Search results
1 – 10 of 13Chong Huang, Shilong Zhang and Hongshuo Zhang
The purpose of this study is to analyze the current situation of the competitiveness development of China’s marine industrial clusters, reveal the existing problems and…
Abstract
Purpose
The purpose of this study is to analyze the current situation of the competitiveness development of China’s marine industrial clusters, reveal the existing problems and challenges, provide theoretical support and practical guidance for improving the competitiveness of China’s marine industrial clusters so as to promote industrial upgrading and high-quality development and help China realize the strategic transformation from a marine power to a marine power.
Design/methodology/approach
This report first provides a detailed review of the current development status and existing issues of marine industry clusters in China. Second, it constructs an evaluation index system for the competitiveness development of China’s marine industry clusters and conducts competitiveness analysis and evaluation of typical marine industry clusters in China. Third, it explores the development trends and prospects of typical marine industry clusters in China. Finally, the report proposes countermeasures and suggestions for enhancing the competitiveness of marine industry clusters in China, focusing on resource optimization, cluster structure and cluster efficiency.
Findings
(1) Significant competitiveness of marine shipbuilding and ocean engineering equipment clusters: Through technological innovation and policy support, the marine shipbuilding and ocean engineering equipment clusters have shown a marked improvement in competitiveness, advancing toward high-quality development despite facing macroeconomic fluctuations. (2) Continuous improvement in marine energy and offshore wind power clusters: The competitiveness of marine energy and offshore wind power clusters has been continuously enhanced under supportive policies. However, there is still a need to optimize resource allocation and strengthen innovation stability to meet market challenges. (3) Strong growth potential of desalination and comprehensive utilization clusters: The desalination and comprehensive utilization clusters demonstrate robust growth potential in technological innovation and regional collaborative development. Future efforts should focus on the application of environmentally friendly and energy-saving technologies to ensure a balance between economic and ecological benefits.
Originality/value
By strengthening the competitiveness of industrial clusters, China can effectively respond to international competition, accelerate the transformation and upgrading of the marine industry and support its transition from a maritime power to a strong maritime nation. Hence, this study will focus on analyzing the competitiveness development of China’s marine industry clusters, identifying existing problems and challenges and providing theoretical support and practical guidance for enhancing the competitiveness of China’s marine industry clusters.
Details
Keywords
Shilong Zhang, Changyong Liu, Kailun Feng, Chunlai Xia, Yuyin Wang and Qinghe Wang
The swivel construction method is a specially designed process used to build bridges that cross rivers, valleys, railroads and other obstacles. To carry out this construction…
Abstract
Purpose
The swivel construction method is a specially designed process used to build bridges that cross rivers, valleys, railroads and other obstacles. To carry out this construction method safely, real-time monitoring of the bridge rotation process is required to ensure a smooth swivel operation without collisions. However, the traditional means of monitoring using Electronic Total Station tools cannot realize real-time monitoring, and monitoring using motion sensors or GPS is cumbersome to use.
Design/methodology/approach
This study proposes a monitoring method based on a series of computer vision (CV) technologies, which can monitor the rotation angle, velocity and inclination angle of the swivel construction in real-time. First, three proposed CV algorithms was developed in a laboratory environment. The experimental tests were carried out on a bridge scale model to select the outperformed algorithms for rotation, velocity and inclination monitor, respectively, as the final monitoring method in proposed method. Then, the selected method was implemented to monitor an actual bridge during its swivel construction to verify the applicability.
Findings
In the laboratory study, the monitoring data measured with the selected monitoring algorithms was compared with those measured by an Electronic Total Station and the errors in terms of rotation angle, velocity and inclination angle, were 0.040%, 0.040%, and −0.454%, respectively, thus validating the accuracy of the proposed method. In the pilot actual application, the method was shown to be feasible in a real construction application.
Originality/value
In a well-controlled laboratory the optimal algorithms for bridge swivel construction are identified and in an actual project the proposed method is verified. The proposed CV method is complementary to the use of Electronic Total Station tools, motion sensors, and GPS for safety monitoring of swivel construction of bridges. It also contributes to being a possible approach without data-driven model training. Its principal advantages are that it both provides real-time monitoring and is easy to deploy in real construction applications.
