Article
Publication date: 16 August 2022

Zhijiang Wu and Guofeng Ma

The purpose of this study is to automatically generate a construction schedule by extracting data from the BIM (Building Information Modeling) model and combining an ontology…

Abstract

Purpose

The purpose of this study is to automatically generate a construction schedule by extracting data from the BIM (Building Information Modeling) model and combining an ontology constraint rule and a genetic algorithm (GA).

Design/methodology/approach

This study developed a feasible multi-phase framework to generate the construction schedule automatically through extracting information from the BIM, utilizing the ontology constraint rule to demonstrate the relationships between all the components and finally using the GA to generate the construction schedule.

Findings

To present the functionality of the framework, a prototype case is adopted to show the whole procedure, and the results show that the scheme designed in this study can quickly generate the schedule and ensure that it can satisfy the requirements of logical constraints and time parameter constraints.

Practical implications

A proper utilization of conceptual framework can contribute to the automatic generation of construction schedules and significantly reduce manual errors in the Architectural, Engineering, and Construction (AEC) industry. Moreover, a scheme of BIM-based ontology and GA for construction schedule generation may reduce additional manual work and improve schedule management performance.

Social implications

The hybrid approach combines the ontology constraint rule and GA proposed in this study, and it is an effective attempt to generate the construction schedule, which provides a direct indicator for the schedule control of the project.

Originality/value

In this study, the data application process of the BIM model is divided into four modules: extraction, processing, optimization, and output. The key technologies including secondary development, ontology theory, and GA are introduced to develop a multi-phase framework for the automatic generation of the construction schedule and to realize the schedule prediction under logical constraints and duration interference.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 January 2021

Mohamed ElMenshawy and Mohamed Marzouk

Nowadays, building information modeling (BIM) represents an evolution in the architecture, engineering and construction (AEC) industries with its various applications. BIM is…

1032

Abstract

Purpose

Nowadays, building information modeling (BIM) represents an evolution in the architecture, engineering and construction (AEC) industries with its various applications. BIM is capable to store huge amounts of information related to buildings which can be leveraged in several areas such as quantity takeoff, scheduling, sustainability and facility management. The main objective of this research is to establish a model for automated schedule generation using BIM and to solve the time–cost trade-off problem (TCTP) resulting from the various scenarios offered to the user.

Design/methodology/approach

A model is developed to use the quantities exported from a BIM platform, then generate construction activities, calculate the duration of each activity and finally the logic/sequence is applied in order to link the activities together. Then, multiobjective optimization is performed using nondominated sorting genetic algorithm (NSGA-II) in order to provide the most feasible solutions considering project duration and cost. The researchers opted NSGA-II because it is one of the well-known and credible algorithms that have been used in many applications, and its performances were tested in several comparative studies.

Findings

The proposed model is capable to select the near-optimum scenario for the project and export it to Primavera software. A case study is worked to demonstrate the use of the proposed model and illustrate its main features.

Originality/value

The proposed model can provide a simple and user-friendly model for automated schedule generation of construction projects. In addition, opportunities related to the interface between an automated schedule generation model and Primavera software are enabled as Primavera is one of the most popular and common schedule software solutions in the construction industry. Furthermore, it allows importing data from MS Excel, which is used to store activities data in the different scenarios. In addition, there are numerous solutions, each one corresponds to a certain duration and cost according to the performance factor which often reflects the number of crews assigned to the activity and/or construction method.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 December 2020

Zhen Zhao, Zhiyong Fan, Yigang Sun and Zhexu Liu

In modern integrated modular avionics (IMA), it plays an important role to guarantee safety and reliability of the system. The safety and reliability of communication scheduling

Abstract

Purpose

In modern integrated modular avionics (IMA), it plays an important role to guarantee safety and reliability of the system. The safety and reliability of communication scheduling plays a crucial role in this IMA platforms-based network system. To verify the safety and reliability of the communication scheduling in this network, sufficient and typical test data must be generated to input into the network, obtain and evaluate the corresponding output.

