Article
Publication date: 20 July 2022

Oluyemi T. Adeosun, Kayode E. Owolabi, Idongesit C. Eshiet and Temitope J. Owolabi

The upsurge in global youth migration remains a major concern for policymakers, politicians and academia at large. Given the emerging interests in youth migration and informal…

Abstract

Purpose

The upsurge in global youth migration remains a major concern for policymakers, politicians and academia at large. Given the emerging interests in youth migration and informal jobs in cities around the world, this study aims to establish the barriers limiting the transition of migrant youths, in informal settings, into formal jobs and the consequent impact on their livelihood.

Design/methodology/approach

Leveraging the push-pull approach of the functionalist migration school, this study uses a primary research design. A structured questionnaire was administered among 150 migrant youths who were selected across informal settings in Lagos, using a convenient sampling technique. Then, a structured face-to-face interview was later conducted among 40 selected migrant youths.

Findings

There is a skill mismatch between the competence of the youths and the requirements of firms in the formal sector, and the migrant youths are largely disenfranchised from opportunities that flow within certain networks. Another critical constraint includes language barrier, ethnicity and religious biases by certain employers. Most migrant youths are economically better off compared to where they came from, even though they are yet to exit the poverty trap.

Originality/value

This study critically examined the challenges faced by the migrant youth population in Lagos, Nigeria, in their bid to transition from informal employment to formal employment.

Details

Journal of Enterprising Communities: People and Places in the Global Economy, vol. 17 no. 6
Type: Research Article
ISSN: 1750-6204

Keywords

Open Access
Article
Publication date: 8 June 2021

Oluyemi Theophilus Adeosun, Ayodele Ibrahim Shittu and Temitope J. Owolabi

As the 4th industrial revolution (4IR) unfolds, there is an increasing awareness that its implications for workforce transformation and shifts in workforce demand will profoundly…

4339

Abstract

Purpose

As the 4th industrial revolution (4IR) unfolds, there is an increasing awareness that its implications for workforce transformation and shifts in workforce demand will profoundly impact the future of work. Specifically, the paper seeks to answer the following research questions: i) how does Students’ Industrial Work Experience Scheme (SIWES) equip young people for the real world of work, especially in the era of the third industrial revolution?; ii) does SIWES support the exposure of young people to the world of digitalization?; and iii) what are the effects of the SIWES exposure on the employability of young people? This paper aims to evaluate the University Internship system and preparation of young people for the world of work in the 4th industrial revolution.

Design/methodology/approach

This paper used a mixed method to unravel the objectives of this study, that is, quantitative and qualitative methods. For the former, structured questionnaires were used to elicit a response from 249 young people drawn from tertiary institutions across Lagos State, Nigeria. The latter used an in-depth interview method conducted among 45 respondents (25 employers of labor and 20 lecturers).

Findings

The findings reveal that: SIWES contributes meaningfully to the advancement of knowledge and capacity building among young people; SIWES exposes young people to the world of digitalization, depending on the organization where the internship takes place; and SIWES pays little attention to financial rewards and more attention to the acquisition of skills that are relevant to the world of work. The practical and policy implications of the findings are critically discussed.

Originality/value

This paper critically evaluates the SIWES policy amidst the growing threats of widening skills gap, greater inequality and broader polarization.

Details

Rajagiri Management Journal, vol. 16 no. 2
Type: Research Article
ISSN: 0972-9968

Keywords

Open Access
Article
Publication date: 31 August 2021

Oluyemi Theophilus Adeosun and Temitope Owolabi

The purpose of this paper is to empirically examine the perspective of youth employees about owner manager businesses. The owner-manager business (a one-man business) is the most…

1938

Abstract

Purpose

The purpose of this paper is to empirically examine the perspective of youth employees about owner manager businesses. The owner-manager business (a one-man business) is the most common in Lagos. Hence, an inquiry into their management style and how it impacts youth employees within the context of decent work is important to explore.

Design/methodology/approach

The study used the convenience sample technique to obtain data from 382 owner-managers and youth employees who work in owner-managed businesses across various sectors. They were administered a questionnaire with carefully structured questions, with an 81% return rate. The exploratory factor analysis (EFA) technique was used to identify the prominent parameters, and the hypothesis tested and validated accordingly.

