Search results

1 – 10 of 21
Case study
Publication date: 20 September 2023

Arvind Sahay

Sai Coating, a small entrepreneurial firm, was one of the three firms that had received the license from ARCI for marketing the Detonation Spray Coating (DSC). Sai Coating made…

Abstract

Sai Coating, a small entrepreneurial firm, was one of the three firms that had received the license from ARCI for marketing the Detonation Spray Coating (DSC). Sai Coating made and sold the detonation gun (D-Gun) to three sectors, namely: Wire Drawing, Textiles and Aero components. The coating enhanced the life of the coated wire or surface and its functionality in some ways. The firm had a turnover of INR 4,500,000 and was looking to generate scale and maximize its revenues. The case revolves around the pricing strategy to be adopted by Sai coating to extract value from different set of customers. What should be the price levels given the nature of the product?

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 6 December 2023

Sundaravalli Narayanaswami and N Ravichandran

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college…

Abstract

Jarsh Safety received an order of 500 units of its Model S helmet. However, the order must be delivered within 15 days. Jarsh Safety was founded by three engineering college peers, who conceptualized air-conditioned, industrial safety helmets. This innovative revolutionary product offered industrial workers not only safety but aesthetics and comfort. The founders hoped that the product could change the perception of safety helmets from mandatory wear to desired wear. The case details the production process, staffing, raw material required and procurement lead time.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 18 November 2009

Tathagata Bandyopadhyay, G. Raghuram, Yashoverman Sharma and Niraja Shukla

Kolkata Port (KoPT) had achieved a turnaround from having made a loss of Rs 7.5 crores (cr) in the year 2000–01 to a net surplus of Rs 465.1 cr in the year 2006–07. A variety of…

Abstract

Kolkata Port (KoPT) had achieved a turnaround from having made a loss of Rs 7.5 crores (cr) in the year 2000–01 to a net surplus of Rs 465.1 cr in the year 2006–07. A variety of initiatives had been taken during the intervening years with a focus on tariff rationalization, revenues from alternate sources, infrastructure development and productivity improvements. While these had yielded results, there was a fundamental issue of operational complexity and inability to compete due to the locational disadvantage. KoPT was a riverine port with two locations, 232 kms and 115 kms upstream on the Hooghly with draft limitations.

Two significant studies having implications for future strategies of KoPT had recently been submitted in March and November 2007. The top management of the port, including the Chairman who was responsible for driving many of the initiatives, was concerned that it may not be possible to achieve long term sustainable growth continuing with the strategies used so far. A well thought out future roadmap, breaking away from the present thinking, was essential sustained growth.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 1 July 2011

Satish K. Nair

strategic alliances/collaborative strategies;defending against global competitors;related diversification;entrepreneurship-organizational life cycle; andevaluating strategies for…

Abstract

Subject area

strategic alliances/collaborative strategies;

defending against global competitors;

related diversification;

entrepreneurship-organizational life cycle; and

evaluating strategies for firm growth.

Study level/applicability

MBA/PGP level programmes in management and/or entrepreneurship.

Case overview

Aztec Fluids & Machinery, set up just over four years ago in the city of Ahmedabad in Gujarat, India, caters to the printer hardware, spares and consumables needs of the digital ink jet printing market. The company has identified vendors principally from the UK and China for its printers and consumable sourcing and presently markets these using a hybrid channel structure of direct selling and through 12 distributors in ten cities of India. A recent development of note is the successful transformation of a flexible roll printer into a flat-bed type one by the co-founder. The experiment assumes significance since the cost of a conventional flat-bed screen printer is almost five times that of the improvised printer. The huge, fragmented, price-sensitive, yet quality-conscious market in India offers immense potential for this innovation. At the same time, Aztec's recent interactions with a couple of its UK-based vendors present other alternatives for growth.

Expected learning outcomes

To explore organizational life cycle: the introduction and early growth phases.

To understand alliance dynamics for early-stage entrepreneurs –rationale, management and the manifestation of trust between different types of partners: suppliers and customers.

To understand how small firms prepare for and evaluate the challenges of growth.

Supplementary materials

Teaching note.

Details

Emerald Emerging Markets Case Studies, vol. 1 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Abstract

Study level/applicability

MS / MBA / Executive Education

Subject area

Leadership

Case overview

In 2019, French multinational electric utility company, ENGIE SA (ENGIE) was on the verge of zero carbon transition. Under the leadership of Isabelle Kocher (Kocher) who became the CEO in 2016, ENGIE embarked on an arduous journey toward re-profiling ENGIE toward renewable, low-carbon energies, such as solar, green gases and digital. Kocher inherited a loss-making company and took in on a path of transformation toward a company with business lines for future. This meant ENGIE would slowly move out of energy generation through non-renewable sources, toward renewables along with storage and digital technologies. This case chronicles Kocher’s turnaround plans and investments, and explains how she went about making ENGIE a forerunner in energy revolution. While the turnaround was on track, ENGIE was unable to give returns as expected. With mounting pressure Kocher announced a strategic plan in 2019, which reemphasized ENGIE’s focus on renewables and technology. But several major shareholders including the Government of France were not impressed with the plan. It is time Kocher proves that transformation of ENGIE into a clean power company also means returns for the shareholders.

Expected learning outcomes

The outcomes are as follows: First, to illustrate how leaders bring in change and innovation in large well-established companies. It shows the role of leaders in leading the innovation process and in molding the companies according to the opportunities and threats presented by the macro environment. Second, to analyze the role of a leader in bringing changes in the organization. Third, to understand the strategies used by energy companies as they position their businesses in the context of a changing energy landscape.