Design/methodology/approach

To generate communication scheduling data, this paper presents an iterative communication scheduling data generation algorithm for a configured network of IMA platforms. First, the algorithm generates all possible communication schedules for the first timestamp. Then, constraint is introduced to decrease the quantity of communication schedules to improve the efficiency. The communication schedules are gradually extended to the second timestamp until the final timestamp, i.e. length of communication scheduling sequence.

Findings

To verify the efficiency and feasibility of the algorithm, a model is built based on the architecture analysis and design language (AADL) by mapping the correlation time of generated communication scheduling data into task properties. Schedulability is analyzed by loading this model into AADL Inspector. The simulation result illustrates that the proposed algorithm is efficient and feasible.

Practical implications

The proposed method can provide data support for communication scheduling test for the network of IMA platforms.

Originality/value

A constraint-based iterative communication scheduling data generation algorithm is proposed for the network of IMA platforms automatically.

Details

Aircraft Engineering and Aerospace Technology, vol. 93 no. 1
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 28 June 2011

Yajvender Pal Verma and Ashwani Kumar

With the inclusion of significant wind power into the power system, the unit commitment (UC) has become challenging due to frequent variations in wind power, load and requirement…

Abstract

Purpose

With the inclusion of significant wind power into the power system, the unit commitment (UC) has become challenging due to frequent variations in wind power, load and requirement of reserves with sufficient ramp rate. The pumped storage units with lesser startup time and cost can take care of these sudden variations and reduce their impact on power system operation. The aim of this paper is to provide a solution model for UC problem in a hybrid power system.

Design/methodology/approach

The model developed has been implemented through GAMS optimization tool with CONOPT solver. The model has been called into MATLAB platform by using GAMS‐MATLAB interfacing to obtain solutions.

Findings

The model provides an efficient operating schedule for conventional units and pumped storage units to minimize operating cost and emission. The effects of wind power and load profiles on emission, operating cost and reserve with enough ramping capabilities have been minimized with the use of pumped storage unit. The commitment schedule of thermal and pumped storage units have been obtained with significant wind power integrated into the system for best cost commitment (BCC) and for a combined objective of cost and emission minimization.

Originality/value

This paper finds that the operating cost and emission in a commitment problem can be reduced significantly during variable wind and load conditions in a hybrid system. The model proposed provides operational schedules of conventional and pumped storage units with variable wind power and load conditions throughout operating horizon. The coordinated optimization approach has been implemented on a hybrid system with IEEE‐30 bus system.

Details

International Journal of Energy Sector Management, vol. 5 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 7 December 2021

Kalyan Sagar Kadali, Moorthy Veeraswamy, Marimuthu Ponnusamy and Viswanatha Rao Jawalkar

The purpose of this paper is to focus on the cost-effective and environmentally sustainable operation of thermal power systems to allocate optimum active power generation

49

Abstract

Purpose

The purpose of this paper is to focus on the cost-effective and environmentally sustainable operation of thermal power systems to allocate optimum active power generation resultant for a feasible solution in diverse load patterns using the grey wolf optimization (GWO) algorithm.

Design/methodology/approach

The economic dispatch problem is formulated as a bi-objective optimization subjected to several operational and practical constraints. A normalized price penalty factor approach is used to convert these objectives into a single one. The GWO algorithm is adopted as an optimization tool in which the exploration and exploitation process in search space is carried through encircling, hunting and attacking.

Findings

A linear interpolated price penalty model is developed based on simple analytical geometry equations that perfectly blend two non-commensurable objectives. The desired GWO algorithm reports a new optimum thermal generation schedule for a feasible solution for different operational strategies. These are better than the earlier reports regarding solution quality.

Practical implications

The proposed method seems to be a promising optimization tool for the utilities, thereby modifying their operating strategies to generate electricity at minimum energy cost and pollution levels. Thus, a strategic balance is derived among economic development, energy cost and environmental sustainability.

