Search results

1 – 10 of 690
Content available
Article
Publication date: 14 December 2020

Darren Fraser, Thando Mpikeleli and Theo Notteboom

Increased economic activity in sub-Saharan Africa (SSA) has given rise to increased demand for port development. Given the often scarce availability of national public funding…

3229

Abstract

Purpose

Increased economic activity in sub-Saharan Africa (SSA) has given rise to increased demand for port development. Given the often scarce availability of national public funding, port institutional reform programmes have been implemented to pave the way for the inclusion of external port investors. Notwithstanding this fact, some sub-Saharan African Governments remain institutionally locked into the notion that state-owned enterprises remain an appropriate vehicle for port terminal operations. This, despite the fact that terminal operational concessions globally and within the continent of Africa are increasingly being managed by global terminal operators. Given this context, this study aims to evaluate different port valuation and funding strategies. Two research questions form the core of this research: what is the financial value of a concession? What is the most cost advantageous funding strategy? The methodology is applied to the development of a two-berth container terminal in SSA.

Design/methodology/approach

After reviewing a range of financial valuation and funding techniques, the study presents valuation and funding model applicability-fit tests. Thereafter, a suitable valuation technique is selected and applied to the case study providing a concession valuation. Different funding strategies are applied to the valuation model to determine the cost implications of each funding instrument given the local context and institutional constraints applicable to SSA. Finally, the study discusses the significance of the results to potential SSA port investors by highlighting the impact of each funding approach on key financial metrics.

Findings

The study presents a range of financial investment appraisal results for the case study concession in consideration of four specific funding strategies. The highest concession valuation could be attributed to a higher debt ratio as a principal funding strategy. In addition, this funding approach (100% debt) realised the shortest payback period and the highest internal rate of return values. The authors, however, maintain that the optimal funding strategy for a concession depends ultimately on the financial goals of the investor.

Originality/value

This research makes a contribution to the existing literature on port finance and development by presenting a structured approach to the evaluation of the valuation and funding techniques, which can be used in terminal development subject to the specific local context and institutional constraints (in this case applicable to SSA). The study provides practical insight into the potential cost of the considered terminal concession for private or public sector participants and a view of the most cost advantageous funding strategy available for interested investors.

Details

Maritime Business Review, vol. 6 no. 2
Type: Research Article
ISSN: 2397-3757

Keywords

Open Access
Article
Publication date: 30 June 2010

Christophe Theys and Theo Notteboom

The awarding of terminals to private operators is considered a prime task of landlord port authorities. Yet, terminal concessions in seaports have only recently gained interest in…

Abstract

The awarding of terminals to private operators is considered a prime task of landlord port authorities. Yet, terminal concessions in seaports have only recently gained interest in academic circles. The awarding process poses a complex set of managerial challenges to port authorities, one of the key issues being the determination of the duration of the concession.

Despite the importance of the duration of terminal concessions in seaports, the issue has not received much attention in academic circles. Factors impacting on the duration of contracts, leases or concessions have, however, been studied extensively in other research areas, such as agriculture, coal contracts, franchising and natural gas. This paper uses insights from these academic studies to obtain a better understanding of the impact of concession duration on the stakeholders involved and relates them to empirical evidence on concession length in European seaports. The paper then proposes a classification scheme for the exogenous determination of concession duration, based on techniques developed for Public-Private-Partnerships in large infrastructure projects. In the last section the paper discusses the importance of concession durations to various stakeholders in seaports and illustrates these principles using a case study.

Details

Journal of International Logistics and Trade, vol. 8 no. 1
Type: Research Article
ISSN: 1738-2122

Keywords

Article
Publication date: 20 November 2017

Solomon Olusola Babatunde and Srinath Perera

Although scientific research community has shown considerable interest in identifying critical success factors (CSFs) for public-private partnership (PPP) projects, yet effort at…

Abstract

Purpose

Although scientific research community has shown considerable interest in identifying critical success factors (CSFs) for public-private partnership (PPP) projects, yet effort at assessing and compare CSFs within similar PPP infrastructure projects received scant attention. The purpose of this paper is to identify, assess, and compare the CSFs in PPP transport infrastructure projects.

Design/methodology/approach

The study adopted literature review and three PPP case studies including structured interviews and review of documentary reports in each case study. The outcome of literature review provided a total list of 26 identified success factors, which was used to design a case study protocol using failure mode and effect analysis (FMEA) technique. FMEA was conducted on each 26 identified success factor to assess their criticality in the three PPP case studies.

Findings

The results of FMEA revealed a total of ten CSFs in the concession of the road; four CSFs in the concession of the airport; and eight CSFs in the concession of the seaport. Also, the cross-case analysis showed the three prevalent CSFs, this includes government involvement by providing guarantees, political support, and project economic viability.

