Article
Publication date: 14 November 2023

Haitham Nobanee, Ahmad Yuosef Alodat and Dipanwita Chakraborty

The purpose of this study is to evaluate the progress and scholarly contributions concerning the effects of COVID-19 on transportation.

Abstract

Purpose

The purpose of this study is to evaluate the progress and scholarly contributions concerning the effects of COVID-19 on transportation.

Design/methodology/approach

Using the SCOPUS database, an analysis was conducted on the output of 733 studies concerning COVID-19 and transportation from 2020 to 2022. Bibliometric visualization techniques were performed, which included funding sponsors, top-cited documents, top journals, top countries, co-authorship of authors, co-citation of authors and keyword analysis.

Findings

This study presents diverse findings encompassing influential authors, predominant countries, prominent journals, pivotal papers, funding institutions and affiliations engaged in COVID-19 and transportation research. The research offers a comprehensive assessment of the field’s advancement, addressing existing gaps within the context of limited pertinent literature.

Practical implications

These practical implications highlight how the taxonomical study using bibliometric visualization can inform various aspects of research, policy, practice and decision-making related to COVID-19 and transportation.

Originality/value

The study uses bibliometric visualization techniques to provide a comprehensive overview of existing literature and research trends in COVID-19 and transportation. Its taxonomical approach categorizes the literature systematically, enhancing its originality. The comprehensive analysis contributes to understanding the research landscape, while visualization uncovers new insights. Overall, the study’s unique focus, visualization techniques, taxonomical approach and comprehensive analysis offer originality and potential for new insights in this field.

Details

Global Knowledge, Memory and Communication, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2514-9342

Keywords

Article
Publication date: 16 August 2022

Sayan Chakraborty, Charandeep Singh Bagga and S.P. Sarmah

Being the final end of the logistic distribution, attended home delivery (AHD) plays an important role in the distribution network. AHD typically refers to the service provided by…

Abstract

Purpose

Being the final end of the logistic distribution, attended home delivery (AHD) plays an important role in the distribution network. AHD typically refers to the service provided by the distribution service provider to the recipient's doorstep. Researchers have always identified AHD as a bottleneck for last-mile delivery. This paper addresses a real-life stochastic multi-objective AHD problem in the context of the Indian public distribution system (PDS).

Design/methodology/approach

Two multi-objective models are proposed. Initially, the problem is formulated in a deterministic environment, and later on, it is extended to a multi-objective AHD model with stochastic travel and response time. This stochastic AHD model is used to extensively analyze the impact of stochastic travel time and customer response time on the total expected cost and time-window violation. Due to the NP-hard nature of the problem, an ant colony optimization (ACO) algorithm, tuned via response surface methodology (RSM), is proposed to solve the problem.

Findings

Experimental results show that a change in travel time and response time does not significantly alter the service level of an AHD problem. However, it is strongly correlated with the planning horizon and an increase in the planning horizon reduces the time-window violation drastically. It is also observed that a relatively longer planning horizon has a lower expected cost per delivery associated.

Research limitations/implications

The paper does not consider the uncertainty of supply from the warehouse. Also, stochastic delivery failure probabilities and randomness in customer behavior have not been taken into consideration in this study.

Practical implications

In this paper, the role of uncertainty in an AHD problem is extensively studied through a case of the Indian PDS. The paper analyzes the role of uncertain travel time and response time over different planning horizons in an AHD system. Further, the impact of the delivery planning horizon, travel time and response time on the overall cost and service level of an AHD system is also investigated.

Social implications

This paper investigates a unique and practical AHD problem in the context of Indian PDS. In the present context of AHD, this study is highly relevant for real-world applications and can help build a more efficient delivery system. The findings of this study will be of particular interest to the policy-makers to build a more robust PDS in India.

Originality/value

The most challenging part of an AHD problem is the requirement of the presence of customers during the time of delivery, due to which the probability of failed delivery drastically increases if the delivery deviates from the customer's preferred time slot. The paper modelled an AHD system to incorporate uncertainties to attain higher overall performance and explore the role of uncertainty in travel and response time with respect to the planning horizon in an AHD, which has not been considered by any other literature.