Findings

The study identified three prominent factors that youth consider when working for an owner-manager business, i.e. the workplace factor, geographical factors and employee benefit. Consequently, issues regarding sustainable employment, conducive working conditions, job security and pension are paramount in the youths' view. Many owner-managers do not respect labour laws, and job security is low in owner-managed businesses; hence, they experience high turnover as most youth work in one-man businesses to gain experience.

Originality/value

The owner-manager business is the most predominant in the country and yet is under-researched. Furthermore, the perception of youth employees regarding owner-manager businesses provides a better understanding of performance and expected satisfactory outcome required from youth employees and how they can be met through proper channelling of their energies to the right tasks.

Details

Journal of Business and Socio-economic Development, vol. 3 no. 2
Type: Research Article
ISSN: 2635-1374

Keywords

Article
Publication date: 15 September 2021

Temitope Owolabi, Tunde A. Alabi and Sofiat A. Busari-Akinbode

This study aims to investigate female commercial drivers in the Lagos metropolis. The study sought to know the circumstances that motivated women to venture into commercial…

Abstract

Purpose

This study aims to investigate female commercial drivers in the Lagos metropolis. The study sought to know the circumstances that motivated women to venture into commercial driving; the experiences they encounter whilst engaging with other stakeholders in the public space; the dimension of the conflict between work and family, and the coping strategies used and finally, the health concerns of female commercial drivers.

Design/methodology/approach

The study adopted a cross-sectional design and a qualitative method of data collection. An in-depth interview guide was used to elicit information from 18 female drivers drawn from three sectors of commercial transportation in Lagos State.

Findings

It was found that the major motivation for engaging in commercial driving is the need for survival and family support; although participants acknowledged that they cannot be in the profession for a long time. Married women had less time to engage in commercial driving due to other family responsibilities. Women drivers have experienced mixed reactions from other road users. Commercial driving is physically demanding and poses threat to the health of female commercial drivers.

Originality/value

The findings highlight the circumstances behind women participating in commercial driving. Despite the challenges encountered in this course of this activity, they are still bent on continuing because of the need to take care of their children, a majority of their spouses are not fully contributing to the maintenance of the home.

Details

Journal of Enterprising Communities: People and Places in the Global Economy, vol. 17 no. 2
Type: Research Article
ISSN: 1750-6204

Keywords

Article
Publication date: 3 May 2022

Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 23 November 2021

Olufisayo Adewumi Adedokun, Temitope Egbelakin, Deborah Oluwafunke Adedokun and Johnson Adafin

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among…

Abstract

Purpose

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overall project performance, which is common in the construction management literature, the purpose of this study is to assess the impacts of risk factors on the criteria for measuring the success of public TEBP.

Design/methodology/approach

The paper adopted a quantitative research method where the data collection was via a questionnaire survey. The researcher administered 452 questionnaires to the client representatives, consultants and contractors involved in building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and suitable for the analysis, translating to a 61.73% response rate. The reliability analysis of the research instrument showed 0.965 and 0.807, via Cronbach’s alpha test, indicating high reliability of the instrument used for data collection.

Findings

The study found different risk factors affecting the criteria for measuring the success of TEBP. For instance, the environmental risk factor significantly impacted completion to cost, while financial and political risk factors significantly impacted completion to time. In addition, while environmental, legal and management risks significantly impacted end-user satisfaction, safety performance was significantly impacted by logistic, legal, design, construction, political and management risks. Besides, the logistic, legal, design, construction, financial, political and management risk factors impacted profit. However, despite profit being one of the criteria for measuring the success of building projects, it recorded the highest risk impacts amounting to 41% variance.

Research limitations/implications

The findings are limited to the public tertiary education building projects procured via competitive tendering; therefore, the results might differ when considering other procurement methods.

Practical implications

The practical implication is that rather than focusing on all risk factors, the project stakeholders could give adequate attention to the significant risk factors impacting each of the parameters for measuring the success of education building projects.

Originality/value

The study revealed specific risk factors impacting the criteria for measuring the success of TEBP, which extend beyond the use of the overall project performance approach.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 18 August 2020

Oluyomi A. Osobajo, Adekunle Oke, Temitope Omotayo and Lovelin Ifeoma Obi

While circular economy (CE) is fast becoming a political and economic agenda for global urban development, there are still substantial knowledge gaps in possible strategies to…

1872

Abstract

Purpose

While circular economy (CE) is fast becoming a political and economic agenda for global urban development, there are still substantial knowledge gaps in possible strategies to speed up such transition, especially in the construction industry. This study analyses literature surrounding CE to unpack current trends possible future research directions to foster CE implementation in the construction industry.