Details
Keywords
Mingming Xiao, Shilong Zhang, Yanbing Tang, Zhongmao Lin and Jiahong Chen
This study aims to explore the effect of corrosion monitoring technology for ensuring concrete structure safety.
Abstract
Purpose
This study aims to explore the effect of corrosion monitoring technology for ensuring concrete structure safety.
Design/methodology/approach
A new monitoring system scheme with unattended operation to evaluate the durability of concrete structures is presented, which includes four components, namely, a multi-function embedded sensor, a microprocessor data collecting module, a system data analysis and storage module, and a remote server module.
Findings
The system carries out monitoring of chloride ion concentration and pH in concrete, corrosion current density and of the self-corrosion potential of the reinforcing steel bar.
Originality/value
This system provides real-time, online, lossless monitoring for concrete structures.
Details
Keywords
Chinese espionage in Brussels.
Details
DOI: 10.1108/OXAN-DB250301
ISSN: 2633-304X
Keywords
Geographic
Topical
The Chinese military's Strategic Support Force.
Details
DOI: 10.1108/OXAN-DB247056
ISSN: 2633-304X
Keywords
Geographic
Topical
Lingzhi Li, Shilong Jiang, Jingfeng Yuan, Lei Zhang, Xiaoxiao Xu, Jing Wang, Yilun Zhou, Yunlong Li and Jin Xu
Existing hospital building operations involve numerous information technology applications and complex building systems; therefore, an intelligent facility management (FM…
Abstract
Purpose
Existing hospital building operations involve numerous information technology applications and complex building systems; therefore, an intelligent facility management (FM) platform is required to ensure their continuous operation. To address the persistent issues of data silos, inefficient data interoperability, and workflow incoordination that have been identified in the current body of FM practice and literature, the present study develops a data-asset (DA) centric FM platform specifically designed for hospital buildings.
Design/methodology/approach
This study proposes a semi-customized approach to develop the DA-centric FM platform for hospital buildings. To elucidate the precise function requirements of the hospital FM platform, focus group interviews are employed. By seamlessly integrating the as-built BIM model, IoT sensor data and FM workflow data, the BIM-based DA model with a data transfer mechanism is developed. The development of the FM platform with function modules in a case study is guided by a five-tier architecture and the coordination theory (CT). The case study provides an in-depth introduction to the applications of DA management, space management and maintenance management modules.
Findings
The capabilities of the developed DA-centric hospital FM platform are validated through the case application and user satisfaction survey, which assess data quality, automation level, operation efficiency, flexibility and functionality. For hospital FM activities, this DA-centric FM platform realizes data integration and seamless transformation, optimizes workflow coordination and enhances operation performance.
Originality/value
The initial scholarly contribution is the establishment of the BIM-based DA model, which serves as the data middle platform for continuous data integration, transmission and sharing within the FM platform. Subsequently, under the guidance of the CT, the business process of function modules is designed, improving the intra-module and inter-module workflow coordination. The developed DA-centric FM system along with its performance benchmarking application, assists facility managers and decision-makers in implementing smart operations for hospital buildings and achieving the management goals of safety, efficiency, energy savings and convenience.
Details
Keywords
Lixuan Jiang, Hua Zhong, Jianghong Chen, Jiajia Cheng, Shilong Chen, Zili Gong, Zhihui Lun, Jinhua Zhang and Zhenmin Su
The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the…
Abstract
Purpose
The construction industry is facing challenges not only for workers' mobility in the pandemic situation but also for Lean Construction (LC) practise in responding to the high-quality development during the post-pandemic. As such, this paper presents a construction workforce management framework based on LC to manage both the emergency goal in migrant worker management and the long-term goal in labour productivity improvement in China.