Practical implications

The study findings including lessons learnt in each case study would positively influence policy development towards PPP transport infrastructure projects and the manner in which partners (i.e. public and private sector) go about the development of PPP transport projects.

Originality/value

This research would help PPP stakeholders to focus their attention and priorities in managing the identified CSFs in achieving long-term success in PPP transport infrastructure projects implementation.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 July 2016

Akintayo Opawole and Godwin Onajite Jagboro

Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and…

Abstract

Purpose

Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and economic factors that contribute to the parties’ costs while preparing contract packages. The purpose of this paper is to assess the factors which significantly influence the private party’s obligations and costs in a concession-based contract thereby enhancing the robust assessment of contract packages when bidding by private investors.

Design/methodology/approach

The assessment was based on primary data obtained through questionnaire survey. Structured questionnaire was administered on professionals comprising architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers who had been involved in concession-based contracts in the Southwestern Nigeria, selected using respondent-driven sampling approach. Factors evaluated were those identified through in-depth literature review and brainstorming of those pertinent to concession transaction in Nigeria. Data collected were analysed using descriptive statistics including mean, relative significance index, impact weighting and factor analysis.

Findings

Significant factors that influence private party’s cost were found to be political interference, delay in land acquisition, variation to the contract and non-availability of supportive infrastructure.

Originality/value

Findings provided information for structuring concession contract for effective management of country-specific characteristics in concession contract. The understanding of the factors that affect private party’s obligations and costs would guide effective assessment of concession contract in developing economies by foreign investors. Moreover, the study provided implication for the understating of country-specific factors affecting concession contract in Nigeria which would contribute to robust assessment of contract packages when bidding by private investors.

Details

Structural Survey, vol. 34 no. 3
Type: Research Article
ISSN: 0263-080X

Keywords

Book part
Publication date: 12 September 2017

Tiziana D’Alfonso and Valentina Bracaglia

Airport economics literature has recently included the supply of concession services among the factors that might affect airport pricing. In particular, there is only little…

Abstract

Airport economics literature has recently included the supply of concession services among the factors that might affect airport pricing. In particular, there is only little empirical analysis on whether: (i) the supply of airport concession services can stimulate the demand for travel (two-side complementarity) and (ii) the demand for airport concession services is independent of traveling activities (welfare neutrality). In this chapter, we survey papers that have addressed two-side complementarity and welfare neutrality in airport concessions. Our goal is to discuss the different assumptions that have shaped the models and to collect evidences, facts and empirical findings that may support analytical hypotheses. We argue that the notions of two-side complementarity and welfare neutrality might be interrelated – especially when airports invest in concessions in the area accessible to non-passengers. Welfare gains should be assessed on a case by case basis, depending on the type of airport in terms of ownership, size (and the relative mass of connecting passengers compared to origin–destination passengers), and the source of concession revenues. Our arguments might be particularly relevant to policy makers who need to understand (i) whether the supply of concessions reduces or increases the benefits of airport (aviation) price regulation and (ii) whether the effective control of market power may require the regulation of the prices of both the businesses.

Details

The Economics of Airport Operations
Type: Book
ISBN: 978-1-78714-497-2

Keywords

Article
Publication date: 5 February 2018

Akintayo Opawole

The purpose of this study is to develop penalty measures against concessionaires’ defaults as a mechanism for protecting the interests of parties (public and private) in…

Abstract

Purpose

The purpose of this study is to develop penalty measures against concessionaires’ defaults as a mechanism for protecting the interests of parties (public and private) in public–private partnership (PPP) contracts for enhancing project delivery.

Design/methodology/approach

The research methodology is a mixed qualitative and quantitative approach. This study commenced with an in-depth literature review, which provided the basis for identification of penalty measures in construction contract management. The qualitative assessment was based on semi-structured face-to-face interviews, which were aimed at identifying the underlying pattern of the penalty measures, and the quantitative assessment was based on a structured questionnaire. In both cases, respondents were stakeholders’ organizations that had been involved in PPP contracts in the southwestern region of Nigeria. These include industrial practitioners from government-based organizations (ministries, agencies, corporations/parastatals, etc.), private developers/concessionaires, law firms, banks, etc. The sample size was selected using a respondent-driven sampling approach, as the comprehensive lists of the participants in PPP contracts are not readily available in the Nigerian construction industry. Responses from the interview were analysed using interpretative phenomenal analysis via ATLAS.ti7. The quantitative data were analysed using percentile for flexibility between “most” and “more” preferred mechanisms.

