Search results

1 – 10 of 21
Article
Publication date: 1 December 2023

Antoine Feuillet, Loris Terrettaz and Mickaël Terrien

This research aimed to measure the influence of resource dependency (trading and/or shareholder's dependencies) squad age structure by building archetypes to identify strategic…

Abstract

Purpose

This research aimed to measure the influence of resource dependency (trading and/or shareholder's dependencies) squad age structure by building archetypes to identify strategic dominant schemes.

Design/methodology/approach

Based on the Ligue 1 football clubs from the 2009/2010 season to the 2018/2019 data, the authors use the k-means classification to build archetypes of resource dependency and squad structure variables. The influence of resource dependency on squad structure is then analysed through a table of contingency.

Findings

Firstly, the authors identify archetypes of resource dependency with some clubs that are dependent on the transfer market and others that do not count on sales to balance their account. Secondly, they provide different archetypes of squad structure choices. The contingency between those archetypes allows to identify three main strategic schemes (avoidance, shaping and adaptation).

Originality/value

The research tests an original relationship between resource dependency of clubs and their human resource strategy to respond to it. This paper can help to provide detailed profiles for big clubs looking for affiliate clubs to know which clubs have efficient academy or player development capacities.

Details

Sport, Business and Management: An International Journal, vol. 14 no. 3
Type: Research Article
ISSN: 2042-678X

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 February 2023

Tahir Akhtar

This study compares the motives of holding cash between developed (Australian) and developing (Malaysian) financial markets.

Abstract

Purpose

This study compares the motives of holding cash between developed (Australian) and developing (Malaysian) financial markets.

Design/methodology/approach

For the period 2006–2020, the t-test, fixed-effect and generalised method of moment (GMM) model have been applied to a sample of 1878 (1,165 Australian and 713 Malaysian) firms.

Findings

The empirical results reveal that firms in developed financial markets hold higher cash compared to the developing financial markets. The findings confirm that motives to hold cash differ between developed and developing financial markets. The GMM findings further show that cash holdings (CH) in Australia are higher due to higher ratios of cash flow, research and development (R&D) and return on assets (ROA), and lower due to larger dividend payments. In the Malaysian market, however, cash flows and R&D are ineffectual, ROA falls and dividend payments rise CH.

Practical implications

The study helps managers, practitioners and investors understand that firms' distinct economic, institutional, accounting and financial environments are important. To attain the desired outcomes, they must thus comprehend and consider these considerations while developing suitable liquidity strategies.

Originality/value

To the authors' best knowledge, this is the initial research demonstrating how varied cash motives and their ramifications are in developed and developing financial markets. Therefore, this study identifies the importance that CH motives varied among financial markets and that findings from a particular market cannot be generalised to other markets because of the market and financial structural variations.

Details

Kybernetes, vol. 53 no. 5
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 1 March 2023

Hossein Shakibaei, Mohammad Reza Farhadi-Ramin, Mohammad Alipour-Vaezi, Amir Aghsami and Masoud Rabbani

Every day, small and big incidents happen all over the world, and given the human, financial and spiritual damage they cause, proper planning should be sought to deal with them so…

Abstract

Purpose

Every day, small and big incidents happen all over the world, and given the human, financial and spiritual damage they cause, proper planning should be sought to deal with them so they can be appropriately managed in times of crisis. This study aims to examine humanitarian supply chain models.

Design/methodology/approach

A new model is developed to pursue the necessary relations in an optimal way that will minimize human, financial and moral losses. In this developed model, in order to optimize the problem and minimize the amount of human and financial losses, the following subjects have been applied: magnitude of the areas in which an accident may occur as obtained by multiple attribute decision-making methods, the distances between relief centers, the number of available rescuers, the number of rescuers required and the risk level of each patient which is determined using previous data and machine learning (ML) algorithms.

Findings

For this purpose, a case study in the east of Tehran has been conducted. According to the results obtained from the algorithms, problem modeling and case study, the accuracy of the proposed model is evaluated very well.

Originality/value

Obtaining each injured person's priority using ML techniques and each area's importance or risk level, besides developing a bi-objective mathematical model and using multiple attribute decision-making methods, make this study unique among very few studies that concern ML in the humanitarian supply chain. Moreover, the findings validate the results and the model's functionality very well.

Content available
Book part
Publication date: 23 April 2024

Abstract

Details

Technological Innovations for Business, Education and Sustainability
Type: Book
ISBN: 978-1-83753-106-6

Article
Publication date: 19 April 2024

Serhat Yuksel, Hasan Dincer and Alexey Mikhaylov

This paper aims to market analysis on the base many factors. Market analysis must be done correctly to increase the efficiency of smart grid technologies. On the other hand, it is…

Abstract

Purpose

This paper aims to market analysis on the base many factors. Market analysis must be done correctly to increase the efficiency of smart grid technologies. On the other hand, it is not very possible for the company to make improvements for too many factors. The main reason for this is that businesses have constraints both financially and in terms of manpower. Therefore, a priority analysis is needed in which the most important factors affecting the effectiveness of the market analysis will be determined.

