Search results

1 – 9 of 9
Article
Publication date: 26 January 2024

Chris Rees

The article considers the utility of a pluralist perspective in the context of current debates around UK corporate governance reform. Oxford School pluralism advanced both a…

Abstract

Purpose

The article considers the utility of a pluralist perspective in the context of current debates around UK corporate governance reform. Oxford School pluralism advanced both a description of how industrial relations (IR) operated in practice plus a prescription for how it should operate. Whilst economic conditions are different today, a pluralist framing provides not only a useful way of understanding interests in firm governance (description) but also a solid grounding for a pragmatic reform agenda (prescription).

Design/methodology/approach

Drawing from key texts in the field, the article considers core concepts within pluralist discourse and discusses their relevance to contemporary policy debates.

Findings

The article provides a short outline of recent economic and political developments and considers how a pluralist framing helps explain firm-level interests, challenging the dominant narrative of shareholder primacy. It then asks what policy interventions might flow from this analysis of capital and labour investments, and how feasible they are in the current UK context. This allows a discussion of levels of analysis (evident in materialist theories such as “radical pluralism” and the “disconnected capitalism thesis”). Finally, it reflects briefly on the links between corporate governance and wider patterns of inequality, suggesting the pluralist position is consistent with a Durkheimian sociology focusing on the potential in state-led regulatory interventions to tackle anomie and strengthen social solidarity.

Originality/value

The article brings together literature from what are often treated as relatively discrete areas of enquiry (employment relations and corporate governance) and also considers the public policy implications of these connections.

Details

Employee Relations: The International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0142-5455

Keywords

Article
Publication date: 4 December 2023

Ahmed M. Attia, Ahmad O. Alatwi, Ahmad Al Hanbali and Omar G. Alsawafy

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Abstract

Purpose

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Design/methodology/approach

A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.

Findings

It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.

Research limitations/implications

The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.

Practical implications

Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.

Originality/value

This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 24 November 2023

Iman Rastgar, Javad Rezaeian, Iraj Mahdavi and Parviz Fattahi

The purpose of this study is to propose a new mathematical model that integrates strategic decision-making with tactical-operational decision-making in order to optimize…

Abstract

Purpose

The purpose of this study is to propose a new mathematical model that integrates strategic decision-making with tactical-operational decision-making in order to optimize production and scheduling decisions.

Design/methodology/approach

This study presents a multi-objective optimization framework to make production planning, scheduling and maintenance decisions. An epsilon-constraint method is used to solve small instances of the model, while new hybrid optimization algorithms, including multi-objective particle swarm optimization (MOPSO), non-dominated sorting genetic algorithm, multi-objective harmony search and improved multi-objective harmony search (IMOHS) are developed to address the high complexity of large-scale problems.

Findings

The computational results demonstrate that the metaheuristic algorithms are effective in obtaining economic solutions within a reasonable computational time. In particular, the results show that the IMOHS algorithm is able to provide optimal Pareto solutions for the proposed model compared to the other three algorithms.

Originality/value

This study presents a new mathematical model that simultaneously determines green production planning and scheduling decisions by minimizing the sum of the total cost, makespan, lateness and energy consumption criteria. Integrating production and scheduling of a shop floor is critical for achieving optimal operational performance in production planning. To the best of the authors' knowledge, the integration of production planning and maintenance has not been adequately addressed.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 9 October 2023

Mingyao Sun and Tianhua Zhang

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…

Abstract

Purpose

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.

Design/methodology/approach

The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.

Findings

The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.

Originality/value

This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8500

Keywords

Article
Publication date: 3 January 2023

Nurcan Deniz and Feristah Ozcelik

Although disassembly balancing lines has been studied for over two decades, there is a gap in the robotic disassembly. Moreover, combination of problem with heterogeneous employee…

Abstract

Purpose

Although disassembly balancing lines has been studied for over two decades, there is a gap in the robotic disassembly. Moreover, combination of problem with heterogeneous employee assignment is also lacking. The hazard related with the tasks performed on disassembly lines on workers can be reduced by the use of robots or collaborative robots (cobots) instead of workers. This situation causes an increase in costs. The purpose of the study is to propose a novel version of the problem and to solve this bi-objective (minimizing cost and minimizing hazard simultaneously) problem.

Design/methodology/approach

The epsilon constraint method was used to solve the bi-objective model. Entropy-based Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) and Preference Ranking Organization methods for Enrichment Evaluation (PROMETHEE) methods were used to support the decision-maker. In addition, a new criterion called automation rate was proposed. The effects of factors were investigated with full factor experiment design.

Findings

The effects of all factors were found statistically significant on the solution time. The combined effect of the number of tasks and number of workers was also found to be statistically significant.

Originality/value

In this study, for the first time in the literature, a disassembly line balancing and employee assignment model was proposed in the presence of heterogeneous workers, robots and cobots to simultaneously minimize the hazard to the worker and cost.

Article
Publication date: 17 October 2023

Derya Deliktaş and Dogan Aydin

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the…

Abstract

Purpose

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the general problem and has still attracted the attention of researchers. The type-I simple assembly line balancing problems (SALBP-I) aim to minimise the number of workstations on an assembly line by keeping the cycle time constant.

