Article
Publication date: 24 January 2022

Samin Mahdavian, Ming Lu and Estacio Pereira

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to…

Abstract

Purpose

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to correlate activity time, cost and safety in the context of construction activity acceleration planning. Two demonstration cases are presented to illustrate the proposed theoretical model in the context of critical activity expedition planning. Further, a third case uses a 100-activity project to perform the global level total project time and cost analysis, identifying specific activity acceleration plans that would materialize the shortened total project time at the lowest total project cost.

Design/methodology/approach

This research proposes a safety-centric application framework to guide construction acceleration planning at both activity and project levels while taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning while at the same time not compromising on safety. This research also addresses this critical question through performing global level total project time and cost analysis.

Findings

An application framework is proposed for guiding a planner through identifying accident shaping factors, obeying schedule acceleration rules and accounting for safety-related costs in attempts to mitigate hazardous situations on-site at both activity level (local) and project level (global), resulting in (1) minimizing the increase of total project cost in schedule acceleration while at the same time not compromising on safety at individual activities; (2) producing specific execution plans on each individual activity in terms of the amount of time to crash and the associated activity cost.

Originality/value

This study is original in developing theories and methods for evaluating the impact of safety constraints upon construction time and cost in activity acceleration planning and project time-cost analysis. The research fills a gap in knowledge in terms of how to factor in sufficient safety constraints while achieving project time and cost objectives on construction acceleration planning at both activity and project levels.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 April 2022

Niklas Rönnberg, Rasmus Ringdahl and Anna Fredriksson

The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can…

1131

Abstract

Purpose

The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can support visualization in construction planning to decrease construction transport disturbances.

Design/methodology/approach

This paper presents an interdisciplinary research project, combining research on construction logistics, internet of things and sonification. First, a data recording device, including sound, particle, temperature and humidity sensors, was implemented and deployed in a development project. Second, the collected data were used in a sonification design, which was, third, evaluated with potential users.

Findings

The results showed that the low-cost sensors used could capture “good enough” data, and that the use of sonification for representing these data is interesting and a possible useful tool in urban and construction transport planning.

Research limitations/implications

There is a need to further evolve the sonification design and better communicate the aim of the sounds used to potential users. Further testing is also needed.

Practical implications

This study introduces new ideas of how to support visualization with sonification planning the construction work and its impact on the vicinity of the site. Currently, urban planning and construction planning focus on visualizing the final result, with little focus on how to handle disturbances during the construction process.

Originality/value

Showing the potentials of using low-cost sensor data in sonification, and using sonification together with visualization, is the result of a novel interdisciplinary research area combination.

Details

Smart and Sustainable Built Environment, vol. 12 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 11 April 2024

Rafael Robina-Ramírez, Ángel Pizarro-Polo, José A. Folgado-Fernández and Agustín Santana-Talavera

The heritage and tourist attractiveness of Heritage Cities have aroused interest in establishing mechanisms to enhance their value based on the development of sustainability…

Abstract

Purpose

The heritage and tourist attractiveness of Heritage Cities have aroused interest in establishing mechanisms to enhance their value based on the development of sustainability policies. The socioeconomic and socioenvironmental valuation of these heritage sites has become a necessary tool for decision-making.

Design/methodology/approach

Following the recommendations of International Council on Monuments and Sites – ICOMOS, this paper proposes a series of indicators and an exploratory model to define the factors that contribute to their valuation. Following the partial least squares structural equation modelling methodology, information was obtained from 363 intramural residents in the three Heritage Cities that currently have management plans in Spain.

Findings

The results show the importance of specifying indicators of sustainable mobility and socioeconomic and socioenvironmental sustainability for an adequate valorisation of heritage sites.

Originality/value

To this end, it is necessary to follow the guidelines of international bodies such as ICOMOS in relation to the management plans.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Case study
Publication date: 19 October 2023

Bilgehan Bozkurt

The author employed a five-step approach: Data (e.g., qualitative primary and secondary data) collection (about a major project at the examined organisation), Critical thinking…

Abstract

Research methodology

The author employed a five-step approach: Data (e.g., qualitative primary and secondary data) collection (about a major project at the examined organisation), Critical thinking (in order to determine the dilemma), Setting learning objectives (e.g., with respect to the Bloom's taxonomy), Testing (in order to confirm the teaching plan) (e.g., with research assistants and doctoral candidates), and Ensuring clarity (e.g., especially for the case narrative).

Case overview/synopsis

The site manager at a UNESCO World Heritage Site by the name Ephesus in Türkiye (Turkey) was considering who would update the site management plan. UNESCO was regularly asking for updates. Would site management outsource the management plan from a firm? For example, the site management had had an outside firm develop the management plan and Ephesus had become a UNESCO World Heritage Site. Otherwise, would the site management rely on their own experience this time? Was there another way?

Complexity academic level

The educators could use the case study to introduce graduate students to “the value conception” in “marketing management” courses and to “the social exchange school of thought” in “marketing theory” courses. The learning objectives develop over the tension between owning and outsourcing main responsibilities of a scientific field as well as the tension between claims and objective evaluations. “The value conception” in “the social exchange school of thought” could improve planning in favour of humanity in a way that the United Nations could recognise (e.g., “value-based planning”). Corresponding discussions motivate a main question about the future: What is marketing for?