Supplementary materials

Teaching Note

Social implications

Renewable Energy – Growing cocnern about the impact of climate change on the world at large, has brought to the fore the importance of renewable energy.

Subject code

CSS 4: Environmental management

Details

The Case For Women, vol. no.
Type: Case Study
ISSN: 2732-4443

Keywords

Case study
Publication date: 28 March 2018

Amit Garg, Kiran Medicherla, Arushi Jamar and Shrey Agrawal

Solar energy is on a rising trend internationally and in India. The government target of 100 GW solar capacity by 2022 from the present 12 GW is providing a major push for growth…

Abstract

Solar energy is on a rising trend internationally and in India. The government target of 100 GW solar capacity by 2022 from the present 12 GW is providing a major push for growth in India. However technological development and market competitiveness are pushing down the prices of solar power. The CEO of Amplus Solar has to deal with these challenges to ensure faster growth. He is analysing various options such as expanding the market to include customers who may not be as credit worthy, expanding to foreign geographies, diversification into providing energy efficiency and other services, and entering other markets such as Renewable Energy Certificates, carbon trading, etc.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 23 May 2019

Hemant Manuj

The purpose of this paper is to illustrate how a well-performing company can turn into a loss-making company on account of adverse industry cycle and poor management of risks in…

Abstract

Learning outcomes

The purpose of this paper is to illustrate how a well-performing company can turn into a loss-making company on account of adverse industry cycle and poor management of risks in the business. The importance of factors like optimal level of leveraging, the ability of the management to deal with external and internal risks, and importance of corporate governance in the process of credit appraisal is understood from this case.

Case overview/synopsis

The case relates to the credit appraisal by the banks of a prominent steel company in India. The company, Bhushan Steel Limited, was doing very well. The banks lent aggressively to the company, based on their credit appraisal. However, the company soon turned insolvent on account of poor assessment of risks and deteriorating external factors. While this case may be analysed and studied through the eyes of both the Management and the lenders, the focus is currently on the latter. In a real-world scenario, the challenge for the lender is to sieve through the financial as well as non-financial data and make a valid conclusion on the level of credit worthiness of the borrowing company. This includes the topics of operational efficiency and synergies, commodity price cycles, external credit ratings, operating and financial leverage, regulatory risks and corporate governance.

Complexity academic level

Post graduate business management programmes – Finance specialisation.

Supplementary materials

Teaching Notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Subject code

CSS 1: Accounting and Finance

Case study
Publication date: 22 May 2021

Ashutosh Dash

The learning outcomes of this paper is as follows: to review the basic differences between the two evolving bonds, i.e. green vs masala bonds in the Indian capital market; to…

Abstract

Learning outcomes

The learning outcomes of this paper is as follows: to review the basic differences between the two evolving bonds, i.e. green vs masala bonds in the Indian capital market; to comprehend the factors that need to be considered in deciding the type of bond to be issued; to assess complexities, such as process, timing, risk and location in relation to the issue of the green bonds; and to understanding the rudiments of bond economics, such as pricing, all-in-cost and yield-to-maturity of bonds and make a comparison of all-in-cost of the Reg-S bond and green bond to Indian Railway Finance Corporation (IRFC).

Case overview/synopsis

In September 2017, IRFC, a public sector undertaking registered as a Non-Banking Finance Company with Reserve Bank of India under the administrative control of the Ministry of Railways, was planning to raise US$500m 10-year green bonds from investors in Asia, Europe and the Middle East. The green bond proceeds were proposed to be used for low carbon transport and in this way, contribute significantly to the green initiatives of the Indian Railways. Many companies in India had issued regular bonds without labeling them as green but had used the proceeds of the bond for climate-aligned assets. Therefore, a bigger challenge before the IRFC management was the economics of green bond for getting a nod from the Board of Governors to go ahead. Some preliminary estimates on cost of green bonds were received from few bankers but to see that the terms of green bonds are met eventually, the Director (Finance) developed his own estimate of the cost of the new bonds. The Managing Director and Director (Finance) of IRFC were trying to figure out the economic advantage of green bonds besides its social benefits.

Complexity academic level

MBA Programme Executive Training.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 1
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 18 May 2011

G Raghuram and Pranav Mehta

It was December 13, 2010. The Government of Uttar Pradesh announced their plan to urbanize the entire area along the Yamuna Expressway (YE) in order to prevent haphazard growth of…

Abstract

It was December 13, 2010. The Government of Uttar Pradesh announced their plan to urbanize the entire area along the Yamuna Expressway (YE) in order to prevent haphazard growth of urban sprawls on the flanks of the YE. The YE was conceived in 1997 as a dream project of Ms Mayawati, the then Chief Minister of Uttar Pradesh, with the idea of reducing the travel time between Delhi (and the larger National Capital Region) and Agra. It was a 165 km long expressway and was proposed to run from Greater Noida to Agra via Mathura. Amidst issues concerning land acquisition, and various protests and litigations, the deadline for completion of the project had extended beyond its original completion date of February 8, 2010 to April 2013. Meanwhile, the project cost had escalated from Rs 2500 crore (cr) in the year 2000 to about Rs 10,000 cr as of December 2010. By then, about 80% work on the expressway had been completed. The project was finally expected to be completed around April 2011. This was, however, subject to the pending court judgements and mitigation of risks as perceived by Jaypee Infratech, the concessionaire of the project.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

1 – 10 of 21