Details

Kybernetes, vol. 52 no. 12
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 16 August 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie, Olalekan Shamsideen Oshodi and Opeyemi Olanrewaju Oyeyipo

Construction management researchers have acknowledged that the use of buildability could improve outcomes of project. Efficient use of resources required for the procurement of…

Abstract

Purpose

Construction management researchers have acknowledged that the use of buildability could improve outcomes of project. Efficient use of resources required for the procurement of construction projects is important for the economy. This study aims to aggregate the current knowledge on buildability within the construction management domain into an understandable whole using the systematic review approach.

Design/methodology/approach

An interpretivist epistemological approach was used as a lens for the systematic review of published research on buildability. The selected articles cover the time period between 1987 and 2020. The articles published in 2021 and 2022 were excluded to ensure that the scope of the current study is distinct and clear. In this research, qualitative content analysis was used to scrutinise the selected journal papers.

Findings

Based on the analysis of literature, the trends and gaps in the current knowledge on the topic of interest were identified. It was found that stakeholder’s knowledge and commitment play a huge role in the extent of adoption of buildability as a practice in the construction sector. Also, the study confirms that the use of buildability is beneficial to the project and its stakeholders.

Originality/value

The study maps the current state of knowledge on buildability and provides information on the gaps that could be explored in the future by researchers.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 January 2023

Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…

Abstract

Purpose

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.

Design/methodology/approach

A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.

Findings

The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.

Originality/value

This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 August 2022

Mershack Opoku Tetteh, Albert P.C. Chan, Saeed Reza Mohandes and Daniel Yamoah Agyemang

International construction joint ventures (ICJVs) implementation is plagued with several barriers, full understanding of which is still lacking due to a lack of an in-depth…

Abstract

Purpose

International construction joint ventures (ICJVs) implementation is plagued with several barriers, full understanding of which is still lacking due to a lack of an in-depth exploration of them, particularly in developing countries. To fill this knowledge gap, this study aims to investigate the critical barriers to the success of ICJVs hosted in developing countries by examining the Ghanaian case.

Design/methodology/approach

This study builds on a previous study that identified 37 barriers factors to ICJVs success via a systematic literature review. Through expert interviews, 34 potential barriers were identified, and a two-round survey was conducted with 84 ICJVs practitioners in Ghana. The data collected was analyzed using the combination of a multidimensional fuzzy logic method and confirmatory factor analysis.

Findings

Results showed that 22 barriers were critical. The top five most critical barriers were “lack of preparedness to accept company philosophy,” “competing objectives,” “opportunistic behavior of parties,” “conflicts” and “lack of management control.” Furthermore, the results uncovered and confirmed five significant underlying components for the 22 critical barriers, namely, organizational-related, cultural-related, knowledge-related, individual-related and logistics-related barriers.

Practical implications

The findings could be useful to ICJVs practitioners and policymakers in developing suitable strategies for the successful implementation of ICJVs. Further, foreign firms aiming to execute and promote ICJVs in Ghana could have prior knowledge of the critical barriers and prepare for them.

Originality/value

This study empirically analyzed the individual levels of barriers criticalities in ICJVs context and from a specific-country perspective – the developing country of Ghana – rather than in the context of construction joint ventures and from a cross-country perspective in extant studies.

Article
Publication date: 13 December 2022

Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…

Abstract

Purpose

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.

Design/methodology/approach

A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.

Findings

Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.

Practical implications

The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.

Originality/value

Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 September 2022

Namal Thilakarathne, Akila Pramodh Rathnasinghe, Udayangani Kulatunga, Niraj Thurairajah and Lichini Weerasinghe

Most developing countries, such as Sri Lanka (SL), are now looking for the support of foreign construction companies for large-scale infrastructure projects in return for…

Abstract

Purpose

Most developing countries, such as Sri Lanka (SL), are now looking for the support of foreign construction companies for large-scale infrastructure projects in return for expertise and resources. Thus, foreign companies may enter into agreements with local contractors through joint ventures (JVs). However, the priorities of construction project stakeholders may differ, which may ultimately end up in conflicts. Therefore, this research aims to investigate the most suitable conflict management strategies for international construction JVs (ICJVs) considering the SL context.

