

Originality/value

Ensemble methods were optimized in 70% of references. To the authors' knowledge, NGBoost from the set of ensemble methods was not used to estimate construction project duration and delays. NGBoost is an effective method for considering uncertainties in irregular projects and is often implemented in developing countries. Furthermore, AD estimation models do fail to incorporate RQ and RL from the World Bank's worldwide governance indicators (WGI) as risk-based inputs. In addition, the various WGI, EVM and inflation variables are not combined with substantial degrees of delay institutional risks as inputs. Consequently, due to the existence of critical and complex risks in different countries, it is vital to consider legal and institutional factors. This is especially recommended if an in-depth, accurate and reality-based method like SHAP is used for analysis.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 March 2024

Lisa H. Rosen, Linda J. Rubin, Savannah Dali, Daisie M. Llanes, Ahissa Lopez, Ashton E. Romines and Samantha A. Saunders

The COVID-19 pandemic dramatically altered daily life for Gen Z. The purpose of this study was to examine parental perceptions of the pandemic’s effects on their children’s peer…

Abstract

Purpose

The COVID-19 pandemic dramatically altered daily life for Gen Z. The purpose of this study was to examine parental perceptions of the pandemic’s effects on their children’s peer relationships. As children sought peer connection during the pandemic, technology usage soared. The second purpose of the current study was to assess how greater time on social media affected adjustment among Gen Z and whether this effect was mediated by experiences of cyber victimization.

Design/methodology/approach

In total, 250 U.S. parent-child dyads participated in the study. Parents reported on their children’s social media use and described how they believed the pandemic affected their children’s peer relationships. Child participants were transitioning to middle school and reported on cyber victimization and adjustment.

Findings

Thematic analysis of parental reflections revealed three themes: children spent more time online since the onset of the pandemic, there were negative implications of increased time online and there were positive and protective implications of being online. Analysis also indicated significant indirect effects of social media use on internalizing and externalizing problems through victimization.

Originality/value

Parents reported Gen Z continues to use electronic forms of communication and social media at high rates even after pandemic-related restrictions eased with some suggesting that their children prefer digital over face-to-face communication because they have become accustomed to this way of connecting and may find it easier than in-person interaction. Current findings highlight concerns about this increased time online as social media use negatively affected adjustment via cyber victimization.

Details

Young Consumers, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1747-3616

Keywords

Article
Publication date: 20 December 2022

Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…

Abstract

Purpose

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.

Design/methodology/approach

A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.

Findings

The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.

Originality/value

Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 June 2022

Suvarna Abhijit Patil and Prasad Kishor Gokhale

With the advent of AI-federated technologies, it is feasible to perform complex tasks in industrial Internet of Things (IIoT) environment by enhancing throughput of the network…

Abstract

Purpose

With the advent of AI-federated technologies, it is feasible to perform complex tasks in industrial Internet of Things (IIoT) environment by enhancing throughput of the network and by reducing the latency of transmitted data. The communications in IIoT and Industry 4.0 requires handshaking of multiple technologies for supporting heterogeneous networks and diverse protocols. IIoT applications may gather and analyse sensor data, allowing operators to monitor and manage production systems, resulting in considerable performance gains in automated processes. All IIoT applications are responsible for generating a vast set of data based on diverse characteristics. To obtain an optimum throughput in an IIoT environment requires efficiently processing of IIoT applications over communication channels. Because computing resources in the IIoT are limited, equitable resource allocation with the least amount of delay is the need of the IIoT applications. Although some existing scheduling strategies address delay concerns, faster transmission of data and optimal throughput should also be addressed along with the handling of transmission delay. Hence, this study aims to focus on a fair mechanism to handle throughput, transmission delay and faster transmission of data. The proposed work provides a link-scheduling algorithm termed as delay-aware resource allocation that allocates computing resources to computational-sensitive tasks by reducing overall latency and by increasing the overall throughput of the network. First of all, a multi-hop delay model is developed with multistep delay prediction using AI-federated neural network long–short-term memory (LSTM), which serves as a foundation for future design. Then, link-scheduling algorithm is designed for data routing in an efficient manner. The extensive experimental results reveal that the average end-to-end delay by considering processing, propagation, queueing and transmission delays is minimized with the proposed strategy. Experiments show that advances in machine learning have led to developing a smart, collaborative link scheduling algorithm for fairness-driven resource allocation with minimal delay and optimal throughput. The prediction performance of AI-federated LSTM is compared with the existing approaches and it outperforms over other techniques by achieving 98.2% accuracy.