Design/methodology/approach

The study undertakes a systematic review of CE literature published between 1990 and 2019. It adopts a five-stage procedure as a methodological approach for the review: formulation of the research question(s), locating and identifying relevant studies, selection and evaluation of studies, analysis or synthesis and results reporting.

Findings

The findings on CE research in the construction industry show extensive focus on resource use and waste management. There are limited investigations in other areas of construction such as supply chain integration, building designs, policy, energy efficiency, land use, offsite manufacturing, whole life costing, and risk, cost reduction, cost management, health and safety management. The study findings provide evidence that current CE practice fails to incorporate other areas that would facilitate the network of true circular construction industry.

Originality/value

This research provides a comprehensive overview of research efforts on CE in the construction context, identifying areas of extensive and limited coverage over three decades. Besides, it identifies possible pathways for future research directions on CE implementation, towards the accelerated transition to a true circular construction industry for the benefit of funding bodies and researchers.

Details

Smart and Sustainable Built Environment, vol. 11 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 September 2019

Temitope Seun Omotayo, Prince Boateng, Oluyomi Osobajo, Adekunle Oke and Loveline Ifeoma Obi

The purpose of this paper is to present a capability maturity model (CMM) developed to implement continuous improvement in small and medium scale construction companies (SMSCC) in…

1384

Abstract

Purpose

The purpose of this paper is to present a capability maturity model (CMM) developed to implement continuous improvement in small and medium scale construction companies (SMSCC) in Nigeria.

Design/methodology/approach

A multi-strategy approach involving qualitative studies of SMSCC in Nigeria was conducted. Semi-structured interviews were conducted with purposively selected construction experts in Nigeria to identify variables essential for continuous improvement in SMSCC. Data collected were thematically analysed using NVIVO. Subsequently, a system thinking approach is employed to design and develop the CMM for implementing continuous improvement SMSCC, by exploring possible relationships between the variables established.

Findings

CMM provided a five-level approach for the inclusion of investigated variables such as team performance; culture; structure; post-project reviews, financial risk management, waste management policy and cost control. These variables are factors leading to continuous improvement in SMSCC, implementable within a six to seven and a half years’ timeline.

Practical implications

The system thinking model revealed cogent archetypes in the form of reinforcing loops that can be applied in developing the performance of SMSCC. Continuous improvement is feasible. However, it takes time to implement. Further longitudinal studies on the cost of implementing continuous improvement through CMM a knowledge transfer project can be initiated.

Originality/value

A methodical strategy for enhancing the effectiveness and operations of SMSCC in developing countries can be extracted from the causal loop diagram and the CMM.

Details

International Journal of Productivity and Performance Management, vol. 69 no. 2
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 3 July 2020

Temitope Omotayo, Ayokunle Olanipekun, Lovelin Obi and Prince Boateng

Continual cost reduction of overhead costs of building projects can realign the concept of post-contract cost control towards value-driven construction projects and stakeholders’…

Abstract

Purpose

Continual cost reduction of overhead costs of building projects can realign the concept of post-contract cost control towards value-driven construction projects and stakeholders’ satisfaction. This study synthesised and analysed the viable continuous improvement measures critical for waste reduction during the execution phase of a building project.

Design/methodology/approach

A review of existing literature facilitated a list of continuous improvement measures. This literature review findings enabled a Likert-scale questionnaire which was administered to two-hundred and fifty (250) small- and medium-scale construction companies (SMSCC) in Nigeria. Multiple linear regression statistical tests deduced the significant cost reduction measure from which a causal loop diagram was designed to indicate continuous improvement measures during the execution phase of a building project.

Findings

Cogent construction activities associated with overhead costs were deduced from the statistical tests as being payment of suppliers and sub-contractors and purchase orders. An all-inclusive casual loop model for cost reduction through waste minimisation in construction projects as a viable oriented mechanism for meeting clients' requirements was developed.

Practical implications

The causal loop continuous improvement model recognised external and internal factors which are crucial for SMSCC to focus on for their organisational growth and performance enhancement.

Originality/value

A focus on non-physical waste in construction organisations potentially addresses behavioural challenges for continuous improvement.

Details

Built Environment Project and Asset Management, vol. 10 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords