Article
Publication date: 1 June 2022

James T. O'Connor, Fernanda Leite and Jong Won Ma

The purpose of this paper is to present a comprehensive analysis on how the advanced work packaging (AWP) managerial paradigm could be advanced by incorporating and integrating…

Abstract

Purpose

The purpose of this paper is to present a comprehensive analysis on how the advanced work packaging (AWP) managerial paradigm could be advanced by incorporating and integrating the post-construction commissioning and startup (CSU) phases.

Design/methodology/approach

This study was implemented with the support of consolidated knowledge from industry subject matter experts and an exhaustive literature review to provide a knowledge foundation for the developments. The findings were further validated and strengthened by external subject matter experts.

Findings

A new operating system-oriented work package, systems work package (SWP), is devised with a set of definitions and models of how it relates to AWPs with three-dimensional visualizations. SWP-related constraints, key roles and responsibilities are thoroughly investigated.

Research limitations/implications

A new SWP concept would pose potential challenges for its adoption because of inherent organizational culture and hesitation to change. A systematic reorganization of existing practices is considered as a key strategy to alleviate the limitation, and short- and long-term validity of SWP is currently being investigated by organizations.

Practical implications

This research provides practical implementation strategies on CSU integration which lead to benefits including: better alignment and collaboration of stakeholders, reduced costs for associating AWPs to SWP and improved predictability.

Originality/value

AWP-related studies have primarily focused on the construction phase, with minimal integration of CSU considerations. Highlighting the importance of the philosophy “start with the end in mind,” this research describes how the AWP managerial paradigm can be expanded to include CSU, by placing a strong emphasis on understanding CSU priorities, sequences and constraints.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 April 2019

Ziwei Wang and Ehsan Rezazadeh Azar

Project schedules have a vital role in the effective management of time, cost, scope and resources in construction projects, and creating schedules requires schedulers with…

Abstract

Purpose

Project schedules have a vital role in the effective management of time, cost, scope and resources in construction projects, and creating schedules requires schedulers with construction knowledge and experience. The increase in the complexity of building projects and the emergence of building information modeling (BIM) in the architecture, engineering and construction industry have encouraged researchers to explore BIM capabilities for automated schedule generation. The scope and capabilities of the developed systems, however, are limited and the link between design and scheduling is still underdeveloped. This paper aims to investigate methods to develop a BIM-based framework to automatically generate schedules for concrete-framed buildings.

Design/methodology/approach

This system first extracts the required data from the building information model, including elements’ dimensions, quantities, spatial information, materials and other related attributes. It then applies construction rules, prior knowledge and production rate data to create project work-packages, calculate their durations and determine their relationships. Finally, it organizes these results into a schedule using project management software.

Findings

This system provides an automated and easy-to-use approach to generate schedules for concrete-framed buildings that are modeled in a BIM platform. It provides two schedules for each project, both a sequential and an overlapped solution, which the schedulers can modify into a practical schedule based on conditions and available resources.

Originality/value

This research project presents an innovative approach to use BIM-based attributes of structural elements to develop list of work-packages and estimate their durations, and then it uses a combination of rule-based and case-based reasoning to generate the schedules.

Article
Publication date: 1 March 1998

MOHAN M KUMARASWAMY

The findings from a set of related investigations into construction megaproject management were integrated into models, frameworks and basic guidelines that would help to improve…

Abstract

The findings from a set of related investigations into construction megaproject management were integrated into models, frameworks and basic guidelines that would help to improve and integrate (1) work packaging, (2) project participant selection and (3) operational management subsystems. More creative approaches to work packaging and participant selection were seen to significantly support construction industry development and the consequent longer‐term benefits in developing countries. A paradigm of ‘technology exchange’ is proposed as the basis of more viable and mutually beneficial joint ventures which would also facilitate the innovative packaging and integrated management of megaprojects in developing countries. Additionally, it is recommended that hitherto isolated initiatives related to quality, safety or dispute resolution/avoidance should be integrated into synergistic management systems which also incorporate built‐in monitoring and evaluation sub‐systems. In turn, the latter would trigger both short‐ and long‐term remedial measures related to improved project packaging, for example, as well as to personnel training and organizational development programmes.

Details

Engineering, Construction and Architectural Management, vol. 5 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 August 1996

Don McKerrow

Discusses the benefits of recycling packaging, the most obvious being cost savings. But other benefits are often more important, such as better storage facilities and ease of…

2849

Abstract

Discusses the benefits of recycling packaging, the most obvious being cost savings. But other benefits are often more important, such as better storage facilities and ease of handling direct into retail display. Points to difficulties of quantifying benefits in advance. Lists areas where reusable packaging systems work best.