Design/methodology/approach
The framework is created based on the integrated culture and technology strategies of LC. A combination of qualitative and quantitative methods is taken to explore factors influencing the mobility of construction workers and to measure labour productivity improvement. The case study approach is adopted to demonstrate the framework application.
Findings
For method application, a time-and-motion study and Percent Plan Complete indicator are proposed to offer labour productivity measurements of “resources efficiency” and “flow efficiency”. Moreover, the case study provides an industry level solution for construction workforce management and Lean Construction culture shaping, as well as witnesses the LC culture and technology strategies alignment contributing to LC practise innovation.
Originality/value
Compared with previous studies which emphasised solely LC techniques rather than socio-technical system thinking, the proposed integration framework as well as implementation of “Worker's Home” and “Lean Work Package” management models in the COVID-19 pandemic contribute to new extensions of both the fundamental of knowledge and practise in LC.
Details
Keywords
Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang
The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…
Abstract
Purpose
The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.
Design/methodology/approach
A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.
Findings
1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.
Originality/value
NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.
Details
Keywords
Bingwei Gao, Hongjian Zhao, Wenlong Han and Shilong Xue
This study proposes a predictive neural network model reference decoupling control method for the coupling problem between the leg joints of hydraulic quadruped robots, and…
Abstract
Purpose
This study proposes a predictive neural network model reference decoupling control method for the coupling problem between the leg joints of hydraulic quadruped robots, and verifies its decoupling effect..
Design/methodology/approach
The machine–hydraulic cross-linking coupling is studied as the coupling behavior of the hydraulically driven quadruped robot, and the mechanical dynamics coupling force of the robot system is controlled as the disturbance force of the hydraulic system through the Jacobian matrix transformation. According to the principle of multivariable decoupling, a prediction-based neural network model reference decoupling control method is proposed; each module of the control algorithm is designed one by one, and the stability of the system is analyzed by the Lyapunov stability theorem.
Findings
The simulation and experimental research on the robot joint decoupling control method is carried out, and the prediction-based neural network model reference decoupling control method is compared with the decoupling control method without any decoupling control method. The results show that taking the coupling effect experiment between the hip joint and knee joint as an example, after using the predictive neural network model reference decoupling control method, the phase lag of the hip joint response line was reduced from 20.3° to 14.8°, the amplitude attenuation was reduced from 1.82% to 0.21%, the maximum error of the knee joint coupling line was reduced from 0.67 mm to 0.16 mm and the coupling effect between the hip joint and knee joint was reduced from 1.9% to 0.48%, achieving good decoupling.
Originality/value
The prediction-based neural network model reference decoupling control method proposed in this paper can use the neural network model to predict the next output of the system according to the input and output. Finally, the weights of the neural network are corrected online according to the predicted output and the given reference output, so that the optimization index of the neural network decoupling controller is extremely small, and the purpose of decoupling control is achieved.
Details
Keywords
There are a large number of interdependent risk factors in complex project. Risk response strategy without considering risk correlation cannot achieve good risk response…
Abstract
Purpose
There are a large number of interdependent risk factors in complex project. Risk response strategy without considering risk correlation cannot achieve good risk response. Therefore, the purpose of this paper is to propose a risk response strategy selection model considering risk correlation based on the grey K-shell algorithm.
Design/methodology/approach
This paper mainly focuses on the measurement of two aspects of risk factors. One is the ability of the risk factors to influence other risk factors, another is the degree affected by other risk factors. Both of the above are measured by the grey K-shell algorithm improved in this paper, and the weights of these are used for the constructing of risk response strategy selection model.
Findings
The risk response strategy considering risk relevance is more effective than the risk response strategy without considering risk relevance. Also, results indicate that as the risk response budget increases the risk response effect also increases, and the increasing trend is weakens. The relative gap between the effect of response strategies considering risk relevance and the strategy without considering risk relevance increases first and, then, decreases with the increase of budget.
Originality/value
The results of this paper demonstrate that the risk response strategy considering risk relevance is more effective than not considering risk relevance. The approach presented in this paper can guide project managers’ risk decisions and may also help to find the best risk response budget.
Details