Search results

1 – 10 of 831
Open Access
Article
Publication date: 18 April 2023

Tommi Pauna, Jere Lehtinen, Jaakko Kujala and Kirsi Aaltonen

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental…

2061

Abstract

Purpose

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental stakeholder engagement activities is presented.

Design/methodology/approach

The authors relied on a single-case study of a mining project in Northern Europe, where a novel collaboration and engagement approach with governmental stakeholders was piloted in the project's front-end phase. The analysis focused on the collaborative practices through which the IE project investor engaged governmental stakeholders during the project's front-end phase and how the engagement contributed to solving challenges in the early planning and permitting process and achieving project plans that balanced economic, social and environmental aspects.

Findings

The findings show how four collaborative engagement practices reduced uncertainty and equivocality related to the legal sustainability requirements, enabled the development of sustainable design solutions and overall accelerated the permitting process without compromising the quality of final project plans.

Practical implications

The findings can be used to plan governmental stakeholder engagement and understand related challenges that need to be overcome. The study highlights the need to develop established practices and guidelines for governmental stakeholder engagement.

Originality/value

This study complements prior research on stakeholder engagement and project sustainability by developing an understanding of how governmental stakeholder engagement can be a key mechanism enabling the sustainability of IE project's end product. This research contributes to stakeholder theory by elaborating on a new stakeholder role, intermediary stakeholder.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 4 July 2022

Genell Wells Ebbini and Adel Al-Assaf

The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including…

Abstract

Purpose

The researchers analyzed factors affecting the adoption of the Leadership in Energy and Environmental Design (LEED) green-building certification system in Jordan, including financial performance of certified projects along with broader barriers that may impact developers’ interest in LEED.

Design/methodology/approach

The authors first reviewed online data for all LEED registered and certified projects in Jordan, recruited LEED-certified project stakeholders, collected documents related to LEED projects and conducted LEED category credit summaries, financial cost-benefit analyses and spot-checking reported values in local markets. The authors then visited projects sites and interviewed various project stakeholders to understand better stakeholders' decision-making processes concerning LEED and relevant factors (financial, branding, cultural, political, etc.).

Findings

Obtaining LEED certification in Jordan was financially feasible as evinced in both the quantitative analysis and interviews. However, the authors found that there was very limited interest in LEED among Jordanian developers. Barriers included widespread cynicism toward green building concepts as well as a lack of local expertise in installing and maintaining green technologies. To overcome these barriers, the authors recommend that green building initiatives place a greater emphasis on education and public-promotion activities.

Research limitations/implications

The research data were limited to projects that had successfully achieved LEED certification. Broader qualitative research conducted across the Jordanian building community could provide additional insights, but such an investigation is beyond the scope of the current study.

Originality/value

The complexity of adapting a Western green building standard (LEED) to a non-Western context is discussed in detail. The findings suggest that understanding regional development challenges, local markets and cultural differences is vital for successfully implementing green building certification systems.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. 17 no. 4
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 7 December 2023

Panos Vostanis, Sajida Hassan, Syeda Zeenat Fatima and Michelle O'Reilly

Children in majority world countries (MWC) have high rates of unmet mental health needs, with limited access to specialist resources. Integration of child mental health in…

Abstract

Purpose

Children in majority world countries (MWC) have high rates of unmet mental health needs, with limited access to specialist resources. Integration of child mental health in existing psychosocial care can improve provision. Through a Train-the-Trainer (ToT) cascade approach, this study aimed to provide a framework for such integration in resource-constrained communities in Karachi, Pakistan and to establish hindering and enabling factors.

Design/methodology/approach

Eight practitioners attended a child mental health ToT program, including training on a five-domain service transformation framework. Trainers co-designed and implemented interventions that integrated child mental health knowledge and skills on each domain. These were attended by 136 end-users (youth, parents, teachers, managers), of whom a sub-sample of 47 stakeholders, as well as the trainers, attended focus groups on their experiences. Data were analysed through a thematic codebook.

Findings

Established themes reflected common ingredients across all domains/interventions that were deemed important for child mental health care integration. These included child-centric approaches, positive parenting, community mobilization and systemic changes.

Originality/value

Integrated child mental health care informed by the Train-of-Trainer approach can be a useful model for resource-constrained MWC contexts. Integrated interventions should be co-produced with communities.

Details

Journal of Integrated Care, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1476-9018

Keywords

Content available
Book part
Publication date: 25 October 2023

Sumesh Singh Dadwal

As the size of the population is growing and the capacity of the planet Earth is limited, human beings are searching for sustainable and technology-enabled solutions to support…

Abstract

As the size of the population is growing and the capacity of the planet Earth is limited, human beings are searching for sustainable and technology-enabled solutions to support society, ecology and economy. One of the solutions has been developing smart sustainable cities. Smart sustainable cities are cities as systems, where their infrastructure, different subsystems and different functional domains are virtually connected to the information and communication technologies (ICT) and internet via sensors and devices and the Internet of Things (IoT), to collect and process real-time Big Data and make efficient, effective and sustainable solutions for a democratic and liveable city for its various stakeholders. This chapter explores the concepts and practices of sustainable smart cities across the globe and explores the use of technologies such as IoT, Blockchain technology and Cloud computing, etc. their challenges and then presents a view on business models for sustainable smart cities.

Article
Publication date: 16 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Yue Teng and Mengqi Yuan

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship…

Abstract

Purpose

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship sustainability. The developer satisfaction reflecting requirements can boost the cooperative relationship among stakeholders and act as an evaluation scale for the success of GB projects, which needs to be emphasized in the selection process but little involved in the existing research. This study explores improving GB contractor (GBC) selection by integrating developer satisfaction into selection procedures.

Design/methodology/approach

A systematic framework of GBC selection including twenty-five criteria from literature review and experts survey is firstly constructed. Both tactical and strategic criteria are further classified into Kano categories (must-be, one-dimensional, and attractive categories) using the fuzzy Kano model (FKM), and weighted by the developer satisfaction index. The model proposed by this study combining FKM and TOPSIS divides the selection process into the filtration phase and selection phase by Kano categories. The proposed model is finally verified through performance comparison among multiple methods in a case.

Findings

Selection criteria are measured linearly and nonlinearly, showing criteria having nonlinear satisfaction change accounts for two-thirds of all. Criteria at tactical level tend to be must-be or one-dimensional categories for the developer, and most strategic criteria are classed as the attractive category, indicating that adding strategic criteria is necessary for long-term cooperation. The proposed model, using developer satisfaction to improve the selection process, ensures the selected GBC to be the most satisfactory with requirements of the developer and makes the performance of GBCs easily distinguishable.

Originality/value

This study contributes to the existing body of knowledge for promoting relationship sustainability by supplementing an integrated model with emphasis on developer satisfaction in GBC selection, so as to establish a good initial foundation due to the match between performances of GBCs and needs of developers. It not only helps maximize developer satisfaction in GBC selection by applying satisfaction to pre-construction management, but also instructs GBCs to prioritize performance improvements. The framework is also conducive for developers to classify selection criteria and select other participants (like green suppliers) from the satisfaction perspective in GBs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 March 2022

Daphne Rixon and Fiona Duguid

This policy brief calls for co-operative industry associations to implement policies that encourage co-operatives to embrace the SDGs in a way that reflects the co-operative…

Abstract

This policy brief calls for co-operative industry associations to implement policies that encourage co-operatives to embrace the SDGs in a way that reflects the co-operative difference. In particular, this brief explores why it is important for co-operatives to measure and report on the SDGs and to link the SDGs to the seven principles of co-operatives. We argue that reporting on the SDGs in the context of the seven principles enables co-operatives to illustrate their co-operative difference from investor-owned businesses (IOB) who are increasingly reporting on SDG performance. We identify key recommendations that are critical in facilitating co-operatives’ adoption of the SDGs and in reporting their performance relative to the SDGs and the seven principles.

