Search results

1 – 2 of 2
Article
Publication date: 7 April 2023

Azin Fathianpour, Mostafa Babaeian Jelodar, Suzanne Wilkinson and Barry Evans

As evacuation is one of the most used response actions to such disasters, it is essential to understand correctly what a resilient evacuation would mean. One critical factor in…

Abstract

Purpose

As evacuation is one of the most used response actions to such disasters, it is essential to understand correctly what a resilient evacuation would mean. One critical factor in evacuation resilience is the resilience level of evacuation infrastructures. Also, UN sustainable development has a goal to build resilient infrastructures. This study aims to investigate the characteristics of resilient evacuation infrastructures.

Design/methodology/approach

A systematic methodology for reviewing articles has been implemented to understand how vulnerable cities can be more prepared, especially for pedestrian evacuation.

Findings

This study has developed an evacuation scoring system framework for pedestrians to investigate evacuation infrastructure in terms of different resilience features, such as redundancy, safe-to-fail, readiness and capacity. The most practical evacuation system will be estimated. The output of this study can provide insight into a final output to provide the features of a successful pedestrian evacuation system for future policy drafting for infrastructure strategy decision-makers.

Practical implications

Climate change has made the risks of natural hazards such as tsunamis more intense for humans. Many people in the world live in hazardous environments and are susceptible to disasters. A community must be prepared to mitigate the destructive event and quickly respond to be called resilient.

Originality/value

This is an original work. The researcher has gone through a deep literature review and developed a cluster showing the features a resilient evacuation infrastructure should have.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 14 no. 4
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 27 August 2021

Ramin Asadi, Suzanne Wilkinson and James Olabode Bamidele Rotimi

The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been…

Abstract

Purpose

The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been implemented to control reworking, a comprehensive list of rework causes is yet to be provided to present the common causes that contribute to rework in construction contracts. This paper aims to investigate the most common rework causes that need to be addressed in construction contracts.

Design/methodology/approach

A mixed-method using both the qualitative and quantitative approach is used in this paper. First of all, the study adopted a four-step literature review to introduce the rework research trends and provide statistical reports using descriptive analysis. Next, a comprehensive review has been completed using content analysis to identify the common causes of rework in construction projects. Finally, the common causes in construction contracts are further investigated through a quantitative questionnaire survey to validate the initial results.

Findings

The results of the review showed an increasing trend of publications on rework over the last three decades. Most of the studies were conducted in Australia, the UK, Nigeria and Hong Kong. Based on further investigation in the study area of sources of rework, 37 causes of rework causes were identified and classified in five groups. Then, the most significant causes of rework in construction contracts were compiled in the list of 22 items.

Research limitations/implications

The paper’s reported result, contributes to the contract management body of knowledge by proposing a list of common rework causes that can be used by practitioners during the contract negotiation to prevent contractual issues. The result of the review can also be used for further investigation of the relationship between rework and contract conditions.

Originality/value

The proposed list of common causes of rework in construction contracts allows project parties to improve the terms of the contract in addressing rework, this could result in fewer contractual claims and disputes. The findings of this study will also guide the investigations into the contract conditions, thus the approach used is constructive.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Year

Last 12 months (2)

Content type

1 – 2 of 2