Design/methodology/approach

With an increase of IoT devices, the demand for more IoT gateways has increased, which increases the cost of network infrastructure. As a result, the proposed system uses low-cost intermediate gateways in this study. Each gateway may use a different communication technology for data transmission within an IoT network. As a result, gateways are heterogeneous, with hardware support limited to the technologies associated with the wireless sensor networks. Data communication fairness at each gateway is achieved in an IoT network by considering dynamic IoT traffic and link-scheduling problems to achieve effective resource allocation in an IoT network. The two-phased solution is provided to solve these problems for improved data communication in heterogeneous networks achieving fairness. In the first phase, traffic is predicted using the LSTM network model to predict the dynamic traffic. In the second phase, efficient link selection per technology and link scheduling are achieved based on predicted load, the distance between gateways, link capacity and time required as per different technologies supported such as Bluetooth, Wi-Fi and Zigbee. It enhances data transmission fairness for all gateways, resulting in more data transmission achieving maximum throughput. Our proposed approach outperforms by achieving maximum network throughput, and less packet delay is demonstrated using simulation.

Findings

Our proposed approach outperforms by achieving maximum network throughput, and less packet delay is demonstrated using simulation. It also shows that AI- and IoT-federated devices can communicate seamlessly over IoT networks in Industry 4.0.

Originality/value

The concept is a part of the original research work and can be adopted by Industry 4.0 for easy and seamless connectivity of AI and IoT-federated devices.

Details

International Journal of Pervasive Computing and Communications, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1742-7371

Keywords

Article
Publication date: 14 April 2023

Obinna Chimezie Madubuike, Chinemelu J. Anumba and Evangelia Agapaki

This paper aims to focus on identifying key health-care issues amenable to digital twin (DT) approach. It starts with a description of the concept and enabling technologies of a…

Abstract

Purpose

This paper aims to focus on identifying key health-care issues amenable to digital twin (DT) approach. It starts with a description of the concept and enabling technologies of a DT and then discusses potential applications of DT solutions in healthcare facilities management (FM) using four different scenarios. The scenario planning focused on monitoring and controlling the heating, ventilation, and air-conditioning system in real-time; monitoring indoor air quality (IAQ) to monitor the performance of medical equipment; monitoring and tracking pulsed light for SARS-Cov-2; and monitoring the performance of medical equipment affected by radio frequency interference (RFI).

Design/methodology/approach

The importance of a healthcare facility, its systems and equipment necessitates an effective FM practice. However, the FM practices adopted have several areas for improvement, including the lack of effective real-time updates on performance status, asset tracking, bi-directional coordination of changes in the physical facilities and the computational resources that support and monitor them. Consequently, there is a need for more intelligent and holistic FM systems. We propose a DT which possesses the key features, such as real-time updates and bi-directional coordination, which can address the shortcomings in healthcare FM. DT represents a virtual model of a physical component and replicates the physical data and behavior in all instances. The replication is attained using sensors to obtain data from the physical component and replicating the physical component's behavior through data analysis and simulation. This paper focused on identifying key healthcare issues amenable to DT approach. It starts with a description of the concept and enabling technologies of a DT and then discusses potential applications of DT solutions in healthcare FM using four different scenarios.

Findings

The scenarios were validated by industry experts and concluded that the scenarios offer significant potential benefits for the deployment of DT in healthcare FM such as monitoring facilities’ performance in real-time and improving visualization by integrating the 3D model.

Research limitations/implications

In addition to inadequate literature addressing healthcare FM, the study was also limited to one of the healthcare facilities of a large public university, and the scope of the study was limited to IAQ including pressure, relative humidity, carbon dioxide and temperature. Additionally, the study showed the potential benefits of DT application in healthcare FM using various scenarios that DT experts validated.

Practical implications

The study shows the practical implication using the various validated scenarios and identified enabling technologies. The combination and implementation of those mentioned above would create a system that can effectively help manage facilities and improve facilities' performances.

Social implications

The only identifiable social solution is that the proposed system in this study can manually be overridden to prevent absolute autonomous control of the smart system in cases when needed.

Originality/value

To the best of the authors’ knowledge, this is the only study that has addressed healthcare FM using the DT approach. This research is an excerpt from an ongoing dissertation.