Search results
1 – 3 of 3Stephen Akunyumu, Frank D.K. Fugar and Emmanuel Adinyira
The purpose of this study was to assess the readiness of construction companies in Ghana to partner with foreign companies in international construction joint ventures (ICJVs).
Abstract
Purpose
The purpose of this study was to assess the readiness of construction companies in Ghana to partner with foreign companies in international construction joint ventures (ICJVs).
Design/methodology/approach
Using the Verify End-User e-Readiness using a Diagnostic Tool (VERDICT) model, a survey with 31 construction companies was conducted to assess their readiness through four pre-defined elements of readiness.
Findings
The results indicated the readiness of construction companies to collaborate with potential foreign partners in ICJVs. Notwithstanding, certain areas such as management commitment to change, employee buy-in, process flexibility and technology infrastructure need improvement in some firms to achieve readiness. Government has a role in ensuring the readiness of domestic firms for the international market.
Originality/value
This study applies the VERDICT model, a tool originally designed to assess construction organizations’ readiness for e-commerce, to assess the readiness of Ghanaian construction companies for ICJVs.
Details
Keywords
Stephen Akunyumu, Frank D.K. Fugar, Emmanuel Adinyira and James Cofie Danku
There is an urgent need for the construction industry to improve its current performance to increase productivity and satisfy the complex and varying needs of project clients. To…
Abstract
Purpose
There is an urgent need for the construction industry to improve its current performance to increase productivity and satisfy the complex and varying needs of project clients. To be successful, construction companies must innovate. Unfortunately, the extant literature has revealed some inertia towards innovation which in several cases is because of lack of the organisational readiness required to embrace innovation. Various models for assessing organisational readiness are proposed in the literature. Accordingly, the purpose of this paper is to determine the applicability of existing models for assessing the readiness of construction organisations to innovate.
Design/methodology/approach
A desk study of the extant literature was conducted to identify perspectives of readiness assessment and, based on a comparative framework, a set of readiness assessment models identified was examined to ascertain their perspectives on organisational readiness assessment.
Findings
Five models/tools of organisational readiness assessments were identified and compared based on a set of identified criteria. The comparative analysis revealed that three of the models can be used to assess the readiness of construction organisations to innovate, albeit with varied scopes of modification.
Practical implications
The paper presents an overview of readiness assessment perspectives developed through models that could help organisations in selecting the most appropriate tool to assess their readiness.
Originality/value
The paper uses a comparative framework as a basis for analysing the identified models. It further discusses the strengths and weaknesses inherent in each model noting critical areas of omission.
Details
Keywords
Michael Nii Addy, Stephen Akunyumu and Barbara Simons
Sustained access to efficient electricity plays an essential role in improving living conditions of people and contributes to the economic development of the nation as a whole…
Abstract
Purpose
Sustained access to efficient electricity plays an essential role in improving living conditions of people and contributes to the economic development of the nation as a whole. Volta River Authority (VRA) mainly manages the generation plants (hydropower sources and thermal plants) alongside independent power producers (IPPs). Power generation in the country has been influenced by myriads of factors. Thus, the purpose of this study is to assess the key risk factors affecting renewable energy of IPPs set-up project in Ghana.
Design/methodology/approach
Quantitative approach was adopted for the study. Empirical investigation was carried out using the survey approach. The likelihood of occurrence of the risk and the degree of impact of same motivated the use of risk significance index to analyze the data and make deductions from the results.
Findings
From the study, three key risk factors have high level of severity, which include long and complex procedures for authorization of project activities, stability of the policy environment and ease of obtaining rights to land. These risks could be found in the business/strategic risks and policy/regulatory risks categories, respectively. A total of 25 key risk factors had moderate level of severity and 12 key risk factors have low level of severity on renewable energy IPP set up projects.
Practical implications
Top-ranked risk factors require maximum attention. The identified risks should be alleviated with strategies to reduce levels of severity by targeting either the likelihood of occurrence or the level of impact. This will serve as a catalyze to promoting renewable energy IPP set-up projects in Ghana.
Originality/value
Key contribution of the paper to the body of knowledge is demonstrated by the empirical evidence of the risks IPPs are likely to encounter in setting up renewable energy plants in Ghana. The distinctive attribute of this study is further demonstrated by the fact that it focused on the set-up stage, which is a critical stage in the renewable energy provision value chain.
Details