Details

Emerald Open Research, vol. 1 no. 13
Type: Research Article
ISSN: 2631-3952

Keywords

Article
Publication date: 17 January 2023

Ashutosh Samadhiya, Rajat Agrawal and Jose Arturo Garza-Reyes

Key success factors (KSFs) of total productive maintenance (TPM) have historically played a vital role in attaining economic and ecological sustainability but have overlooked…

Abstract

Purpose

Key success factors (KSFs) of total productive maintenance (TPM) have historically played a vital role in attaining economic and ecological sustainability but have overlooked social sustainability. Hence, this study analyses and ranks the most significant TPM KSFs for attaining social sustainability in manufacturing small and medium enterprises (SMEs).

Design/methodology/approach

The research employs a deductive methodology to identify the relevant TPM KSFs and social sustainability indicators and then uses Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) to rank the TPM KSFs in order to achieve social sustainability, followed by a sensitivity analysis to assess the methodological robustness.

Findings

The findings indicate that the top five TPM KSFs influencing social sustainability are employee health and safety, organizational culture, top management commitment, employee engagement and effective communication and effective workplace management. In addition, the results indicate that effective equipment utilization is the least significant TPM key factor affecting social sustainability.

Research limitations/implications

SME manufacturing managers do not need to worry about all of the TPM KSFs if they only concentrate on the ones that will have the most impact. If managers use the top 5 TPM KSFs as a starting point, they may create customized TPM training programs for their companies. As a result, this will facilitate the efforts of their personnel toward social sustainability.

Originality/value

In the existing literature, little emphasis has been paid to social sustainability and how SMEs may implement these practices. This research adds to the current theory of TPM and social sustainability and sheds light on how SMEs might use TPM to advance toward more socially sustainable operations.

Details

Benchmarking: An International Journal, vol. 30 no. 10
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 4 March 2024

Prasad Vasant Joshi, Bishal Dey Sarkar and Vardhan Mahesh Choubey

Supply chain finance (SCF) has become a vital ingredient that fosters growth and provides flexibility to the global supply chain. Thus, it becomes essential to understand the…

Abstract

Purpose

Supply chain finance (SCF) has become a vital ingredient that fosters growth and provides flexibility to the global supply chain. Thus, it becomes essential to understand the factors that contribute to the success of the supply chain finance ecosystem (SCFE). This study aims to identify the critical success factors (CSFs) for the development of an efficient and effective SCFE. Based on their characteristics, the study intends to classify the factors into constructs and further establish a hierarchical relationship among the CSFs.

Design/methodology/approach

The study is based on empirical data collected from 221 respondents based on administered questionnaires. Exploratory factor analysis (EFA) is carried out on 16 selected factors (out of 21 proposed factors) based on the feedback of the experts and the factors were classified into four constructs. The total interpretive structural modeling (TISM) model was developed by identifying and finalizing CSFs of the SCFE. The model developed a hierarchical relationship between the various factors.

Findings

The study identified significant CSFs for the efficient and effective SCF ecosystem. Four constructs were developed by analyzing CSFs using the EFA. The finalized 16 CSFs modeled through the TISM and further hierarchical relationship established between the CSFs concludes that governmental policies and sectoral growth are the strongest driving forces and financial attractiveness is the weakest driving force. Based on the CSFs and the constructs identified, it was found that for the success of the SCF ecosystem, the existence of an economic ecosystem provides a facilitating framework for the overall development of the SCFE. Also, the trustworthiness among the partners fosters better relationships and results in financial feasibility and offers business opportunities for all the stakeholders.

Practical implications

This study will help the SCF partners across the globe understand the CSFs that ensure development of mutually beneficial SCF ecosystems and provide flexibility to the supply chain partners. The CSFs would provide insights to the policymakers and the financial intermediaries for providing a conducive environment for the development of a better SCF ecosystem. Also, the buyers and sellers would understand the CSFs that would develop better relationships among them and ultimately help in development of business across the globe.

Originality/value

The study identifies the CSFs for the SCF ecosystem. The study ascertains the significant factors and classifies them into clusters using EFA. Unlike the literature available, the paper develops the hierarchical relationship between the CSFs and develops a model for an efficient and effective SCF ecosystem.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 831