Search results

1 – 7 of 7
Article
Publication date: 27 February 2024

Xiongyong Zhou, Haiyan Lu and Sachin Kumar Mangla

Food sustainability is a world-acknowledged issue that requires urgent integrated solutions at multi-levels. This study aims to explore how food firms can improve their…

Abstract

Purpose

Food sustainability is a world-acknowledged issue that requires urgent integrated solutions at multi-levels. This study aims to explore how food firms can improve their sustainability performance through digital traceability practices, considering the mediating effect of sustainability-oriented innovation (SOI) and the moderating effect of supply chain learning (SCL) for the food supply chain therein.

Design/methodology/approach

Hierarchical regression with a moderated mediation model is used to test the proposed hypotheses with a sample of 359 food firms from four provinces in China.

Findings

Digital traceability has a significant positive impact on the three pillars of sustainability performances among food firms. SOI (product innovation, process innovation and organisational innovation) mediates the relationship between digital traceability and sustainability performance. SCL plays moderating roles in the linkage between digital traceability and both product and process innovation, respectively.

Originality/value

This paper contributes as one of the first studies to develop digital traceability practices and their sustainability-related improvements for Chinese food firms; it extends studies on supply chain traceability to a typical emerging market. This finding can support food sustainability practice in terms of where and how to invest in sustainability innovation and how to improve economic, environmental and social performance.

Details

Supply Chain Management: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 9 January 2023

Jaskirat Singh Rai, Behzad Foroughi, Maher N. Itani and Amanpreet Singh

The perception of sport consumers on peripheral stadium-quality services (PSQS) has evolved after compulsory precautionary measures were imposed on gatherings to alleviate the…

Abstract

Purpose

The perception of sport consumers on peripheral stadium-quality services (PSQS) has evolved after compulsory precautionary measures were imposed on gatherings to alleviate the spread of coronavirus. This study attempts to reassess five principal dimensions of PSQS? Stadium parking, stadium cleanliness, fan control, food services and perceived crowding? through reflecting on the COVID-19 control and prevention measures established during this pandemic. Furthermore, it aims to measure the impact of the multi-dimensional PSQS on spectators' emotions and future attendance intentions.

Design/methodology/approach

The purposive sampling technique was used to collect data from spectators watching the live matches of cricket at the stadium. A total of 680 responses were collected from spectators and uploaded to the measurement model. The covariance-based structural equation modeling technique was used subsequently for analysis purposes.

Findings

The study found a positive impact of the stadium cleanliness and fan control services on spectators' happiness and excitement emotions; and a negative impact of stadium parking, stadium cleanliness, fan control and perceived crowding on their anger, anxiety and dejection emotions. The happiness and excitement emotions of the spectators induced them to visit again at the stadium. Of all the peripheral quality services, the study found only stadium cleanliness service indirectly effect spectators' revisit intentions through excitement emotion as a mediator.

Research limitations/implications

The incorporation of the safety procedures through PSQS can reduce spectators' negative emotions especially when they face psychological fear of the pandemic. These services work as a stimulus for spectators that directly affect their organism (emotions) and indirectly affect their response (attendance intentions).

Originality/value

This study contributed to sports research by novelty evaluating sport consumers' perception of the PSQS after incorporating COVID-19 preventive measures. It empirically examines the effect PSQS on spectators' emotions and re-visits intentions.

Details

International Journal of Sports Marketing and Sponsorship, vol. 24 no. 2
Type: Research Article
ISSN: 1464-6668

Keywords

Article
Publication date: 27 September 2023

Emily Zoe Mann, Stephanie A. Jacobs, Kirsten M. Kinsley and Laura I. Spears

Building on past studies of library privacy policies, this review looks at how privacy information is shared at universities and colleges in the state of Florida. Beyond the…

Abstract

Purpose

Building on past studies of library privacy policies, this review looks at how privacy information is shared at universities and colleges in the state of Florida. Beyond the question of whether a library-specific privacy policy exists, this review evaluates what is covered in the policies – whether topics such as how student data is stored, retained, de-identified and disposed of are broached in the statements, and whether specific data sets covering instruction, reference and surveillance are mentioned. The purpose of this study is to open the door to directed exploration into student awareness of privacy policies and spark conversation about positionality of libraries regarding privacy.