Design/methodology/approach

The mixed method was used for the research choice by selecting a questionnaire survey and expert interviews. Completed questionnaires (n = 78) were analysed using statistical techniques. The expert interviews with six industry practitioners were piloted to increase the validity and credibility of survey findings through a triangulation process where the collected data was analysed through content analysis.

Findings

The findings confirm that JV parties should first seek collaborative solutions in a conflict and seek legal redress only when those efforts are unsuccessful. Collaborating and compromising were recommended as the most appropriate tactics if an informal approach to conflict management was chosen. Alternative dispute resolution and litigation were identified as formal conflict management strategies.

Originality/value

This study, to the best of the authors’ knowledge, will be the first of its kind in SL, which will lead to a better understanding of conflict management in IJCVs and will encourage other researchers to extend this study through further work.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Book part
Publication date: 9 November 2023

Armand Kasztelan and Adam Sulich

The transformation towards the Green Economy (GE) in Poland is a relatively new topic for researchers, policymakers and business practitioners. A comprehensive picture of the…

Abstract

Research Background

The transformation towards the Green Economy (GE) in Poland is a relatively new topic for researchers, policymakers and business practitioners. A comprehensive picture of the shift towards the GE can help mentioned groups translate theoretical assumptions into practice.

Purpose of the Article

This chapter presents the assessment of Poland's shift towards the GE, measured by the proposed Green Transformation Index (GTI).

Methodology

The set of GE indicators was elaborated in Structured Literature Review (SLR) variation method. Then, this set of indicators was compared with the Statistics Poland (GUS) secondary data and employed in the taxonometric calculation methods.

Findings

In the result, the GTI for the Polish economy was proposed and calculated between 2007 and 2020. The GTI allowed us to present a dynamic analysis of the transformation towards GE in Poland.

Article
Publication date: 6 February 2024

Somayeh Tamjid, Fatemeh Nooshinfard, Molouk Sadat Hosseini Beheshti, Nadjla Hariri and Fahimeh Babalhavaeji

The purpose of this study is to develop a domain independent, cost-effective, time-saving and semi-automated ontology generation framework that could extract taxonomic concepts…

Abstract

Purpose

The purpose of this study is to develop a domain independent, cost-effective, time-saving and semi-automated ontology generation framework that could extract taxonomic concepts from unstructured text corpus. In the human disease domain, ontologies are found to be extremely useful for managing the diversity of technical expressions in favour of information retrieval objectives. The boundaries of these domains are expanding so fast that it is essential to continuously develop new ontologies or upgrade available ones.

Design/methodology/approach

This paper proposes a semi-automated approach that extracts entities/relations via text mining of scientific publications. Text mining-based ontology (TmbOnt)-named code is generated to assist a user in capturing, processing and establishing ontology elements. This code takes a pile of unstructured text files as input and projects them into high-valued entities or relations as output. As a semi-automated approach, a user supervises the process, filters meaningful predecessor/successor phrases and finalizes the demanded ontology-taxonomy. To verify the practical capabilities of the scheme, a case study was performed to drive glaucoma ontology-taxonomy. For this purpose, text files containing 10,000 records were collected from PubMed.

Findings

The proposed approach processed over 3.8 million tokenized terms of those records and yielded the resultant glaucoma ontology-taxonomy. Compared with two famous disease ontologies, TmbOnt-driven taxonomy demonstrated a 60%–100% coverage ratio against famous medical thesauruses and ontology taxonomies, such as Human Disease Ontology, Medical Subject Headings and National Cancer Institute Thesaurus, with an average of 70% additional terms recommended for ontology development.

Originality/value

According to the literature, the proposed scheme demonstrated novel capability in expanding the ontology-taxonomy structure with a semi-automated text mining approach, aiming for future fully-automated approaches.

Details

The Electronic Library , vol. 42 no. 2
Type: Research Article
ISSN: 0264-0473

Keywords