Search results

1 – 10 of 11
Article
Publication date: 9 July 2021

Anish Banerjee and R. Ramesh Nayaka

The purpose of this paper is to investigate building information modelling (BIM) integrated Internet of Things (IoT) architectures extensively and provide comparative evaluation…

Abstract

Purpose

The purpose of this paper is to investigate building information modelling (BIM) integrated Internet of Things (IoT) architectures extensively and provide comparative evaluation of those against deciding parameters pertaining to their characteristics and subsequent applications in construction industry.

Design/methodology/approach

This paper identifies BIM-integrated cyber physical system frameworks, specific to project objectives, comprising of sensors working as physical assets and BIM-based virtual models acting as the cyber component , connected via wired or wireless protocols (e.g. WiFi, Zigbee, near-field communication, mobile-to-mobile, Zwave, 3 G, 4 G, long-term evolution, 5 G and low-power wide-area networks) and their potential applications in decision-making, visual management, logistics and supply chain management, smart building system management and structural performance assessment, etc. Such proposed architectures are evaluated against deciding parameters such as availability, reliability, mobility, performance, management, scalability, interoperability and security and privacy to evaluate their respective efficiencies.

Findings

This study finds that the underlying aim of planned IoT frameworks is to integrate systems and processes for a better information flow and to initiate shift from silo solutions to a smart ecosystem. The efficiencies of such frameworks are completely subjective to their respective project natures, objectives and requirements.

Originality/value

This study is unique in its nature to identify requirements of an efficient BIM-integrated IoT architecture and provide comprehensive insights about potential applications in construction industry.

Article
Publication date: 9 December 2019

Lei Zhu, Ming Shan and Zhao Xu

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage…

1055

Abstract

Purpose

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage, hindering the achievement of sustainable development of buildings. Therefore, the purpose of this paper is to review the building handover-related issues and research in construction and facility management (FM) journals. The specific objectives of this study include: analyze the research trends and overview the handover-related publications; identify the major research topics on the handover of buildings; identify research gaps and propose future research directions.

Design/methodology/approach

This study opted for a four-step systematic review of papers from the well-known academic journals in the construction and FM respects.

Findings

The results first revealed the increasing research interest in the handover of buildings from the researchers. Moreover, the post-construction defects, poor information fidelity, poor interoperability between building information modeling (BIM) and FM technologies, and insufficient consideration of end users were identified as the most concerned challenges for a building handover. Furthermore, identifying and formalizing information requirements for handover, improving the handover process, and improving the interoperability between BIM and FM were solutions mostly emphasized by researchers.

Research limitations/implications

As the first systematic review of building handover-related issues and research, this study is the building block for future research on this topic. The findings provide guidance for researchers in the construction and FM research community, and help them form useful collaboration for future research opportunities and find future research directions.

Practical implications

The identified significant challenges and potential solutions for a building handover could assist practitioners in making rational decisions on developing or adopting relevant technologies, and reshaping their management patterns and working processes. Moreover, the findings could be severed as evidence for policymakers to initiate policies, such as documents e-submission and timely updating BIMs, to achieve the vision of model-based project delivery.

Originality/value

This study contributed to the body of knowledge of sustainable development by providing a new insight to tackle the hindrance to the smooth transition from the construction to the operation.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 July 2020

Zul-Atfi Ismail

In general, maintenance management is considered as part of the construction sector for the larger service of post-construction activity and process. However, as green building…

Abstract

Purpose

In general, maintenance management is considered as part of the construction sector for the larger service of post-construction activity and process. However, as green building (GB) construction projects grow in scale and complexity, interconnections between the mentioned activities and processes can be noticed in a problematic planning performance management to monitor the GB components for the corrective and preventive maintenance action. Issues often arise during construction activity and pose a problem for the society due to the poor and improper maintenance execution, such as the recent fire in the Grenfell Tower (14 June 2017, about 80 fatalities).

Design/methodology/approach

The concept of maintenance management practices of GB and main features of Information and Communication Technology (ICT) tools and techniques were based on analysis of number of literature reviews in GB scenarios.

