Search results

1 – 10 of 69
Article
Publication date: 3 October 2023

Renan Ribeiro Do Prado, Pedro Antonio Boareto, Joceir Chaves and Eduardo Alves Portela Santos

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in…

Abstract

Purpose

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in an integrated way so that these three elements combined result in a methodology called the Agile DMAIC cycle, which brings more agility and reliability in the execution of the Six Sigma process.

Design/methodology/approach

The approach taken by the authors in this study was to analyze the studies arising from this union of concepts and to focus on using PM tools where appropriate to accelerate the DMAIC cycle by improving the first two steps, and to test using the AHP as a decision-making process, to bring more excellent reliability in the definition of indicators.

Findings

It was indicated that there was a gain with acquiring indicators and process maps generated by PM. And through the AHP, there was a greater accuracy in determining the importance of the indicators.

Practical implications

Through the results and findings of this study, more organizations can understand the potential of integrating Six Sigma and PM. It was just developed for the first two steps of the DMAIC cycle, and it is also a replicable method for any Six Sigma project where data acquisition through mining is possible.

Originality/value

The authors develop a fully applicable and understandable methodology which can be replicated in other settings and expanded in future research.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 22 September 2021

Amna Farrukh, Sanjay Mathrani and Aymen Sajjad

Despite differing strategies towards environmental sustainability in developed and developing nations, the manufacturing sector in these regional domains faces substantial…

Abstract

Purpose

Despite differing strategies towards environmental sustainability in developed and developing nations, the manufacturing sector in these regional domains faces substantial environmental issues. The purpose of this study is to examine the green-lean-six sigma (GLSS) enablers and outcomes for enhancing environmental sustainability of manufacturing firms in both, a developed and developing country context by using an environment-centric natural resource-based view (NRBV).

Design/methodology/approach

First, a framework of GLSS enablers and outcomes aligned with the NRBV strategic capabilities is proposed through a systematic literature review. Second, this framework is used to empirically investigate the GLSS enablers and outcomes of manufacturing firms through in-depth interviews with lean six sigma and environmental consultants from New Zealand (NZ) and Pakistan (PK) (developed and developing nations).

Findings

Analysis from both regional domains highlights the use of GLSS enablers and outcomes under different NRBV capabilities of pollution prevention, product stewardship and sustainable development. A comparison reveals that NZ firms practice GLSS to comply with environmental regulatory requirements, avoid penalties and maintain their clean-green image. Conversely, Pakistani firms execute GLSS to reduce energy use, satisfy international customers and create a green image.

Practical implications

This paper provides new insights on GLSS for environmental sustainability which can assist industrial experts and academia for future strategies and research.

Originality/value

This is one of the early comparative studies that has used the NRBV to investigate GLSS enablers and outcomes in manufacturing firms for enhancing environmental performance comparing developed and developing nations

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 5 December 2023

Hao Wang and Yunna Liu

This study aims to construct a mental health service system for middle school students in the post-COVID-19 era with the framework of Six Sigma DMAIC (define, measure, analyze…

Abstract

Purpose

This study aims to construct a mental health service system for middle school students in the post-COVID-19 era with the framework of Six Sigma DMAIC (define, measure, analyze, improve and control) and analyze the influencing factors of the mental health service system to study the implementation strategies of quality-oriented mental health services in middle schools.

Design/methodology/approach

This study was conducted in Tianjin, China, from September to November 2022, and 350 middle school students from Tianjin Public Middle School were selected as subjects. A questionnaire survey was used to collect data. In this study, the Six Sigma DMAIC method, sensitivity analysis method, exploratory factor analysis and principal component analysis were used to analyze the mental health services provided to middle school students.

Findings

Based on the Six Sigma DMAIC framework, this study indicates that the contribution rate of the mental health service process factor is the largest in the post-COVID-19 era. The mental health cultivation factor ranks second in terms of its contribution. Mental health quality and policy factors are also important in the construction of middle school students’ mental health service system. In addition, the study highlights the importance of parental involvement and social support in student mental health services during the post-COVID-19 era.

Originality/value

To the best of the authors’ knowledge, a study on middle school students’ mental health in the post-Covid-19 era has not yet been conducted. This study developed a quality-oriented mental health system and analyzed the influencing factors of mental health for middle school students based on data analysis and the Six Sigma DMAIC method.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79278

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 4 October 2021

Adeel Akmal, Nataliya Podgorodnichenko, Richard Greatbanks, Jeff Foote, Tim Stokes and Robin Gauld

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims…

Abstract

Purpose

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims to present a concerted attempt to create a quality improvement maturity model (QIMM) derived from holistic principles underlying the successful implementation of system-wide QI programmes.