Design/methodology/approach

This review was done using a cross-sectional study design through observation of public-facing library privacy policies of higher education institutions in Florida.

Findings

Findings include that the majority of Florida academic libraries do not have a public-facing privacy policy. Only 15 out of the 70 schools reviewed had one. A large portion of those came from doctoral universities with associate’s colleges having none, and baccalaureate/associate’s colleges having only two. The policies that were in place tended to be institution-centered rather than patron-centered. Most categories of listed data collected were in the area of collections, website or computer usage.

Originality/value

The value of this review is that it adds to the literature studying privacy policies in academic libraries. Going forward, this research could address statewide practice in privacy policies as well as helping to lay pathways for working with students and other library patrons to gauge their interests and concerns about privacy.

Details

Information and Learning Sciences, vol. 124 no. 9/10
Type: Research Article
ISSN: 2398-5348

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2021

Andrew Ebekozien, Clinton Aigbavboa, Angeline Ngozika Chibuike Nwaole, Emmanuel Okhatie Dako and Andrew Igiebor Awo-Osagie

Studies showed that construction consultants' ethical negligence is a contributing factor to the time and cost over-run of projects. There is limited research on the issues that…

Abstract

Purpose

Studies showed that construction consultants' ethical negligence is a contributing factor to the time and cost over-run of projects. There is limited research on the issues that may have hindered construction consultants' ethical responsiveness during contract administration. Studies regarding influencing factors in the context of Nigeria's quantity surveyors' (QS) ethical responsiveness are rare. Thus, the study aims to investigate the perceived issues and proffers initiatives to promote QSs' ethical responsiveness on construction projects in Nigeria.

Design/methodology/approach

To determine the perceptions of QS regarding ethical responsiveness, a phenomenologically driven perspective via face-to-face interviews was conducted with 12 senior professionals in Lagos and Abuja that showed interest in participating in the study and were interviewed. A thematic approach was adopted to analyse the collated data.

Findings

Economic, societal and professional issues emerged as the three groups of issues that hindered QS's ethical responsiveness on construction projects in a developing country setting such as Nigeria. Findings show that for ethical responsiveness to be expressed on projects, key stakeholders should be ethically responsible. This is currently missing, especially in public construction projects. Initiatives that can promote key stakeholders' ethical responsiveness on construction projects are examined in this paper.

Practical implications

The paper embraces an important practical implication because practices associated with QS's unethical responsiveness and behavioural impacts on construction projects were identified. This will stir both the regulatory professional bodies and policymakers to enforce and implement feasible initiatives that can promote key stakeholders' collaborative ethical responsiveness on construction projects.

Originality/value

This paper is amongst the few papers that attempted to uncover issues that hinder QS's ethical responsiveness on construction projects in a developing country setting via a qualitative approach. Since these issues are rampant in developing countries, findings from this paper can be used to promote QS's ethical responsiveness in other nations with similar unethical issues.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

Content available
Article
Publication date: 29 September 2023

Maneerat Kanrak, Yui-yip Lau, Xavier Ling and Saksuriya Traiyarach

The rapid growth in cruise shipping coupled with increasing public awareness of climate change has led to increasing concerns about the impact cruise shipping poses on the…

Abstract

Purpose

The rapid growth in cruise shipping coupled with increasing public awareness of climate change has led to increasing concerns about the impact cruise shipping poses on the environment, especially regarding air emissions. This study analyses the cruise shipping network of ports in and around the emission control areas (ECAs) to understand the structural properties of the network and ports.

Design/methodology/approach

A complex network approach was used to analyse the network data of 239 voyages serviced by 14 international cruise lines, visiting 127 ports across 44 countries in the Caribbean Sea.

Findings

It is found that the network has a small-world property with a short average path length and a high clustering coefficient. The regulations affect connections among ports, in which most ports in ECAs have lower connections than ports outside ECAs. A few ports in ECAs play important key roles, but many ports outside ECAs play a more important role in the network because the regulations are barriers for cruise ships entering the ports.

Originality/value

The findings of this study have drawn useful guidelines for cruise lines and port authorities to improve their operations. Constrictive recommendations are suggested to policymakers for designing reasonable regulations to attract more cruise shipping to travel in ECAs.

Details

Maritime Business Review, vol. 8 no. 4
Type: Research Article
ISSN: 2397-3757

Keywords

1 – 7 of 7