Findings

The research results described are concerned with an integrated system to analyse information and building a decision-making support in maintenance planning in GB based on robust data collection about concrete failures and causes, provide appropriate planning decision and reduce risks of GB failure throughout the lifetime.

Originality/value

The paper concludes that implementing a research framework for developing such a system can help improve the performance of maintenance planning of GB design, construction and maintenance operations.

Details

Smart and Sustainable Built Environment, vol. 10 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 February 2021

Joseph Kwame Ofori-Kuragu and Robert Osei-Kyei

The purpose of this paper is to explore the current state of popular modern methods of construction (MMC) and pre-manufactured construction in the construction industry and…

1234

Abstract

Purpose

The purpose of this paper is to explore the current state of popular modern methods of construction (MMC) and pre-manufactured construction in the construction industry and propose a framework for future implications for practice and future research.

Design/methodology/approach

This technical paper is based on a narrative review of the extant literature on the subject. First, the Scopus search engine was used to retrieve relevant papers on MMC, offsite and pre-manufactured construction. Second, institutional literature such as reports by industry professional and trade bodies, literature from leading technology firms and contractors with experience of MMC were extracted. These two strands of literature were synthesised and a comprehensive discussion on the topic was provided.

Findings

Results show that journal publications on MMC and pre-manufactured construction have increased in the past decade. The paper found significant advances in the development of premanufactured and offsite construction approaches with many benefits. Offsite and pre-manufactured construction are viable and sustainable systems currently suitable for wider adoption as the mainstream construction method.

Research limitations/implications

This technical paper based on an integrative review of relevant literature could have benefitted from interviews of professionals with experience of offsite and pre-manufacture techniques and from wider availability of current academic publications on the subject. Validation of the framework has not been undertaken.

Originality/value

Not much-published work has been undertaken on the current state of development globally and the viability of these construction approaches. This paper evaluates evidence from academic and industry sources to address this gap. A framework has been developed which can help the industry’s industrialisation drive.

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 1 December 2020

Zul-Atfi Ismail

Most green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless…

Abstract

Purpose

Most green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless, during maintenance planning of these materials, the focus is often directed towards comfort and design instead. However, as GB material construction projects grow in scale and complexity, interconnections between the activities and processes can be noticed during problematic planning performance management to monitor the GB material components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of GB material maintenance planning for sustainable development and the main features of information and communication technology tools and techniques are based on analysis of literature reviews of GB material scenarios.

Findings

The results show how decision-making support in maintenance planning can be unsuccessful and how planning decisions can frame the content of an integrated system to analyse information and reduce risks of GB material failure.

Originality/value

The paper concludes that implementing a research framework for developing such a system can help improve the sustainable performance of maintenance planning of GB material economic, social and environmental issues.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 4 August 2022

Zul-Atfi Ismail

The green building (GB) maintenance industry has been under increasing pressure by designers to demonstrate its evaluation and information management of building information…

Abstract

Purpose

The green building (GB) maintenance industry has been under increasing pressure by designers to demonstrate its evaluation and information management of building information modelling based model checking (BMC) to the competency's performance and design knowledge of building control instrument. This main problem has been termed as maintenance planning level. Although maintenance planning has been explored in GB maintenance environments, less is known about what maintenance planning problems currently exist and what their causes are, such as the recent fire in the Grenfell Tower (14 June 2017, about 80 fatalities) in North Kensington, West London. The aim of this paper is to identify how GB maintenance environments could integrate BMC within their processes. The purpose of this study is to assess the BMC technology management of GB maintenance ecosystem and that of a soft skills level to establish the impact of innovation policy features on database and safety risk function mechanism.

Design/methodology/approach

To achieve this aim, a comprehensive literature review of the existing conceptualisation of BMC practices is reviewed and the main features of Information and Communication Technology tools and techniques currently being employed on such GB maintenance ecosystem is carried out to evaluate the strengths and weaknesses of the previous studies. The conceptual framework explores the importance of integration of BMC in the construction phase to identify alternative methods in the automation system (AS) process to co-generate, monitor and optimise BMC.