Design/methodology/approach

In this context, a new fuzzy decision-making model is generated. In this hybrid model, there are mainly two different parts. First, the indicators are weighted with quantum spherical fuzzy multi SWARA (M-SWARA) methodology. On the other side, smart grid technology investment projects are examined by quantum spherical fuzzy ELECTRE. Additionally, facial expressions of the experts are also considered in this process.

Findings

The main contribution of the study is that a new methodology with the name of M-SWARA is generated by making improvements to the classical SWARA. The findings indicate that data-driven decisions play the most critical role in the effectiveness of market environment analysis for smart technology investments. To achieve success in this process, large-scale data sets need to be collected and analyzed. In this context, if the technology is strong, this process can be sustained quickly and effectively.

Originality/value

It is also identified that personalized energy schedule with smart meters is the most essential smart grid technology investment alternative. Smart meters provide data on energy consumption in real time.

Details

International Journal of Innovation Science, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1757-2223

Keywords

Article
Publication date: 23 April 2024

Fatemeh Ravandi, Azar Fathi Heli Abadi, Ali Heidari, Mohammad Khalilzadeh and Dragan Pamucar

Untimely responses to emergency situations in urban areas contribute to a rising mortality rate and impact society's primary capital. The efficient dispatch and relocation of…

Abstract

Purpose

Untimely responses to emergency situations in urban areas contribute to a rising mortality rate and impact society's primary capital. The efficient dispatch and relocation of ambulances pose operational and momentary challenges, necessitating an optimal policy based on the system's real-time status. While previous studies have addressed these concerns, limited attention has been given to the optimal allocation of technicians to respond to emergency situation and minimize overall system costs.

Design/methodology/approach

In this paper, a bi-objective mathematical model is proposed to maximize system coverage and enable flexible movement across bases for location, dispatch and relocation of ambulances. Ambulances relocation involves two key decisions: (1) allocating ambulances to bases after completing services and (2) deciding to change the current ambulance location among existing bases to potentially improve response times to future emergencies. The model also considers the varying capabilities of technicians for proper allocation in emergency situations.

Findings

The Augmented Epsilon-Constrained (AEC) method is employed to solve the proposed model for small-sized problem. Due to the NP-Hardness of the model, the NSGA-II and MOPSO metaheuristic algorithms are utilized to obtain efficient solutions for large-sized problems. The findings demonstrate the superiority of the MOPSO algorithm.

Practical implications

This study can be useful for emergency medical centers and healthcare companies in providing more effective responses to emergency situations by sending technicians and ambulances.

Originality/value

In this study, a two-objective mathematical model is developed for ambulance location and dispatch and solved by using the AEC method as well as the NSGA-II and MOPSO metaheuristic algorithms. The mathematical model encompasses three primary types of decision-making: (1) Allocating ambulances to bases after completing their service, (2) deciding to relocate the current ambulance among existing bases to potentially enhance response times to future emergencies and (3) considering the diverse abilities of technicians for accurate allocation to emergency situations.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 8 June 2023

Markus Brenner, Andreas Wald and Ronald Gleich

Process orientation is important for improving organizational performance. The process view is considered a key enabler of digital transformation, and thus management control…

Abstract

Purpose

Process orientation is important for improving organizational performance. The process view is considered a key enabler of digital transformation, and thus management control systems (MCS) are expected to incorporate this view. However, the existing body of knowledge is fragmented, as different process approaches are often considered independently following a reductionist view of control practices. This paper aims to provide recommendations for further research as well as guidance for practice by a systematic review of the state of research of MC for process orientation. It is based on both a comprehensive view to MC using an MCS package approach and a comprehensive view of process orientation.

Design/methodology/approach

A systematic literature review addressing major types of process orientation approaches was performed by applying the comprehensive MC framework of Malmi and Brown. The results were synthesized and propositions were developed.

Findings

All components of the MC framework, as well as MCS packages, are highly relevant for process orientation. Propositions regarding configurations of MC for process orientation show directions for future research. However, comprehensive considerations of packages and of individual components, especially cultural controls, remain scarce in the literature.

Originality/value

To the best of the authors‘ knowledge, this paper is the first of its kind to provide a comprehensive, structured overview of MC for process orientation, applying a nonreductionist view, based on an MCS Package approach, and consolidating the so far fragmented view of different process approaches.

Details

Journal of Accounting & Organizational Change, vol. 20 no. 2
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

461

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 April 2024

Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…

Abstract

Purpose

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.

Design/methodology/approach

To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance,  and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.

Findings

The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.

Originality/value

This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 21