Findings

This study developed mechanisms that defined the rights of the public party to redress underperformance of PPP contracts consequent to the defaults of the private party. “Step-in-right” and “termination of the contracts” were preferred against specific cases of “delayed execution”, “abandonment of the project”, “bankruptcy of the concessionaire” and “non-compliance with design and specifications”. With respect to “shortfall in performance against established dates”, the results converged on “monetary fine” and diverged on “step-in-right” and “termination of the contracts”.

Practical implications

The study contributes to literature on mechanisms for enforcing PPP project performance. Besides, defining rights and obligations of the parties in specific events of underperformance of the concessionaires in PPP contracts is a significant step towards the development of standard conditions of contract for managing PPP projects in which the model is being newly adopted.

Originality/value

Project management studies on PPP were extended by defining the liabilities that are consequent to the defaults of the private party and the mechanisms for their enforcement.

Details

Journal of Engineering, Design and Technology, vol. 16 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 March 2016

Akintayo Opawole and Godwin Onajite Jagboro

Demand–supply matrices with adverse consequences has occasioned government response to concession initiatives in infrastructure in Nigeria. However, concession-based projects have…

Abstract

Purpose

Demand–supply matrices with adverse consequences has occasioned government response to concession initiatives in infrastructure in Nigeria. However, concession-based projects have been trailed by administrative and legal controversies. While this scenario has negatively impacted the acceptability of a concession contract, there is, nevertheless, a paucity of research effort aimed at developing a sustainable framework. The purpose of this paper is to develop a conceptual framework for the evaluation and allocation of obligations of parties, thereby enhancing the synergy and cooperation between the public and private sector organization.

Design/methodology/approach

Data were obtained through a questionnaire administered to professionals in concession-based contracts in southwestern Nigeria, which included architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers. The respondents were selected using random and respondent driven sampling approaches. The questions were structured to ensure that the respondents have appropriate experience in concession-based projects and hold appropriate positions as decision-makers so as to give credence to the collected data.

Findings

The study identified 47 contractual obligations in the specific context of developing countries. Based on “half-adjusting principle”, 13 of the obligations notably cost of land acquisition and cost of social disturbances were allocated to the public party; 18 of the obligations notably project design and cost of feasibility study were allocated to the private party; and 16 of the obligations including preparation of terms of a contract and relocation of third party facilities were shared by the parties.

Originality/value

The framework benchmarked the categorization of public and private parties’ obligations in concession-based public–private partnership (PPP) contracts. The study has the implication for the evaluation and allocation of obligations of parties, which could mitigate the risk of failure of PPP projects in relation to the specific context of developing countries.

Details

Journal of Place Management and Development, vol. 9 no. 1
Type: Research Article
ISSN: 1753-8335

Keywords

Book part
Publication date: 6 December 2017

Emelly Mutambatsere

This chapter uses data from the World Bank’s Private Participation in Infrastructure project database, and hand-collected evidence on project performance, to examine how PPPs are…

Abstract

This chapter uses data from the World Bank’s Private Participation in Infrastructure project database, and hand-collected evidence on project performance, to examine how PPPs are applied to infrastructure development in Africa, and how well they have delivered expected benefits. It has two analytical parts: an investment trend analysis and a meta-analysis of project performance and explanatory factors. The analysis shows growth both in number and volume of PPP investments that is weaker than that observed in other developing regions, and more volatile. The performance of PPP contracts appears to be improving over time with an overall cancelation rate of 7% over the assessment period. Although PPPs have contributed to increasing infrastructure stock, they have not completely met their potential, especially with respect to increasing infrastructure access rates. The main determinants of performance include accuracy of costing and allocation of risks, consistency of macro policies with the objectives and functioning of PPPs, coherence of sector policies and plans and local capacity. Contract cancellations are mainly explained by the misalignment of outcomes with government objectives, in particular, access and investment objectives. These findings suggest that PPP application should be well planned to ensure coherence of a wide range of policies, readiness of institutions and capacity of public sector actors. This chapter contributes to closing information gaps on a relatively novel policy instrument, and provides useful evidence to support prudent policy making at the time of considerable growth in PPP application.

Details

The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies
Type: Book
ISBN: 978-1-78714-494-1

Keywords

Content available
Article
Publication date: 18 January 2024

Stefania Kollia and Athanasios A. Pallis

Container liner shipping companies started expanding their business by investing in container port terminals in the late 1990s. This market entry results in an extensive presence…

Abstract

Purpose

Container liner shipping companies started expanding their business by investing in container port terminals in the late 1990s. This market entry results in an extensive presence of vertically integrated liners and terminals. This study aims to explore the competition effects of this vertical integration trend based on a regional (European) analysis. In particular, it extracts lessons from the European Commission (EC) cases on the competition effects of vertical integration. The critical analysis of the cases examined at the institutional level intends to reach conclusions on whether liner–terminal vertical integration harmed or advanced competition in the relevant markets and/or the extent that there is a need to revise the current policy practices.