Design/methodology/approach

This paper focuses on solving multi-objective SALBP-I problems by utilising an artificial bee colony based-hyper heuristic (ABC-HH) algorithm. The algorithm optimises the efficiency and idleness percentage of the assembly line and concurrently minimises the number of workstations. The proposed ABC-HH algorithm is improved by adding new modifications to each phase of the artificial bee colony framework. Parameter control and calibration are also achieved using the irace method. The proposed model has undergone testing on benchmark problems, and the results obtained have been compared with state-of-the-art algorithms.

Findings

The experimental results of the computational study on the benchmark dataset unequivocally establish the superior performance of the ABC-HH algorithm across 61 problem instances, outperforming the state-of-the-art approach.

Originality/value

This research proposes the ABC-HH algorithm with local search to solve the SALBP-I problems more efficiently.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 13 February 2024

Wenqi Mao, Kexin Ran, Ting-Kwei Wang, Anyuan Yu, Hongyue Lv and Jieh-Haur Chen

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for…

Abstract

Purpose

Although extensive research has been conducted on precast production, irregular component loading constraints have received little attention, resulting in limitations for transportation cost optimization. Traditional irregular component loading methods are based on past performance, which frequently wastes vehicle space. Additionally, real-time road conditions, precast component assembly times, and delivery vehicle waiting times due to equipment constraints at the construction site affect transportation time and overall transportation costs. Therefore, this paper aims to provide an optimization model for Just-In-Time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time.

Design/methodology/approach

In order to propose a JIT (just-in-time) delivery optimization model, the effects of the sizes of irregular precast components, the assembly time, and the loading methods are considered in the 3D loading constraint model. In addition, for JIT delivery, incorporating real-time road conditions in the transportation process is essential to mitigate delays in the delivery of precast components. The 3D precast component loading problem is solved by using a hybrid genetic algorithm which mixes the genetic algorithm and the simulated annealing algorithm.

Findings

A real case study was used to validate the JIT delivery optimization model. The results indicated this study contributes to the optimization of strategies for loading irregular precast components and the reduction of transportation costs by 5.38%.

Originality/value

This study establishes a JIT delivery optimization model with the aim of reducing transportation costs by considering 3D loading constraints, real-time road conditions and assembly time. The irregular precast component is simplified into 3D bounding box and loaded with three-space division heuristic packing algorithm. In addition, the hybrid algorithm mixing the genetic algorithm and the simulated annealing algorithm is to solve the 3D container loading problem, which provides both global search capability and the ability to perform local searching. The JIT delivery optimization model can provide decision-makers with a more comprehensive and economical strategy for loading and transporting irregular precast components.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 December 2023

Zihan Dang and Naiming Xie

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and…

Abstract

Purpose

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and capacity forecasting the most troublesome problems for production managers. In this paper, uncertain man-hours are represented as interval grey numbers, and the optimization problem of production line balance in the case of interval grey man-hours is studied to better evaluate the production line capacity.

Design/methodology/approach

First, this paper constructs the basic model of assembly line balance optimization for the single-product scenario, and on this basis constructs an assembly line balance optimization model under the multi-product scenario with the objective function of maximizing the weighted greyscale production line balance rate, second, this paper designs a simulated annealing algorithm to solve problem. A neighborhood search strategy is proposed, based on assembly line balance optimization, an assembly line capacity evaluation method with interval grey man-hour characteristics is designed.

Findings

This paper provides a production line balance optimization scheme with uncertain processing time for multi-product scenarios and designs a capacity evaluation method to provide managers with scientific management strategies so that decision-makers can scientifically solve the problems that the company's design production line is quite different from the actual production situation.

Originality/value

There are few literary studies on combining interval grey number with assembly line balance optimization. Therefore, this paper makes an important contribution in this regard.

Details

Grey Systems: Theory and Application, vol. 14 no. 2
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 25 October 2022

Narinder Kumar, Bikram Jit Singh and Pravin Khope

Inventory models are quantitative ways of calculating low-cost operating systems. These models can be either deterministic or stochastic. A deterministic model hypothesizes…

Abstract

Purpose

Inventory models are quantitative ways of calculating low-cost operating systems. These models can be either deterministic or stochastic. A deterministic model hypothesizes variable quantities like demand and lead time, as certain. However, various types of research have revealed that the value of demand and lead time is still ambiguous and vary unanimously. The main purpose of this research piece is to reduce the uncertainties in such a dynamic environment of Industry 4.0.

Design/methodology/approach

The current study tackles the multiperiod single-item inventory lot-size problem with varying demands. The three lot sizing policies – Lot for Lot, Silver–Meal heuristic and Wagner–Whitin algorithm – are reviewed and analyzed. The suggested machine learning (ML)–based technique implies the criteria, when and which of these inventory models (with varying demands and safety stock) are best fit (or suitable) for economical production.

Findings

When demand surpasses a predicted value, variance in demand comes into the picture. So the current work considers these things and formulates the proper lot size, which can fix this dynamic situation. To deduce sufficient lot size, all three considered stochastic models are explored exclusively, as per respective protocols, and have been analyzed collectively through suitable regression analysis. Further, the ML-based Classification And Regression Tree (CART) algorithm is used strategically to predict which model would be economical (or have the least inventory cost) with continuously varying demand and other inventory attributes.

Originality/value

The ML-based CART algorithm has rarely been seen to provide logical assistance to inventory practitioners in making wise-decision, while selecting inventory control models in dynamic batch-type production systems.

1 – 9 of 9