Design/methodology/approach

A hybrid methodology involving a systematic review (Phase 1) of over 270 empirical research articles and books developed the basis for the proposed QIMM. It was followed by expert interviews to refine the core constructs and ground the proposed QIMM in contemporary QI practice (Phase 2). The experts included academics in two academic conferences and 59 QI managers from the New Zealand health-care system. In-depth interviews were conducted with QI managers to ascertain their views on the QIMM and its applicability in their respective health organisations (HOs).

Findings

The QIMM consists of four dimensions of organisational maturity, namely, strategic, process, supply chain and philosophical maturity. These dimensions progress through six stages, namely, identification, ad-hoc, formal, process-driven, optimised enterprise and finally a way of life. The application of the QIMM by the QI managers revealed that the scope of QI and the breadth of the principles adopted by the QI managers and their HOs in New Zealand is limited.

Practical implications

The importance of QI in health systems cannot be overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality.

Originality/value

This paper contributes new knowledge by presenting a maturity model with an integrated set of quality principles for HOs and their extended supply networks.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 17 November 2021

Aqeel Ahmed, Sanjay Mathrani and Nihal Jayamaha

The aim of this paper is to explore the implementation of an integrated lean and ISO 14001 approach in meat industry for environmental performance and examine a proposed…

Abstract

Purpose

The aim of this paper is to explore the implementation of an integrated lean and ISO 14001 approach in meat industry for environmental performance and examine a proposed conceptual framework by capturing insights from lean and ISO 14001 experts in New Zealand (NZ).

Design/methodology/approach

Semi-structured interviews have been conducted with a group of consultants (lean and ISO 14001) to evaluate the suitability of an integrated lean and ISO 14001 approach in the meat industry for environmental performance. A conceptual framework from literature has guided this study leading to its further development based on the empirical evidence collected.

Findings

Findings have illustrated a synergistic positive impact of lean and ISO 14001 implementation as an integrated approach for sustaining environmental performance in the meat industry. A joint implementation program provides more clarity in aligning ISO 14001 operational procedures with lean tools and techniques for an enhanced environmental performance outcome.

Practical implications

The application of an integrated lean and ISO 14001 framework is proposed in this paper, which can help industry practitioners and academia in developing a joint implementation strategy and conducting future research.

Originality/value

To the best of the author’s knowledge, this study is the first to assess the effective implementation of lean and ISO 14001 as an integrated approach in the NZ meat industry.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 3 April 2024

Tatiana da Costa Reis Moreira, Daniel Luiz de Mattos Nascimento, Yelena Smirnova and Ana Carla de Souza Gomes dos Santos

This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for…

Abstract

Purpose

This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for employee occupational exams and address the real-world issue of high-variability exams that may arise.

Design/methodology/approach

This study uses mixed methods, combining qualitative and quantitative data collection. A detailed case study assesses the impact of LSS interventions on the exam management process and tests the applicability of the proposed LSS 4.0 framework for employee occupational exams.

Findings

The results reveal that changing the health service supplier in the explored organization caused a substantial raise in occupational exams, leading to increased costs. By using syntactic interoperability, lean, six sigma and DMAIC approaches, improvements were identified, addressing process deviations and information requirements. Implementing corrective actions improved the exam process, reducing the number of exams and associated expenses.

Research limitations/implications

It is important to acknowledge certain limitations, such as the specific context of the case study and the exclusion of certain exam categories.

Practical implications

The practical implications of this research are substantial, providing organizations with valuable managerial insights into improving efficiency, reducing costs and ensuring regulatory compliance while managing occupational exams.

Originality/value

This study fills a research gap by applying LSS 4.0 to occupational exam management, offering a practical framework for organizations. It contributes to the existing knowledge base by addressing a relatively novel context and providing a detailed roadmap for process optimization.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 11 October 2021

Achinthya Dharani Perera Halnetti, Nihal Jayamaha, Nigel Peter Grigg and Mark Tunnicliffe

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the…

Abstract

Purpose

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the USA in terms of LSS project definition, structure and practices.

Design/methodology/approach

In-depth investigation through case studies – 12 Australian/New Zealand cases and 4 US cases – on the implementation mechanisms of successful LSS initiatives.

Findings

A significant difference was found between Australasian and US definitions of an LSS project. However, firms in both regions followed similar project selection, initiating and execution practices. LSS reporting structures were found to be well-established in US organizations, but none of the Australasian organizations were found to be equipped with such a structure, although the effectiveness of LSS implementation success remained unaffected.

Research limitations/implications

Sufficient uniformity of LSS was found across two regions implying its usefulness/generalizability, but the findings are based only on 12 cases.

Originality/value

The paper provides the groundwork to develop a unique LSS model for Australasian organizations to improve processes in an effective and efficient manner.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of 69