Details

Logistics Information Management, vol. 9 no. 4
Type: Research Article
ISSN: 0957-6053

Keywords

Article
Publication date: 8 August 2008

Jesús García‐Arca and José Carlos Prado Prado

This paper aims to present an integrated management model for packaging design.

5730

Abstract

Purpose

This paper aims to present an integrated management model for packaging design.

Design/methodology/approach

This model is the result of research of the concepts of packaging, logistics and “packaging logistics”. With this approach in mind, the design and development of packaging are structured on four basic corner‐stones, i.e. the definition and understanding of design requirements (logistics, marketing and environmental aspects), the definition of an appropriate organizational structure, the application of “best practices”, and, finally, establishing a control system.

Findings

It was found that the management model developed provides companies with a useful quantitative tool to find the “trade‐off” between the logistics costs reduction and the differentiation capacity linked to packaging.

Originality/value

The model proposed is designed to fill a gap in the measurement systems for making an evaluation of the detailed impact on the overall operation of the supply chain in certain packaging design decisions.

Details

Supply Chain Management: An International Journal, vol. 13 no. 5
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 13 November 2007

Ola Johansson and Daniel Hellström

The purpose of this paper is to propose a framework of the potential benefits of asset visibility in the context of returnable transport items (RTI), and uses the framework to…

2468

Abstract

Purpose

The purpose of this paper is to propose a framework of the potential benefits of asset visibility in the context of returnable transport items (RTI), and uses the framework to examine the effect of asset visibility on the management of RTI systems.

Design/methodology/approach

A combined case study and simulation approach was used. A case study was performed to identify and understand how an existing RTI system is managed, while discrete‐event simulation was the method chosen to explore the potential effect of asset visibility.

Findings

The paper identifies cost aspects of implementing and operating RTI systems which may be influenced by asset visibility. The study implies that significant cost savings can be achieved through increased asset visibility, and highlights the importance of shrinkage and its impact on the operating cost of an RTI system. However, asset visibility alone is not enough; it requires proper actions and continuous management attention in order to attain the savings.

Research limitations/implications

The results are derived from a single, combined case and simulation study.

Practical implications

The combined methods proved to be an efficient way of assessing and quantifying the potential effect of asset visibility along with the associated uncertainty in the results.

Originality/value

The paper provides an improved understanding of the effect of asset visibility on the management of RTI systems and complements existing visibility literature.

Details

International Journal of Physical Distribution & Logistics Management, vol. 37 no. 10
Type: Research Article
ISSN: 0960-0035

Keywords

Article
Publication date: 1 September 2000

Mohan Kumaraswamy, Ekambaram Palaneeswaran and Paul Humphreys

A Hong Kong‐based study of factors affecting construction industry performance levels confirms that selection methodologies and decisions are critical, both at the upstream…

4756

Abstract

A Hong Kong‐based study of factors affecting construction industry performance levels confirms that selection methodologies and decisions are critical, both at the upstream formulation of procurement and operational systems themselves as well as the downstream selection of various project participants. Needs are identified for a holistic approach to broader procurement choices that incorporate all procurement sub‐systems, an integration with synergistic operational sub‐systems and more informed and intelligent participant choices. The many interacting variables and potential information overload point to the consequential need for harnessing IT/IS (information technology/information systems) to enable smarter selections at all stages of the construction supply chain. Frameworks and sample modules of the proposed knowledge‐based decision aids are presented in the case of overall procurement system selection and contractor selection.

Details

International Journal of Physical Distribution & Logistics Management, vol. 30 no. 7/8
Type: Research Article
ISSN: 0960-0035

Keywords

Content available
Article
Publication date: 1 February 2005

4585

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 77 no. 1
Type: Research Article
ISSN: 0002-2667

Keywords

Article
Publication date: 1 February 1985

Reducing costs in batch production of PCBs remains one of the most critical issues facing the electronics industry today. Dedicated turnkey systems offer a solution.

Abstract

Reducing costs in batch production of PCBs remains one of the most critical issues facing the electronics industry today. Dedicated turnkey systems offer a solution.

Details

Assembly Automation, vol. 5 no. 2
Type: Research Article
ISSN: 0144-5154

Book part
Publication date: 13 August 2007

Todd Fister and Anju Seth

This paper complements previous research on investment in firm-specific human capital by applying real options analysis. Our framework suggests that the parties receive valuable…

Abstract

This paper complements previous research on investment in firm-specific human capital by applying real options analysis. Our framework suggests that the parties receive valuable options to exit the contract when information becomes revealed in the future, but these options may be more valuable for one party than the other. Companies and workers attempt to reduce the value of the options through contractual mechanisms that either shift wealth to the party granting the option or prevent the option from being exercised. In both cases, the mechanisms cause the parties to invest in firm-specific capital, resulting in higher output and higher wages.

Details

Real Options Theory
Type: Book
ISBN: 978-0-7623-1427-0

1 – 10 of over 67000