Originality/value

A single optimization tool is used in both quadratic and non-convex cost characteristics thermal modal. The GWO algorithm has discovered the best, cost-effective and environmentally sustainable generation dispatch.

Details

COMPEL - The international journal for computation and mathematics in electrical and electronic engineering , vol. 41 no. 1
Type: Research Article
ISSN: 0332-1649

Keywords

Article
Publication date: 23 November 2010

S. Subramanian and S. Ganesan

The purpose of this paper is to solve commitment problem of generating units in thermal power plants and to find the optimal dispatches of the committed units.

Abstract

Purpose

The purpose of this paper is to solve commitment problem of generating units in thermal power plants and to find the optimal dispatches of the committed units.

Design/methodology/approach

The unit commitment (UC) problem has been solved in two stages. In the first stage, the optimal units are identified using contribution factor. Initially, the generating units to be committed for each interval in the time horizon are obtained without considering the unit operational constraints such as minimum up time, minimum down time and initial state. Then the unit operational constraints are enforced and the optimal UC schedule is obtained. In the second stage, sequential approach with a matrix framework has been proposed to obtain the optimal dispatches of the committed units.

Findings

The simple methodologies have been developed for unit selection and to find the optimal dispatches of the committed units. The results of proposed methodology illustrate an improvement in the savings of total cost. The proposed approach is computationally efficient for solving large‐scale systems and successive UC problems.

Research limitations/implications

UC has a major role in electric thermal power plant operation. The problem with one day and one week scheduling horizon has a large potential of use, especially for small‐ and medium‐scale power systems. It reflects reality in a closer way and provides a more complete and realistic knowledge about the system in operation. The techniques developed for UC problem will provide a support to electric power companies for their economic operation and the concepts presented are useful in both graduate teaching and research to understand the UC problem.

Originality/value

The contribution of the paper is the simple methodologies which have been developed for unit selection and economic dispatch.

Details

International Journal of Energy Sector Management, vol. 4 no. 4
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 20 March 2023

Jiaojiao Xu and Sijun Bai

This paper aims to develop an algorithm to study the impact of dynamic resource disruption on project makespan and provide a suitable resource disruption ratio for various complex…

Abstract

Purpose

This paper aims to develop an algorithm to study the impact of dynamic resource disruption on project makespan and provide a suitable resource disruption ratio for various complex industrial and emergency projects.

Design/methodology/approach

This paper addresses the RCPSP in dynamic environments, which assumes resources will be disrupted randomly, that is, the information about resource disruption is not known in advance. To this end, a reactive scheduling model is proposed for the case of random dynamic disruptions of resources. To solve the reactive scheduling model, a hybrid genetic algorithm with a variable neighborhood search is proposed.

Findings

The results obtained on the PSLIB instances prove the performance advantage of the algorithm; through sensitivity analysis, it can be obtained, the project makespan increases exponentially as the number of disruptions increase. Furthermore, if more than 50% of the project's resources are randomly disrupted, the project makespan will be significantly impacted.

Originality/value

The paper focuses on the impact of dynamic resource disruptions on project makespan. Few studies have considered stochastic, dynamic resource uncertainty. In addition, this research proposes a reasonable scheduling algorithm for the research problem, and the conclusions drawn from the research provide decision support for project managers.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 22 June 2012

S. Ganesan and S. Subramanian

The purpose of this paper is to solve the optimal power dispatch problem of thermal generating units with cubic fuel cost and emission functions.

157

Abstract

Purpose

The purpose of this paper is to solve the optimal power dispatch problem of thermal generating units with cubic fuel cost and emission functions.

Design/methodology/approach

The proposed Simplified Direct Search Method (SDSM) is developed from the Direct Search Method (DSM) that is a prevailing method for solving economic dispatch (ED) problems. The SDSM performs a direct search on solution space that starts with the minimum generation limits and provides the most economical schedule in a single execution for all load demands that the system can meet.

Findings

A simple methodology is developed to obtain the optimal dispatches of the generators in a thermal power plant. The results of the proposed methodology illustrate improvements in the savings of total cost and marginal reduction in transmission loss. It is also suitable for solving environmental constrained power dispatch problems. The proposed approach is computationally efficient for large‐scale systems.

Originality/value

A simple methodology has been developed to obtain the real power dispatches of thermal generating units with higher order fuel cost and emission functions.

Details

International Journal of Energy Sector Management, vol. 6 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 1 June 2015

V Moorthy, P Sangameswararaju, S Ganesan and S Subramanian

The purpose of the paper is to solve hydrothermal scheduling (HTS) problem for energy-efficient management by allocating the optimal real power outputs for thermal and…

Abstract

Purpose

The purpose of the paper is to solve hydrothermal scheduling (HTS) problem for energy-efficient management by allocating the optimal real power outputs for thermal and hydroelectric generators.

Design/methodology/approach

HTS can be formulated as a complex and non-linear optimization problem which minimizes the total fuel cost and emissions of thermal generators subject to various physical and operational constraints. As the artificial bee colony algorithm has proven its ability to solve various engineering optimization problems, it has been used as a main optimization tool to solve the fixed-head HTS problem.

Findings

A meta-heuristic search technique-based algorithm has been implemented for hydrothermal energy management, and the simulation results show that this approach can provide trade-off between conflict objectives and keep a rapid convergence speed.

Originality/value

The proposed methodology is implemented on the standard test system, and the numerical results comparison indicates a considerable saving in total fuel cost and reduction in emission.

Details

International Journal of Energy Sector Management, vol. 9 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 13 October 2021

Syed Asif Raza and Abdul Hameed

The findings of this study have lightened the focal research areas in maintenance planning and scheduling. These also served as effective guidelines for future studies in this…

Abstract

Purpose

The findings of this study have lightened the focal research areas in maintenance planning and scheduling. These also served as effective guidelines for future studies in this area. This research, therefore, contributes in fulfilling the gap by carrying out an SLR of contemporary research studies in the area of models for maintenance planning and scheduling. At present, SLR rooted in BA has not been carried focusing on a survey over models for maintenance planning and scheduling. SLR uses advanced scientific methodologies from BA tools to unveil thematic structures.

Design/methodology/approach

We have systematically reviewed over 1,021 peer-reviewed journal articles. Advanced contemporary tools from Bibliometric Analysis (BA) are used to perform a Systematic Literature Review (SLR). First, exploratory analysis is presented, highlighting the influential authors, sources and region amongst other key indices. Second, the large bibliographical data is visualized using co-citation network analyses, and research clusters (themes) are identified. The co-citation network is extended into a dynamic co-citation network and unveils the evolution of the research clusters. Last, cluster-based content analysis and historiographical analysis is carried out to predict the prospect of future research studies.

Findings

BA tools first outlined an exploratory analysis that noted influential authors, production countries, top-cited papers and frequent keywords. Later, the bibliometric data of over 1,021 documents is visualized using co-citation network analyses. Later, a dynamic co-citation analysis identified the evolution of research clusters over time. A historiographical direct citation analysis also unveils potential research directions. We have clearly observed that there are two main streams of maintenance planning and scheduling applications. The first has focused on joint maintenance and operations on machines. The second focused on integrated production and maintenance models in an echelon setting for unrealizable production facilities.

Originality/value

There are many literature review-based research studies that have contributed to maintenance scheduling research surveys. However, most studies have adopted traditional approaches, which often fall short in handling large bibliometric data and therefore suffer from selection biases from the authors. As a result, in this area, the existing reviews could be non-comprehensive. This study bridges the research gap by conducting an SLR of maintenance models, which to the best of our knowledge, has not been carried out before this study.

Details

Journal of Quality in Maintenance Engineering, vol. 28 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords