Search results

1 – 10 of 468
Article
Publication date: 10 November 2022

Nursyamsi Nursyamsi, Johannes Tarigan, Muhammad Aswin, Badorul Hisham Abu Bakar and Harianto Hardjasaputra

Damage to reinforced concrete (RC) structural elements is inevitable. Such damage can be the result of several factors, including aggressive environmental conditions, overloading…

Abstract

Purpose

Damage to reinforced concrete (RC) structural elements is inevitable. Such damage can be the result of several factors, including aggressive environmental conditions, overloading, inadequate design, poor work execution, fire, storm, earthquakes etc. Therefore, repairing and strengthening is one way to improve damaged structures, so that they can be reutilized. In this research, the use of an ultra high-performance fibre-reinforced concrete (UHPFRC) layer is proposed as a strengthening material to rehabilitate damaged-RC beams. Different strengthening schemes pertaining to the structural performance of the retrofitted RC beams due to the flexural load were investigated.

Design/methodology/approach

A total of 13 normal RC beams were prepared. All the beams were subjected to a four-point flexural test. One beam was selected as the control beam and tested to failure, whereas the remaining beams were tested under a load of up to 50% of the ultimate load capacity of the control beam. The damaged beams were then strengthened using a UHPFRC layer with two different schemes; strip-shape and U-shape schemes, before all the beams were tested to failure.

Findings

Based on the test results, the control beam and all strengthened beams failed in the flexural mode. Compared to the control beam, the damaged-RC beams strengthened using the strip-shape scheme provided an increase in the ultimate load capacity ranging from 14.50% to 43.48% (or an increase of 1.1450 to 1.4348 times), whereas for the U-shape scheme beams ranged from 48.70% to 149.37% (or an increase of 1.4870–2.4937 times). The U-shape scheme was more effective in rehabilitating the damaged-RC beams. The UHPFRC mixtures are workable, as well easy to place and cast into the formworks. Furthermore, the damaged-RC beams strengthened using strip-shape scheme and U-shape scheme generated ductility factors of greater than 4 and 3, respectively. According to Eurocode8, these values are suitable for seismically active regions. Therefore, the strengthened damaged-RC beams under this study can quite feasibly be used in such regions.

Research limitations/implications

Observations of crack patterns were not accompanied by measurements of crack widths due to the unavailability of a microcrack meter in the laboratory. The cost of the strengthening system application were not evaluated in this study, so the users should consider wisely related to the application of this method on the constructions.

Practical implications

Rehabilitation of the damaged-RC beams exhibited an adequate structural performance, where all strengthened RC beams fail in the flexural mode, as well as having increment in the failure load capacity and ductility. So, the used strengthening system in this study can be applied for the building construction in the seismic regions.

Social implications

Aside from equipment, application of this strengthening system need also the labours.

Originality/value

The use of sand blasting on the surfaces of the damaged-RC beams, as well as the application of UHPFRC layers of different thicknesses and shapes to strengthen the damaged-RC beams, provides a novel innovation in the strengthening of damaged-RC beams, which can be applicable to either bridge or building constructions.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 November 2022

Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…

Abstract

Purpose

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.

Design/methodology/approach

A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.

Findings

The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.

Originality/value

To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Olalekan Shamsideen Oshodi

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research…

Abstract

Purpose

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research into buildability reported over the years, a review of the literature shown a dearth of research into the factors supporting the implementation of buildability assessment. Because buildability assessment has been confirmed to be highly beneficial to construction business, this study aims to investigate the factors supporting the implementation of buildability assessment as a tool for buildability improvement using Nigeria as a representative case.

Design/methodology/approach

Survey research method was adopted for the study. Questionnaires were administered to a purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which, a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.

Findings

The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity amongst different professionals in the construction industry, designers consider buildability important, adequate coordination amongst different design disciplines, adequate channel for co-ordination and communication between designers and constructors at the design stage and adequate support from the government as the top most seven factors supporting buildability assessment implementation in construction sector of Nigeria. Secondly, the results from the research revealed that there is no statistically significant difference in factors supporting buildability assessment implementation in construction between clients and consulting and contracting construction organisations in Nigeria.

Originality/value

The findings provide in-depth insight of the factors supporting the implementation of buildability assessment in construction that can help principal stakeholders in construction to facilitate development of strategies required in supporting the adoption and implementation of buildability assessment tool for buildability improvement.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 November 2022

Abdul Hannan Qureshi, Wesam Salah Alaloul, Wong Kai Wing, Syed Saad, Khalid Mhmoud Alzubi and Muhammad Ali Musarat

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution…

Abstract

Purpose

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution, the construction industry practices have evolved toward digitalization. Still, hesitation remains among stakeholders toward the adoption of advanced technologies and one of the significant reasons is the unavailability of knowledge frameworks and implementation guidelines. This study aims to investigate technical factors impacting automated monitoring of rebar for the understanding, confidence gain and effective implementation by construction industry stakeholders.

