Search results

1 – 10 of over 1000
Article
Publication date: 28 November 2023

Edward Ti and Alvin See

Although the Singapore model of ethnic integration through its public housing programme is well known, the formula for replicating its success elsewhere remains underexplored…

Abstract

Purpose

Although the Singapore model of ethnic integration through its public housing programme is well known, the formula for replicating its success elsewhere remains underexplored. This study aims to identify the criteria for successful transplantation, specifically by identifying the housing tenure types that are most amenable to the implementation of the Singapore model.

Design/methodology/approach

Through a comparative study of two common law jurisdictions – Singapore and England – this article highlights the differences in their housing landscapes and how such differences impact upon the adoption of ethnic integration policies through housing. The article also unpacks, through a cross-disciplinary lens, the concepts of public housing and housing tenures, drawing heavily on socio-legal and housing literature.

Findings

The authors observe that the implementation of ethnic integration policies is best justified and most easily achieved in leasehold estates that exhibit a strong tenurial relationship with the state retaining a more than notional role. Public housing in Singapore being an exemplar of this model, the implementation of its ethnic integration policy is relatively straightforward. By contrast, the shrinking public housing sector in England means that adoption of a similar policy would have limited reach. Even then, the political–legal environment in England that promotes home ownership is potentially hostile to the adoption of such policy as it may be seen as an infringement of private property right.

Originality/value

The cross-jurisdiction comparison is supplemented by an interdisciplinary analysis that seeks to bridge differences in the categorisation of tenure in housing and law literatures so as to promote cross-disciplinary dialogue.

Details

Journal of Property, Planning and Environmental Law, vol. 16 no. 1
Type: Research Article
ISSN: 2514-9407

Keywords

Article
Publication date: 19 April 2024

Ka Ho Mok and Tual Sawn Khai

This study aims to fill this research gap by providing a comprehensive exploration of the transnationalization of higher education in China and Asia, with a particular focus on…

12

Abstract

Purpose

This study aims to fill this research gap by providing a comprehensive exploration of the transnationalization of higher education in China and Asia, with a particular focus on how institutions maintain quality assurance and how student learning experiences are reported.

Design/methodology/approach

The transnationalization of higher education involves educational programs and services provided by institutions or universities in a country other than their home country where students from diverse countries are trained. The goal of transnational education is to offer higher education to students who face obstacles in physically entering the host country of a transnational program, encourage globalization, enhance cross-cultural communication and improve the quality of education by expanding students' learning opportunities, providing diverse educational experiences and elevating academic standards. The transnationalization of higher education has become a crucial endeavor in Asia, especially in countries such as China, Malaysia and Singapore, where rapid economic development and globalization have prompted the need to evolve into knowledge-driven economies to meet the increasing demand for higher education. The factors driving the expansion of transnational higher education in China and Asia include the desire for top-quality education, the allure of international students, the establishment of worldwide collaborations and aspirations to be recognized as centers of academic distinction. The rapid expansion and increasing importance of transnational higher education has underscored the vital role of quality assurance. To guarantee educational quality, maintain institutional reputation and improve overall student outcomes, several agencies and frameworks have been established to uphold international standards.

Findings

Based upon extensive literature reveiw and case analysis, our findings indicated the quality assurance assessment varies and is primarily influenced by host countries and provider polices. However, students in transnational higher education programs report satisfaction with their experienes and the quality of their programs, which tends to meet their expecations.

Originality/value

This study presents the first comprehsensive literatrue rewiew and case analysis of how transnational higher education in China, Sinapore, Malaysia and Vietnam uphold quality assurance and report students learning experiences. Additionally, the findings highlight why future researceh on this topic is crucial and why forestering colloboration among countries in Asian regions is imporant in term of growing geo-politics.

Details

Asian Education and Development Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-3162

Keywords

Article
Publication date: 24 May 2022

Florence YY Ling and Elsie Kai Ying Mok

This study aims to investigate how to manage the stressors that facility managers (FMs) face with the aim of reducing their stress and strain levels.

Abstract

Purpose

This study aims to investigate how to manage the stressors that facility managers (FMs) face with the aim of reducing their stress and strain levels.

Design/methodology/approach

Using the job demands-resources (JD-R) model, stressors are operationalized from job demands, job resources and personal resources constructs. A structured questionnaire was used to collect data from FMs based in Singapore.

Findings

FMs have significantly high levels of stress, but they are able to manage this well. Job demands that cause stress and strain are those relating to insufficient time to complete the work and difficulties in handling the work. The lack of job resources in terms of lack of organizational support and inadequate stress mitigation programs are associated with high levels of stress and strain.

Research limitations/implications

The limitations are the relatively small sample size and absence of a database of FMs in Singapore, and correlation is not causation when determining the association between stressors and stress and strain.

Practical implications

Based on the recommendations, employers and FMs may manage the specific stressors identified so that FMs’ stress and strain levels are under control to enable them to work optimally.

