Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 1 September 2022

Oluseyi Julius Adebowale and Justus Ngala Agumba

Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of…

4012

Abstract

Purpose

Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of productivity growth. The need for improvements inspired the industry's stakeholders to consider using emerging technologies that support the enhancement. This research aims to report augmented reality applications essential for contractors' productivity improvement.

Design/methodology/approach

This study systematically reviewed academic journals. The selection of journal articles entailed searching Scopus and Web of Science databases. Relevant articles for reviews were identified and screened. Content analysis was used to classify key applications into six categories. The research results were limited to journal articles published between 2010 and 2021.

Findings

Augmented reality can improve construction productivity through its applications in assembly, training and education, monitoring and controlling, interdisciplinary function, health and safety and design information.

Originality/value

The research provides a direction for contractors on key augmented reality applications they can leverage to improve their organisations' productivity.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

Jamiu A. Dauda, Saheed Ajayi, Temitope Omotayo, Olayiwola O. Oladiran and Olusegun M. Ilori

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This…

Abstract

Purpose

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This study evaluated the current operations of selected SMEs providing engineering design and consultancy services against Toyota Production System (TPS) lean tool. The purpose is to juxtapose SME operations and processes with TPS to ascertain the level of their operations conformity to the established TPS lean thinking tool.

Design/methodology/approach

This study used a qualitative data collection and analysis approach to evaluate the current processes of participating SMEs against Liker's 14 management principles of TPS. The data collected were analysed using thematic analysis to identify patterns and themes that emerged from the qualitative data.

Findings

The analysis revealed that focus on short-term goals, immediate profit and duplication of effort resulting from insufficient collaboration is currently creating waste in participating SMEs' operations. Hence, the implementation of TPS was recommended as a lean tool and a framework based on TPS lean tool was developed for improving the operations of SMEs.

Research limitations/implications

The study is limited to SMEs operating only as consultants providing project planning design within the construction industry. Data collection is limited to qualitative even though observations would improve the outcome of the study.

Originality/value

The study advances contemporary issues in promoting lean implementation in construction sector and developed an improved framework based on the TPS to enhance the performance of SME construction businesses.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Abstract

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3351

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 30