Design/methodology/approach

This study critically assesses the EC’s decisional practices in port container terminal vertical mergers in the last 25 years (1997–2021). Based on a literature review comparing maritime and competition economists' perspectives, it reviews the types of mergers examined, the methodology followed for relevant market definition and calculation of market shares and the estimated competition effects. The Hamburg–Le Havre area is the port range used as a case study for comparing the decisional practice with actual market developments. These container ports serve the greatest consuming market of final and intermediate goods in Europe and are gateways to Central and Eastern Europe.

Findings

The assessment identifies a need for expanding the investigation as a precondition for reaching conclusions on both the anti- and pro-competitive effects. First, only a limited number of transactions have been notified to the EC. Second, the empirical research identified a gap in this process, as there were no decisions (phase I) on vertical mergers between 2008 and 2016. Third, the exante assessment has not applied a phase II in-depth analysis to any case due to the absence of competition concerns. Finally, due to the absence of complaints, there is a lack of any ex post assessment of the effects of vertical integration.

Research limitations/implications

This assessment is important for understanding the current and emerging features of intra-port and inter-port competition and the potential effects that the continuation and expansion of liner companies' vertical integration strategies will have along maritime supply chains. It also contributes to the broader discussion on liner companies' strategies, such as the research and policy-making efforts around the globe to understand the impact of both vertical and horizontal integration.

Practical implications

These discussions are critical for a diversity of businesses that use liner shipping services or provide facilities and services to container shipping lines or ports. They are important for the interests of customers and consumers as they could inform any needed re-visiting of competition policy to protect from the dominance of any market developments that would lead to conditions limiting competition. Expanding analysis on the competition effects of non-notified mergers would help a better understanding of market changes.

Social implications

Enhancing competition and limiting monopolies is valuable from a consumer's perspective. This is more so in the case of maritime trade that serves the needs of societies. The study contributes by generating a better understanding of how decision-makers have worked towards that direction and what realignments are worthy.

Originality/value

There are no previous comprehensive reviews and analyses of the ways that policy-makers at the regional level have addressed the competition effects of vertical integration strategies of liner shipping companies when enhancing competition is valuable from a consumer perspective. Comparing maritime economists and competition, the study, via its literature review, also offers a comparison of maritime and competition perspectives on these competition effects, allowing positioning of how effective decisional-making practices have been.

Details

Maritime Business Review, vol. 9 no. 1
Type: Research Article
ISSN: 2397-3757

Keywords

Article
Publication date: 27 July 2018

Akintayo Opawole, Godwin Onajite Jagboro, Kahilu Kajimo-Shakantu and Betty Oluwafunso Olojede

The purpose of this paper is to evaluate critical factors that impact public sector organizations’ (PSOs) performance in PPP contracts with a view to improving their capabilities…

Abstract

Purpose

The purpose of this paper is to evaluate critical factors that impact public sector organizations’ (PSOs) performance in PPP contracts with a view to improving their capabilities toward efficient project delivery and attracting more private sector investments.

Design/methodology/approach

The research methodology is a quantitative approach which commenced with an in-depth literature review that provided the basis for identification of the variables that were evaluated through a structured questionnaire. Respondents were professionals from stakeholders’ organizations that had been involved in PPP contracts in the Southwestern region of Nigeria selected using respondent driven sampling technique. These include industrial practitioners from governmental-based organizations (ministries, agencies, corporations/parastatals, etc.), private developers/concessionaires, law firms, and banks, among others. Data collected were analyzed using mean, relative significance index) and factor analysis.

Findings

The critical performance factors of PSOs in concession contracts clustered under nine components. These were technical, legal, political, finance, market maturity, economic, procurement process, performance guarantee and degree of regulation. PSOs’ capability development measure in countries newly experimenting with concession model is expected to focus on these factors for improved project delivery.

Research limitations/implications

The study provided implications for capabilities improvement, legislation and policy making with respect to PPP transactions in countries newly experimenting with PPP contracts. This is highly significant to improving the capabilities of PSOs and attraction of more private sector partnership in infrastructure delivery through the concession model.

Practical implications

The study provided implication for capabilities improvement, legislation and policing with respect to PPP transactions in countries newly experimenting with PPP contracts. This is highly significant to improving the capabilities of PSOs and attraction of more private sector partnership in infrastructure delivery through concession model.

Originality/value

Previous studies on PPP performance had either focused on the projects or generalized the performance assessment to PSOs and private investors. This study extended the researches on PPP performance by revealing factors specific to the public sector stakeholders.

Details

Property Management, vol. 37 no. 1
Type: Research Article
ISSN: 0263-7472

Keywords

1 – 10 of 690