Search results

1 – 1 of 1
Article
Publication date: 31 August 2022

Saba Mani, Navid Ahmadi Eftekhari, M. Reza Hosseini and Javad Bakhshi

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Abstract

Purpose

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Design/methodology/approach

This paper relies on grounded theory and data collection from two case studies – one in the public sector and one in the private sector – and is underpinned by Leavitt’s (1964) sociotechnical model.

Findings

Findings reveal four new dimensions of stakeholder management as being affected through BIM-induced changes: commitment; transparency; learning and experience; and stakeholder satisfaction, with these extending beyond the dimensions recognised in the existing literature. Another novelty lies in bringing to light the highly context-specific nature of BIM-induced changes pertinent to stakeholder management, with the two case studies demonstrating differences in these changes. Furthermore, a theoretical model of the causal impacts of various identified dimensions is presented, in which the sequence of changes and the causal associations between the identified dimensions are conceptualised.

Originality/value

Through Leavitt’s (1964) Diamond lens, the procedure of change and its evolutionary procedure for various components of the sociotechnical system of stakeholder management are theorised. The tentative conceptualisations presented offer a springboard from which to further investigate the episode of change pertinent to various dimensions of stakeholder management in BIM-enabled projects.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Access

Year

Last month (1)

Content type

1 – 1 of 1