Design/methodology/approach

A structured study pipeline has been adopted, which includes a systematic literature collection, semistructured interviews, pilot survey, questionnaire survey and statistical analyses via merging two techniques, i.e. structural equation modeling and relative importance index.

Findings

The achieved model highlights “digital images” and “scanning” as two main categories being adopted for automated rebar monitoring. Moreover, “external influence”, “data-capturing”, “image quality”, and “environment” have been identified as the main factors under “digital images”. On the other hand, “object distance”, “rebar shape”, “occlusion” and “rebar spacing” have been highlighted as the main contributing factors under “scanning”.

Originality/value

The study provides a base guideline for the construction industry stakeholders to gain confidence in automated monitoring of rebar via vision-based technologies and effective implementation of the progress-monitoring processes. This study, via structured data collection, performed qualitative and quantitative analyses to investigate technical factors for effective rebar monitoring via vision-based technologies in the form of a mathematical model.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 14 June 2022

Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…

1588

Abstract

Purpose

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.

Design/methodology/approach

To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.

Findings

The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.

Originality/value

This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 April 2024

H.G. Di, Pingbao Xu, Quanmei Gong, Huiji Guo and Guangbei Su

This study establishes a method for predicting ground vibrations caused by railway tunnels in unsaturated soils with spatial variability.

Abstract

Purpose

This study establishes a method for predicting ground vibrations caused by railway tunnels in unsaturated soils with spatial variability.

Design/methodology/approach

First, an improved 2.5D finite-element-method-perfect-matching-layer (FEM-PML) model is proposed. The Galerkin method is used to derive the finite element expression in the ub-pl-pg format for unsaturated soil. Unlike the ub-v-w format, which has nine degrees of freedom per node, the ub-pl-pg format has only five degrees of freedom per node; this significantly enhances the calculation efficiency. The stretching function of the PML is adopted to handle the unlimited boundary domain. Additionally, the 2.5D FEM-PML model couples the tunnel, vehicle and track structures. Next, the spatial variability of the soil parameters is simulated by random fields using the Monte Carlo method. By incorporating random fields of soil parameters into the 2.5D FEM-PML model, the effect of soil spatial variability on ground vibrations is demonstrated using a case study.

Findings

The spatial variability of the soil parameters primarily affected the vibration acceleration amplitude but had a minor effect on its spatial distribution and attenuation over time. In addition, ground vibration acceleration was more affected by the spatial variability of the soil bulk modulus of compressibility than by that of saturation.

Originality/value

Using the 2.5D FEM-PML model in the ub-pl-pg format of unsaturated soil enhances the computational efficiency. On this basis, with the random fields established by Monte Carlo simulation, the model can calculate the reliability of soil dynamics, which was rarely considered by previous models.

Details

Engineering Computations, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 17 February 2022

Md. Habibur Rahman Sobuz, Md. Montaseer Meraz, Ayan Saha, Abu Sayed Mohammad Akid, Noor Md. Sadiqul Hasan, Mizanoor Rahman and Md. Abu Safayet

This study aims to present the variations of optimal seismic control of reinforced cement concrete (RCC) structure using different structural systems. Different third-dimensional…

Abstract

Purpose

This study aims to present the variations of optimal seismic control of reinforced cement concrete (RCC) structure using different structural systems. Different third-dimensional mathematical models are used to examine the responses of multistory flexibly connected frames subjected to earthquake excitations.

Design/methodology/approach

This paper examined a G + 50 multi-storied high-rise structure, which is analyzed using different combinations of moment resistant frames, shear walls, seismic outrigger systems and seismic dampers to observe the effectiveness during ground motion against soft soil conditions. The damping coefficients of added dampers, providing both upper and lower levels are taken into consideration. A finite element modeling and analysis is generated. Then the nature of the structure exposed to ground motion is captured with response spectrum analysis, using BNBC-2020 for four different seismic zones in Bangladesh.

Findings

The response of the structure is investigated according to the amplitude of the displacements, drifts, base shear, stiffness and torsion. The numerical results indicate that adding dampers at the base level can be the most effective against seismic control. However, placing an outrigger bracing system at the middle and top end with shear wall can be the most effective for controlling displacements and drifts.

Originality/value

The response of high-rise structures to seismic forces in Bangladesh’s soft soil conditions is examined at various levels in this study. This study is an original research which contributes to the knowledge to build earthquake resisting high-rises in Bangladesh.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 April 2024

Mahesh Gaikwad, Suvir Singh, N. Gopalakrishnan, Pradeep Bhargava and Ajay Chourasia

This study investigates the impact of the fire decay phase on structural damage using the sectional analysis method. The primary objective of this work is to forecast the…

Abstract

Purpose

This study investigates the impact of the fire decay phase on structural damage using the sectional analysis method. The primary objective of this work is to forecast the non-dimensional capacity parameters for the axial and flexural load-carrying capacity of reinforced concrete (RC) sections for heating and the subsequent post-heating phase (decay phase) of the fire.

Design/methodology/approach

The sectional analysis method is used to determine the moment and axial capacities. The findings of sectional analysis and heat transfer for the heating stage are initially validated, and the analysis subsequently proceeds to determine the load capacity during the fire’s heating and decay phases by appropriately incorporating non-dimensional sectional and material parameters. The numerical analysis includes four fire curves with different cooling rates and steel percentages.

Findings

The study’s findings indicate that the rate at which the cooling process occurs after undergoing heating substantially impacts the axial and flexural capacity. The maximum degradation in axial and flexural capacity occurred in the range of 15–20% for cooling rates of 3 °C/min and 5 °C/min as compared to the capacity obtained at 120 min of heating for all steel percentages. As the fire cooling rate reduced to 1 °C/min, the highest deterioration in axial and flexural capacity reached 48–50% and 42–46%, respectively, in the post-heating stage.

Research limitations/implications

The established non-dimensional parameters for axial and flexural capacity are limited to the analysed section in the study owing to the thermal profile, however, this can be modified depending on the section geometry and fire scenario.

Practical implications

The study primarily focusses on the degradation of axial and flexural capacity at various time intervals during the entire fire exposure, including heating and cooling. The findings obtained showed that following the completion of the fire’s heating phase, the structural capacity continued to decrease over the subsequent post-heating period. It is recommended that structural members' fire resistance designs encompass both the heating and cooling phases of a fire. Since the capacity degradation varies with fire duration, the conventional method is inadequate to design the load capacity for appropriate fire safety. Therefore, it is essential to adopt a performance-based approach while designing structural elements' capacity for the desired fire resistance rating. The proposed technique of using non-dimensional parameters will effectively support predicting the load capacity for required fire resistance.

Originality/value

The fire-resistant requirements for reinforced concrete structures are generally established based on standard fire exposure conditions, which account for the fire growth phase. However, it is important to note that concrete structures can experience internal damage over time during the decay phase of fires, which can be quantitatively determined using the proposed non-dimensional parameter approach.

Details

Journal of Structural Fire Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-2317

Keywords

Article
Publication date: 22 April 2024

Ghada Karaki, Rami A. Hawileh and M.Z. Naser

This study examines the effect of temperature-dependent material models for normal-strength (NSC) and high-strength concrete (HSC) on the thermal analysis of reinforced concrete…

Abstract

Purpose

This study examines the effect of temperature-dependent material models for normal-strength (NSC) and high-strength concrete (HSC) on the thermal analysis of reinforced concrete (RC) walls.

Design/methodology/approach

The study performs an one-at-a-time (OAT) sensitivity analysis to assess the impact of variables defining the constitutive and parametric fire models on the wall's thermal response. Moreover, it extends the sensitivity analysis to a variance-based analysis to assess the effect of constitutive model type, fire model type and constitutive model uncertainty on the RC wall's thermal response variance. The study determines the wall’s thermal behaviour reliability considering the different constitutive models and their uncertainty.

Findings

It is found that the impact of the variability in concrete’s conductivity is determined by its temperature-dependent model, which differs for NSC and HSC. Therefore, more testing and improving material modelling are needed. Furthermore, the heating rate of the fire scenario is the dominant factor in deciding fire-resistance performance because it is a causal factor for spalling in HSC walls. And finally the reliability of wall's performance decreased sharply for HSC walls due to the expected spalling of the concrete and loss of cross-section integrity.

Originality/value

Limited studies in the current open literature quantified the impact of constitutive models on the behaviour of RC walls. No studies have examined the effect of material models' uncertainty on wall’s response reliability under fire. Furthermore, the study's results contribute to the ongoing attempts to shape performance-based structural fire engineering.

Details

Journal of Structural Fire Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-2317

Keywords

Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 468