Findings

The results confirm that BMC tool positively influences database application and risk mechanism of construction project safety while agreeableness negatively does. Besides, database application has a negative influence on innovation policy of company towards BMC implementation. Propositions derived not only shed light on guidance for future research on the soft skills of construction organisations, but also provide decision-making support through a better understanding of the factors affecting soft skills level amongst biggest construction companies.

Originality/value

Thus far, this study advances the knowledge about how GB maintenance environments can ensure BMC delivery. This paper highlights the need for further research to integrate BMC in GB maintenance environments validates the framework across the construction phase with different GB project managers and engineers.

Details

Open House International, vol. 47 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 2 March 2022

Zul-Atfi Bin Ismail

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research…

Abstract

Purpose

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research has mainly focused on theoretical models of acceptance in the green building (GB) maintenance industry. However, BIM has the potential to the competency’s performance and design knowledge of building control instrument. Realising this potential requires a study of BIM at the maintenance planning level, which is considered to be BIM-based model checking (BMC). BMC and its effect in the maintenance planning have not been sufficiently investigated.

Design/methodology/approach

The aim of this paper is to present a critical review of literature on the theoretical background of BMC practices and the main features of information and communication technology tools and techniques in the GB maintenance projects.

Findings

A theoretical framework of BMC is developed and presented. The proposed model incorporates requirement for maintaining a competency’s performance on maintenance planning schemes of GB projects and the importance of early integration of BMC in the design phase to identify alternative methods to cogenerate, monitor and optimise BMC.

Originality/value

It is found that variables facilitating BMC are integrated at different GB maintenance environments levels and are shaped by the context. Directions for future research are presented.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 March 2023

Zul-Atfi Ismail

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However…

Abstract

Purpose

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However, the performance competency and design knowledge of the practice's building control instrument process can be affected by its evaluation and the information management of building information modelling (BIM)–based model checking (BMC). These maintenance-planning problems have not yet been investigated in instances such as the Grenfell Tower fire (14 June 2017, approximately 80 fatalities) in North Kensington, West London.

Design/methodology/approach

This study proposes a theoretical framework for analysing the existing conceptualisation of BIM tools and techniques based on a critical review of GB maintenance environments. These are currently employed on GB maintenance ecosystems embedded in project teams that can affect BMC practices in the automation system process. In order to better understand how BMC is implemented in GB ecosystem projects, a quantitative case study is conducted in the Malaysian public works department (Jabatan Kerja Raya (JKR)).

Findings

GB ecosystem projects were not as effective as planned due to safety awareness, design planning, inadequate track insulation, environmental (in) compatibility and inadequate building access management. Descriptive statistics and an ANOVA were applied to analyse the data. The study is reinforced by a process flow, which is transformed into a theoretical framework.

Originality/value

Industry practitioners can use the developed framework to diagnose BMC application issues and leverage the staff competency inherent in an ecosystem to plan GB maintenance environments successfully.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 30 November 2004

Timothy K Shih, Ya‐Fung Chang, Hun‐Hui Hsu, Ying‐Hong Wang and Yung‐Hui Chen

Distance education has been an important research issue of multimedia computing and communication. Since the instructional activities are implemented on cyberspace, how to control…

Abstract

Distance education has been an important research issue of multimedia computing and communication. Since the instructional activities are implemented on cyberspace, how to control behaviors of students and to increase the degree of communication awareness have been a challenging issue. We propose a system based on the scaffolding theory. Behaviors of students are supervised by an intelligent control system, which is programmed by the instructor under our generic interface. The interface is built based on virtual reality and real‐time communication technologies. Students and instructors have their individual avatars that are controlled by a video game like navigation. Those behaviors that violate virtual campus regulations are detected and interceptive actions are performed. The proposed system is implemented on a Windows system and can be used for general purpose of distance education.

Details

Interactive Technology and Smart Education, vol. 1 no. 4
Type: Research Article
ISSN: 1741-5659

Keywords

1 – 10 of 11