Details

The CASE Journal, vol. 20 no. 3
Type: Case Study
ISSN: 1544-9106

Keywords

Article
Publication date: 5 April 2022

M. Serhat Yenice and Emine Yagmur

The aim of this paper is to determine the scope and content for a holistic conservation and development strategies in the case of Gaziantep Rumkale. This approach seeks an answer…

Abstract

Purpose

The aim of this paper is to determine the scope and content for a holistic conservation and development strategies in the case of Gaziantep Rumkale. This approach seeks an answer to the question of “How can Rumkale archaeological heritage be preserved with their original values and passed on to future generations?”

Design/methodology/approach

The materials of the paper are based on field research and written and visual resource. The paper has been handled with a four-step method setup. The first stage is to examine the spatial and functional background of Rumkale and its immediate surroundings based on the historical development process. The second stage is to evaluate the upper- and lower-scale planning experiences of the heritage site. The third stage of the research methodology is strengths, weaknesses, opportunities, and threats (SWOT) analysis. The fourth stage is the creation of cultural heritage conservation-development strategies that define strategies for the protection and development of archaeological heritage in the context of sustainability.

Findings

The paper emphasizes the development of a holistic perspective that theoretically deals with the archaeological heritage sites of Rumkale together with the surrounding rural areas. In this context, the paper suggests ecological, spatial, socio-cultural, economic and institutional protection development strategies for the Rumkale archaeological site together with the surrounding rural areas for their delivery to future generations.

Originality/value

Although the area has an important cultural heritage value for different religions and cultures, it has not been subject to sufficient scientific research. The paper develops a holistic approach by considering Rumkale and its surroundings together.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 14 no. 2
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 16 January 2024

Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…

112

Abstract

Purpose

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.

Design/methodology/approach

The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.

Findings

The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.

Originality/value

While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 3 November 2022

Bruno Lot Tanko, Wyom Paul Zakka and Wee Nie Heng

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of…

562

Abstract

Purpose

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of BIM applications in reducing construction waste and enhancing productivity.

Design/methodology/approach

First, using 244 bibliographic data extracted from the Scopus database, the paper used scientometric analysis and VOSviewer mapping technique to assess the most impactful publication literature on BIM in Malaysia to identify the existing research gaps. Second, using a structured questionnaire, a total of 100 questionnaires were distributed to practising practitioners who incorporate BIM in the delivery of their projects. Descriptive analysis using cross-tabulation in SPSS software, radar chart, relative importance index and Pearson’s correlation were used to analyze the data.

Findings

The research gaps are in the fields of construction projects, buildings, energy efficiency, lifecycle and housing. The findings of the survey indicate that quantity take-off, clash detection, site utilization planning, digital fabrication as well as 4D stimulation were the main BIM applications used among the practitioners in Johor and Selangor.

Practical implications

By assessing the state-of-the-art of BIM and BIM applications in this region, the practical implications of this study provide useful insights to construction stakeholders, funding organizations, policymakers, research institutions, professionals, journal editors, reviewers and researchers to understand the overall trend of BIM in Malaysia and its usage.

Originality/value

This paper is the first to use science mapping using scientometrics to reveal the current BIM research in “Malaysia only”. Relying on the identified gaps, the study further examined the usage of BIM applications in Malaysian construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 December 2022

Eun Joo Park and Jin Baek

Correctional facilities often constitute locally unwanted land use (LULUs), with local residents strongly demanding their relocation. Accordingly, the construction of correctional…

Abstract

Purpose

Correctional facilities often constitute locally unwanted land use (LULUs), with local residents strongly demanding their relocation. Accordingly, the construction of correctional facilities is currently being promoted in regions that are far from city centres. Some local government officials consider relocating correctional facilities to rural areas as a golden opportunity to revitalise the economies of these areas. This paper focuses on the possibilities of local community participation in the sustainable development of prison siting in rural areas.

Design/methodology/approach

The methods and procedure of this study are as follows: (1) to review the relevant literature about regulations or cohesion policies when correctional facilities are constructed, (2) to examine the current issues relating to the conflict between correctional facilities and the local community from the perspective of LULUs and (3) to compare the construction processes of correctional facilities and public buildings in South Korea. The latter focuses on Daegu Correctional Facility as a site study through which to investigate how the facility interacted with the local community when the government decided to locate the correctional facility in a rural area.

Findings

The case study confirmed that communication methods between correctional facilities and stakeholders at each stage affected the occurrence and resolution of conflicts between them. In particular, it was found that correctional facilities in rural areas can transform the characteristics of the community by providing an open facility that serves community needs and boosts the local economy.

Originality/value

This study contributes to a new vision for locating correctional facilities, wherein conflicts are resolved through communication with local communities in rural regions. In addition, the study argues that community participation could allow correctional facilities to function as living hubs in the community and so benefit the residents of rural areas.

Article
Publication date: 8 March 2022

Roya Amiri, Javad Majrouhi Sardroud and Vahid Momenaei Kermani

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary…

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords