Search results

1 – 1 of 1
Article
Publication date: 4 November 2022

Alan J. McNamara, Sara Shirowzhan and Samad M.E. Sepasgozar

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study…

Abstract

Purpose

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study investigates the relationship between the personality dimensions of technology readiness index (TRI) and the system specific factors of technology acceptance model (TAM) within the context of iContracts.

Design/methodology/approach

Drawing insights from the extant literature and the author's previous qualitative investigations into iContract readiness constructs, a quantitative approach is used to operationalise the constructs by offering relevant statements to be measured and validated through a multiple-item scale against the users intent to accept the future iContract technology.

Findings

This study confirms and validates the relationship of the proposed iContract readiness index (iCRI) statements against the established TAM factors by offering 18 new constructs influencing technology readiness of the iContract technology. This study proves 9 of the 12 hypotheses highlighting key factors to be addressed for the successful development of the iContract technology.

Practical implications

This paper contributes to the body of knowledge by proposing a novel iCRI that informs an iContract technology readiness acceptance model (iCTRAM) for a trending technology. The iCTRAM can guide developers in producing an appropriate iContract solution and assess the readiness of users and organisations for the successful adoption of the iContract concept.

Originality/value

This study offers a unique theoretical framework, in an embryonic field, for predicting the success of iContract implementation within construction organisations. This study combines the established studies of TRI and TAM in producing a predictive iContract readiness assessment tool.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Access

Year

Last 6 months (1)

Content type

1 – 1 of 1