Search results

1 – 10 of 849
Article
Publication date: 5 September 2023

Erica Smith

The aim of the paper is to examine whether there really is a shortage of VET teachers, and if so, whether there are links to the salary offered and to the qualifications required.

Abstract

Purpose

The aim of the paper is to examine whether there really is a shortage of VET teachers, and if so, whether there are links to the salary offered and to the qualifications required.

Design/methodology/approach

The paper uses three main approaches to examine the narrative of a shortage of VET teachers in Australia.

Findings

There was no documented evidence of a VET teacher shortage, beyond a general perception of shortage in line with other occupations due to the post-COVID economic recovery. Salaries for VET teachers were found to compare well with other education occupations and other jobs in the economy. There was no evidence of the required qualifications deterring entry. The main concern appears to be whether VET can adequately train workers for other sectors in shortage.

Research limitations/implications

The research did not include empirical survey work and suggests that this needs to be carried out urgently.

Practical implications

The research provides evidence that will challenge current assumptions and help in the recruitment of VET teachers.

Social implications

It argues for a recognition of the importance of the VET sector beyond its function of serving industry.

Originality/value

It highlights ways to make VET teaching a more attractive proposition and to better promote its advantages.

Details

Education + Training, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0040-0912

Keywords

Article
Publication date: 10 July 2023

Senuri Siriwardhana and Robert Moehler

Skills development among construction stakeholders has become an increasingly urgent necessity for the successful implementation of Construction 4.0 in recent years. There is a…

Abstract

Purpose

Skills development among construction stakeholders has become an increasingly urgent necessity for the successful implementation of Construction 4.0 in recent years. There is a lack of comprehensive analysis on the domain of Construction 4.0 implementation, with a focus on skills development. This study aims to address this gap through the use of the science mapping approach to show the gaps of research domain and propose future directions.

Design/methodology/approach

This study adopted a three-step holistic review approach, comprising bibliometric review, scientometric analysis, and qualitative discussion, to obtain a comprehensive overview of research in the field of Construction 4.0 skills development. f on a total of 57 articles published in three databases, the influential sources, keywords, scholars, and articles in the domain were analysed. A follow-up discussion aimed to identify main-stream research topics, research gaps, and future research directions.

Findings

Findings discovered that the topics were concerned about Construction 4.0 whilst skills development aspect was lacking in creation of policies, frameworks, strategies in different contexts. The study revealed research gaps such as presence of skills gaps and shortages in some countries, the lack of frameworks and roadmaps for successful Construction 4.0 implementation, and the lack of readiness assessments from professional, company and industry viewpoints.

Originality/value

This study contributes to the knowledge in the domain of Construction 4.0 and the contribution of skills development for its implementation and a comprehensive overview with research gaps and future research directions in the domain.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 August 2023

Oluseyi Julius Adebowale and Justus Ngala Agumba

Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business…

Abstract

Purpose

Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.

Design/methodology/approach

Qualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.

Findings

Challenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.

Practical implications

Contractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.

Originality/value

The causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 November 2023

Rebecca Kassa, Ibilola Ogundare, Brian Lines, Jake B. Smithwick, Nancy J. Kepple and Kenneth T. Sullivan

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially…

Abstract

Purpose

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially important given the current challenges in the construction workforce, including labor shortages, an aging workforce, generational differences in the workforce, supply chain disruptions and the need to effectively train staff in the skills that are essential in a constrained labor environment. To address these challenges, this study proposes a performance measurement strategy that construction companies can use as input to design their talent development programs.

Design/methodology/approach

The strategy intends to assess the performance of project managers and develop criteria that define categories of their performance, including the top performers' category. This enables construction organizations to provide each project manager with individualized training that addresses areas of weakness and in turn, develops the skills that correspond with being top performers. The proposed strategy was developed and tested by surveying the immediate supervisors of 187 project managers working for general and specialty contractors in the United States. Principal component analysis was used to develop a single performance construct from seven performance criteria.

Findings

This construct was used to organize the project managers into the categories of top, above-average and below-average performers. According to the findings, top-performing project managers have well-rounded skills in the areas of leadership, communication, technical proficiency and overall job knowledge.

Practical implications

The outcomes of this study can help construction organizations focus their talent-development programs on the skills most associated with PMs being top performers.

Originality/value

This study provides construction organizations with a comprehensive performance-measuring construct to focus their talent-development programs on the skills most associated with top-performing project managers. Researchers can use this study as a foundation for further understanding how performance is related to various construction professions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 December 2022

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, M.M.D.R. Deegahawature and Renuka Silva

Studies highlight that poor labour supervision and inadequate labour training facilities are the primary factors that result in labour skill shortages and productivity-related…

Abstract

Purpose

Studies highlight that poor labour supervision and inadequate labour training facilities are the primary factors that result in labour skill shortages and productivity-related challenges among construction firms. This study aims to assess the construction supervisors’ abilities in providing work-based training elements and evaluating labour skills in construction.

Design/methodology/approach

A construction supervisory training programme was newly designed with a set of labour training exercises using comprehensive approaches. A total of 64 construction supervisors were trained to deliver the labour training components for more than 250 labourers working on 23 construction projects in Sri Lanka. The supervisors’ competencies were assessed using a detailed marking guide developed through expert discussions and literature reviews.

Findings

The results show the detailed cross-section of a wide range of competencies of the construction supervisors in providing labour training elements with the levels of standards/descriptions. The generalisability of the study applications and the reliability of the results were ensured using statistical tests and expert reviews. The findings further describe the impacts of the well-improved competencies of construction supervisors on labour working patterns and work outputs.

Research limitations/implications

Though the study findings were limited to the Sri Lankan construction sector, the study applications can have a considerable impact on the current/future practices of the construction sector in developing countries as well as other developing industries.

Social implications

The study outcomes may contribute to a rapid increase in the number of construction supervisors becoming certified assessors of National Vocational Qualifications up to certain levels. This paper describes the further extensive implications and future scopes of the study elaborately.

Originality/value

The study adds new characteristics and values to construction supervision practices that can be remarkable in achieving higher levels of performance and productivity in labour operations. Importantly, the study contributes to adorning the job role of construction supervisors with the title of “labour training expert”.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 March 2024

Teslim Bamidele Balogun

This study aims to explore the opinions of Built Environment Professionals (BEP) on the usage of fourth-generation digital technologies in the construction industry.

Abstract

Purpose

This study aims to explore the opinions of Built Environment Professionals (BEP) on the usage of fourth-generation digital technologies in the construction industry.

Design/methodology/approach

This study adopts a qualitative research approach and conducts semi-structured interviews with Black, Asian and Minority Ethnic (BAME) professionals to explore the adoption and utilisation of fourth-generation digital technologies in the construction industry. The semi-structured interviews allowed the participants to elaborate on their experiences, and thematic analysis was employed to identify and analyse significant themes related to the topic.

Findings

Accounts from BAME construction professionals reveal that the increased popularity of fourth-generation digital technologies, also known as Industry 4.0 technologies, does not necessarily result in increased usage. This is because many of these new technologies have not been embraced and are unpopular in certain circles. A more significant revelation is the impact of BAME community settings on determining the career pathways of most individuals, which often do not support the construction or digital technology pathways within the construction industry.

Research limitations/implications

Research targeting ethnic minorities may not necessarily yield a large response due to the sensitivity of the issues raised. However, conducting a nationwide research with a larger sample size drawn from various locations in the UK could achieve more robust findings and uncover additional issues. Meanwhile, the results of this research can serve as a framework for more extensive investigations.

Practical implications

The research offers valuable recommendations to industry and academia regarding the need to address the specific challenges faced by the BAME community in terms of digital technology adoption. These issues are often overlooked in most discussions about digital technology.

Originality/value

The study provides critical recommendations that are relevant to Further and Higher Education (HE) institutions, industries, construction organisations, government bodies, etc. Recommendations include a call for collaboration between educational institutions, industry partners and local communities to facilitate awareness and orientation programmes within the community.

Details

Education + Training, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0040-0912

Keywords

Article
Publication date: 4 July 2023

Hanyue Yang, Heng Li, Guangbin Wang and Dongping Cao

Within the labor-intensive construction industry characterized by distinctly structural shortages in the labor force worldwide, efficient and effective migration of construction…

Abstract

Purpose

Within the labor-intensive construction industry characterized by distinctly structural shortages in the labor force worldwide, efficient and effective migration of construction workers across regions is critical for the smooth operation of construction activities. This study aims to investigate how the interregional migration patterns of construction workers are impacted by the disparities in both employment opportunities and environment amenities between the origin and destination provinces.

Design/methodology/approach

Drawing on the push and pull theory and the archival data on 13,728 migrant construction workers in China, descriptive analyses are first performed to characterize the interregional migration patterns of the investigated construction workers. Combining regional data in the National Bureau of Statistics of China, this study uses hierarchical regression modeling techniques to empirically test the relative importance of the employment-related and environment-related factors in driving the interregional migration of construction workers after controlling for the effects of related economic and geographic factors.

