Search results

1 – 8 of 8
Content available
Article
Publication date: 19 June 2009

Derek H.T. Walker

560

Abstract

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Content available
Article
Publication date: 4 March 2014

113

Abstract

Details

Team Performance Management, vol. 20 no. 1/2
Type: Research Article
ISSN: 1352-7592

Content available
Article
Publication date: 13 September 2011

Derek H.T. Walker

67

Abstract

Details

International Journal of Managing Projects in Business, vol. 4 no. 4
Type: Research Article
ISSN: 1753-8378

Content available
Article
Publication date: 12 January 2010

Ronald McCaffer

354

Abstract

Details

Engineering, Construction and Architectural Management, vol. 17 no. 1
Type: Research Article
ISSN: 0969-9988

Content available
Article
Publication date: 21 June 2011

Derek H.T. Walker

354

Abstract

Details

International Journal of Managing Projects in Business, vol. 4 no. 3
Type: Research Article
ISSN: 1753-8378

Content available
Article
Publication date: 6 July 2012

Mohan Kumaraswamy

371

Abstract

Details

Built Environment Project and Asset Management, vol. 2 no. 1
Type: Research Article
ISSN: 2044-124X

Content available
Article
Publication date: 14 September 2010

Derek H.T. Walker

331

Abstract

Details

International Journal of Managing Projects in Business, vol. 3 no. 4
Type: Research Article
ISSN: 1753-8378

Open Access
Article
Publication date: 30 September 2022

James Olaonipekun Toyin and Modupe Cecilia Mewomo

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies…

2288

Abstract

Purpose

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies revealed a low level of BIM implementation in the context of the Nigerian construction sector. Moreover, previous studies have established that BIM application comes with its share of various barriers. Therefore, this study aims to carry out an on-site survey on barriers to the application of BIM on construction sites in the Nigerian construction industry.

Design/methodology/approach

An extensive review of literature on BIM barriers was conducted, from where 33 factors were identified as significant BIM barriers peculiar to the developing countries. A questionnaire was developed and distributed to the targeted respondents, who are practicing professionals in the Nigerian construction industry, based on the identified barriers. The data collected were analysed by using both descriptive and inferential statistics.

Findings

The principal component analysis revealed that 27 barriers were peculiar to the Nigerian construction industry. The “lack of familiarity with BIM capacity, habitual resistance to change from the traditional style of design and build, and poor awareness of BIM benefit” were identified as the three most critical barriers hindering BIM application on construction sites in the Nigerian construction industry.

Practical implications

This study reveals key information on the peculiar barriers to BIM application in the Nigerian construction industry. The avoidance of these barriers will not only assist various construction stakeholders in the successful implementation of BIM application on a construction project but also promote information management systems and productivity within the construction industry to a great extent. These will further improve post-construction activities.

Originality/value

This study provides a substantial understanding of BIM state of the art in the context of barriers hindering BIM application on construction sites in the Nigerian construction industry.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Only content I have access to

Year

Content type

1 – 8 of 8