Originality/value

This research discovered that the JD-R model is moderated by certain features of facilities management and FMs. When these features are present, FMs are predisposed to more stressors, and higher stress and strain. For the facilities management profession, the discovery is that there are significantly more job demands: for in-house FMs compared to those working for outsourced firms; for FMs who need to carry out estate and asset management, landlord activities and facility planning compared to FMs who focus on operations and maintenance; and for FMs who work longer than five days compared to those who work a five-day week.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 24 October 2022

Douglas Aghimien, Clinton Ohis Aigbavboa, Daniel W.M. Chan and Emmanuel Imuetinyan Aghimien

This paper presents the findings from the assessment of the determinants of cloud computing (CC) deployment by construction organisations. Using the…

Abstract

Purpose

This paper presents the findings from the assessment of the determinants of cloud computing (CC) deployment by construction organisations. Using the technology-organisation-environment (TOE) framework, the study strives to improve construction organisations' project delivery and digital transformation by adopting beneficial technologies like CC.

Design/methodology/approach

This study adopted a post-positivism philosophical stance using a deductive approach with a questionnaire administered to construction organisations in South Africa. The data gathered were analysed using descriptive and inferential statistics. Also, the fusion of structural equation modelling (SEM) and machine learning (ML) regression models helped to gain a robust understanding of the key determinants of using CC.

Findings

The study found that the use of CC by construction organisations in South Africa is still slow. SEM indicated that this slow usage is influenced by six technology and environmental factors, namely (1) cost-effectiveness, (2) availability, (3) compatibility, (4) client demand, (5) competitors' pressure and (6) trust in cloud service providers. ML models developed affirmed that these variables have high predictive power. However, sensitivity analysis revealed that the availability of CC and CC's ancillary technologies and the pressure from competitors are the most important predictors of CC usage in construction organisations.

Originality/value

The paper offers a theoretical backdrop for future works on CC in construction, particularly in developing countries where such a study has not been explored.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 February 2024

Udara Willhelm Abeydeera Lebunu Hewage, Jayantha Wadu Mesthrige and Eric G. Too

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Abstract

Purpose

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Design/methodology/approach

The current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.

Findings

The research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.

Research limitations/implications

The study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.

Originality/value

RM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 16 March 2023

Imoh Antai and Roland Hellberg

The total defence (TD) concept constitutes a joint endeavour between the military forces and civil defence structures within a TD state. Logistics is essential for such joint…

Abstract

Purpose

The total defence (TD) concept constitutes a joint endeavour between the military forces and civil defence structures within a TD state. Logistics is essential for such joint collaboration to work; however, the mismatch between military and civil defence logistics structures poses challenges for such joint collaboration. The purpose of this paper is to identify logistics concept areas within the TD framework that allow for military and civil defence collaborations from a logistics operations perspective.

Design/methodology/approach

Pattern-matching analysis is used to compare patterns found in the investigated case with those prescribed from the literature and predicted to occur. The study seeks to identify logistics concepts within TD from the literature and from the events describing the Swedish response to the Covid-19 pandemic. Pattern matching thus allows for the reconciliation of logistics concepts from the literature to descriptions of how the response was handled, albeit under a TD framework.

Findings

Findings show quite distinct foci between the theoretical and observational realms in terms of logistics applications. While the theoretical realm identifies four main logistics concepts, the observational realm identifies five logistics conceptual themes. This goes on to show an incongruence between the military and civil parts of the TD.

Research limitations/implications

This study provides basis for further research into the applications and management of logistics activity within TD and emergency response.

Originality/value

Logistics applications within TD have not, until now, received much attention in the literature. Given this knowledge gap, this study is of original value.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 14 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

461

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 3 April 2024

Abdul Kadir, La Husen Zuada and Muhammad Arsyad

This paper aims to investigate the relationships amongst career patterns, neutrality of the state civil apparatus, and organizational performance of the local government in South…

Abstract

Purpose

This paper aims to investigate the relationships amongst career patterns, neutrality of the state civil apparatus, and organizational performance of the local government in South Konawe District, Southeast Sulawesi Province in Indonesia.

Design/methodology/approach

Data were analyzed using Partial Least Squares Structural Equation Modeling (PLS-SEM) to investigate the relationships between variables through direct and indirect influence testing.

Findings

The findings reveal that career patterns influence neutrality and organizational performance. Neutrality of the state civil apparatus in politics mediates career patterns and local government organizational performance. The findings indicate that, first, promotions most significantly influence the organization’s neutrality and performance. Second, demotions have the least influence on the organization’s robustness and performance.

Originality/value

This paper is among the first to examine the relationships amongst career patterns, neutrality, and organizational performance. Recommendations are provided to improve neutrality and organizational performance, that is, the need to increase promotions and reduce demotions.

Details

Public Administration and Policy, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1727-2645

Keywords

1 – 10 of over 1000