Findings

The results provide evidence that the interregional migration of construction workers is principally driven by the disparities in employment opportunities while disparities in environment amenities (including climate comfort disparity, medical service disparity and educational service disparity) generally play much fewer substantive roles. With regard to the impacts of employment opportunities, the results provide evidence that compared with the disparity in job market size, the disparities in job income and industry development level are more significantly relevant factors, which positively pull and adversely push the interregional migration flows, respectively.

Research limitations/implications

This study contributes to a deepened understanding of how workers specifically balance their employment and amenity needs to make temporary migration decisions in the “laggard” labor-intensive construction industry. This study also adds to the literature on population migration by characterizing the specific characteristics of construction workers and the temporary nature of the workers' migration activities. The findings hold important practical implications for construction organizations and policymakers for effectively managing the mobility of migrant construction workers.

Originality/value

The extant literature on migrant construction workers has primarily focused on the consequences of international migration and the generalization of empirical findings on population migration mechanisms in other domains to the construction industry is substantially limited by the specific characteristics of construction workers and the temporary nature of their migration activities. In addressing this gap, this study represents an exploratory effort to quantitatively characterize the interregional migration patterns of construction workers in the labor-intensive construction industry and examines the roles of employment opportunity and environmental amenity in driving interregional migration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 March 2024

Jayati Singh, Rupesh Kumar, Vinod Kumar and Sheshadri Chatterjee

The main aim of this study is to identify and prioritize the factors that influence the adoption of big data analytics (BDA) within the supply chain (SC) of the food industry in…

Abstract

Purpose

The main aim of this study is to identify and prioritize the factors that influence the adoption of big data analytics (BDA) within the supply chain (SC) of the food industry in India.

Design/methodology/approach

The study is carried out in two distinct phases. In the first phase, barriers hindering BDA adoption in the Indian food industry are identified. Subsequently, the second phase rates/prioritizes these barriers using multicriteria methodologies such as the “analytical hierarchical process” (AHP) and the “fuzzy analytical hierarchical process” (FAHP). Fifteen barriers have been identified, collectively influencing the BDA adoption in the SC of the Indian food industry.

Findings

The findings suggest that the lack of data security, availability of skilled IT professionals, and uncertainty about return on investments (ROI) are the top three apprehensions of the consultants and managers regarding the BDA adoption in the Indian food industry SC.

Research limitations/implications

This research has identified several reasons for the adoption of bigdata analytics in the supply chain management of foods in India. This study has also highlighted that big data analytics applications need specific skillsets, and there is a shortage of critical skills in this industry. Therefore, the technical skills of the employees need to be enhanced by their organizations. Also, utilizing similar services offered by other external agencies could help organizations potentially save time and resources for their in-house teams with a faster turnaround.

Originality/value

The present study will provide vital information to companies regarding roadblocks in BDA adoption in the Indian food industry SC and motivate academicians to explore this area further.

Details

British Food Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0007-070X

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 February 2024

Charlotte Meierdirk

Many veterans struggle with the civilian world and the loss of identity associated with leaving the service. This research investigates the Building Heroes Charity's role in…

Abstract

Purpose

Many veterans struggle with the civilian world and the loss of identity associated with leaving the service. This research investigates the Building Heroes Charity's role in assisting service leavers transitioning to civil employment, in the United Kingdom (UK) and what can be learnt from the training and support.

Design/methodology/approach

An exploratory case study design was chosen to investigate the transition from military to civilian employment. The case study consisted of 12 in-depth interviews consisting of nine veterans, who had attended the Building Heroes courses and three course tutors.

Findings

The Building Heroes Charity does have an important role to fulfill in the transition of military personnel from the service to civilian work. There are positive outcomes that complement the work done by the Career Transition Partnership (CTP), but there still needs to be recognition that the needs of veterans do differ by age, transferability of competencies and the financial resources available.

Research limitations/implications

The limitations of this research are the sample size is small and the majority of the veterans are from the Army. This is mostly because the Army is the largest of the services.

Originality/value

Though there is limited research into the employment of veterans, there is evidence to demonstrate that veterans are more likely to suffer from depression and potential homelessness than nonservice personnel. This research is unique in investigating the role of a charity whose main purpose is to improve the employability of veterans by reducing the competency skills gap between the military and construction industry.

Details

Education + Training, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0040-0912

Keywords

1 – 10 of 849