Search results

1 – 6 of 6
Article
Publication date: 2 April 2019

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The purpose of this paper is to explore the synergies between post-end-of-life of building (PEoLB) concepts and operations to achieve sustainability.

1014

Abstract

Purpose

The purpose of this paper is to explore the synergies between post-end-of-life of building (PEoLB) concepts and operations to achieve sustainability.

Design/methodology/approach

A systematic literature review (SLR) was conducted using 65 articles published between 2006 and 2017, and it has been subjected to descriptive and thematic analysis.

Findings

The descriptive analysis revealed that the majority of the articles were about (60 per cent) PEoLB operations, followed by (23 per cent) PEoLB concepts. Only 17 per cent of the articles have dealt with PEoLB-related strategic approaches. The thematic analysis elaborated on the literature development; interrelationships between PEoLB concepts and operations; impediments of introducing sustainability on these operations, remedial measures and information-based strategic approaches to achieve sustainability. Based on the findings, a conceptual framework for sustainable PEoLB operations is proposed. Furthermore, four areas of potential future research are discussed.

Research limitations/implications

This study presents a future research agenda including best practices to plan PEoLB operations and the development of optimisation models, risk management and information-based strategic approaches.

Practical implications

The proposed conceptual research framework triggers and nurtures potential pathways to introduce sustainable PEoLB operations under sound information flow. This could create a basis for future empirical studies in filling the identified gaps in literature. The framework could also assist practitioners in mitigating risks associated with transportation, storing and contamination of salvaged materials through enhanced information flow. In addition, the framework provides some managerial guidance to organisations seeking ways of establishing sustainability during reverse logistics (RL) operations.

Originality/value

This paper presents an SLR of an emerging area of research that encapsulates closed-loop supply chain through sustainable RL operations. The study highlights the interrelationships between PEoLB concepts and operations. It develops a robust approach to effectively manage the PEoLB operations underpinned by a sound information flow to facilitate sustainability.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 July 2019

Ruchini Senarath Jayasinghe, Nicholas Chileshe and Raufdeen Rameezdeen

The purpose of this paper is to explore the synergies among reverse logistics supply chain (RLSC), quality management (QM) and information management (IM) concepts to enhance the…

1467

Abstract

Purpose

The purpose of this paper is to explore the synergies among reverse logistics supply chain (RLSC), quality management (QM) and information management (IM) concepts to enhance the effectiveness of demolition waste management (DWM) practices.

Design/methodology/approach

A systematic literature review was conducted using 70 articles published between the years of 2006 and 2017, which were subjected to descriptive and thematic analysis.

Findings

The descriptive analysis established that the RLSC concept was dealt within the majority of the publications (61 per cent), followed by concepts related to quality in RLSC (24 per cent). Only 14 per cent of the articles were based on IM concepts related to RLSC. Quality and information are interrelated in the effective implementation of RLSC. The thematic analysis demonstrated that there is a need for using quality parameters in a regulatory environment in an information-based environment. Based on the findings, future research directions were developed.

Research limitations/implications

The study encourages researchers to identify novel directions by combining these three concepts. The study developed a future research agenda regarding use of building information modelling (BIM) for existing buildings under novel technologies; analysis of secondary market demand and supply; and assessment of cost and safety management with quality in a BIM-enabled environment.

Practical implications

The practical implications include the application of sustainable management principles based on stakeholders and the regulatory environment.

Originality/value

Integration of the three concepts is an emerging area. This integration developed a robust approach to achieve QM in RLSC operations under a sound information flow enabling the optimisation of DWM.

Details

Benchmarking: An International Journal, vol. 26 no. 7
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 8 August 2023

Larissa Statsenko, Ruchini Senarath Jayasinghe and Claudine Soosay

This study aims to investigate supply network (SN) resilience capabilities across the organizational, supply chain (SC) and industry levels by drawing on the complex adaptive…

Abstract

Purpose

This study aims to investigate supply network (SN) resilience capabilities across the organizational, supply chain (SC) and industry levels by drawing on the complex adaptive systems (CASs) theory and the social–ecological perspective of resilience. An empirically grounded framework operationalizes the concept of social–ecological resilience by expounding resilience capabilities across phases of the CAS adaptive cycle.

Design/methodology/approach

This research uses a qualitative multiple case study approach. It draws on the case of the Australian Defence Manufacturing SN (ADM SN) during COVID-19 disruptions. A total of 28 interviews with senior decision makers from 17 companies, complemented by 5 interviews with the Australian Defence SC organizations and secondary data analysis, support the findings.

Findings

Individual organizations’ SC visibility and flexibility enabled by effective risk management and collaboration enhance the ability of the SN to anticipate and prepare for disruption. At the same time, the strength of SC relationships reduces resilience. SN disruption response velocity is enabled by inventory redundancy, process flexibility at the organizational level and visibility and collaboration at the SC level. Institutional support at the national industry level, development of value-adding capabilities and manufacturing process flexibility at the organizational level enhances the SN’s ability to re-organize. The transition from hierarchical to decentralized collaborative governance enhances SN resilience.

Practical implications

From a practitioner’s perspective, the findings highlight the need to embrace a broader view of SC beyond immediate tiers. Decision-makers in multinational companies must recognize the long-term impact of their procurement decisions on the supplier ecosystem. Developing local supplier capabilities rather than relying on established global SCs will pay off with future resilience. It, however, demands substantial investment and radical changes across all SC tiers. The lesson for smaller firms is not to over-rely on the existing relationships with supply partners. Although trust-based relationships and collaboration are essential, over-commitment can be counterproductive during global disruptions. With a lack of visibility and control over the SC, operational flexibility is critical for small firms to adapt to shifts in supply and demand.

Originality/value

To the best of the authors’ knowledge, this empirical research is one of the first attempts to operationalize the social–ecological perspective of SN resilience. Evidence-based theoretical propositions contribute to the emerging conversation about the CAS nature of resilience by demonstrating the multi-level effects of resilience capabilities.

Details

Supply Chain Management: An International Journal, vol. 29 no. 1
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 17 May 2022

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC…

Abstract

Purpose

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC have not explicitly identified the risks of its inter-relationships by disentangling their effects on operational performance. Accordingly, this paper aims to identify and assess the inter-dependencies of the risks in the RLSC to improve quality-related operational performance.

Design/methodology/approach

A sequential exploratory mixed-method research approach, consisting of qualitative and quantitative methods, was employed. The qualitative approach involved 25 semi-structured interviews, whereas the 18 subsequent structured interviews were conducted with stakeholders in the entire RLSC as part of the quantitative method. These were used to identify the cause and effect relationships of the identified risks. The data were analysed using thematic analysis, and the Bayesian belief network (BBN) technique was used to develop a conceptual risk model.

Findings

In total 20 risks in four RLSC sub-processes, namely, dismantling and on-site process, off-site resource recovery process, marketing of secondary products and residue disposal, emerged. Among cause and effect relationships of identified risk factors, inferior quality of secondary products was found to have the strongest relationship with customer satisfaction. Under-pricing of dismantling job, improper landfill operations and inadequacy of landfill levy are independent risks that initiate other risks down the supply chain. The aggregate effects of these risks affect customer dissatisfaction of the end-product, as well as health and safety risks in on-site, off-site and residue disposal.

Research limitations/implications

This study only identify the cause and effect relationships of the identified risks within the RLSC for DWM operations. It has not targeted a specific construction material or any secondary production, which could be practiced through a case study in future research.

Practical implications

The results encourage the investigation of RLSC process quality by maintaining the relationship between recycler and customer to enable a safe workplace environment. Hence, the role of relevant practitioners and government is inseparable in supporting decision-making. Future research could discuss the impact of those inter-related risks in relation to time- or cost-related operational performance criteria.

Originality/value

This study contributes to the field through presenting the first major study on the identification and assessment of the inter-dependencies of the risks in the RLSC in South Australia. The RLSC process mapping had been identified as a tactical and operational management approach. However, the risk management process is a strategic management approach. Therefore, the integration of both process mapping and the risk management approaches in one platform is germane to construction management research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 May 2017

Ruchini Senarath Jayasinghe and Nirodha Gayani Fernando

The purpose of this paper is to establish labour productivity norms (LPNs) on an elemental basis to investigate a measurement for the labour productivity (LP) of aluminium system…

Abstract

Purpose

The purpose of this paper is to establish labour productivity norms (LPNs) on an elemental basis to investigate a measurement for the labour productivity (LP) of aluminium system formwork (ASF) in low-cost housing projects (LHPs) in Sri Lanka.

Design/methodology/approach

Case study approach was selected as the most appropriate for the study and semi-structured interviews, document review and direct observations were used for the data collection. Four case studies were conducted. Eight semi-structured interviews were conducted among four cases. Further, document review was used in three cases, and direct observation was used in one case. The validation of the results was not possible in a real life project due to time limitations.

Findings

The findings identified six labour productivity factors (LPFs) affecting the LP of ASF. The need for LPNs for ASF on an elemental basis is identified. Further, LPNs were developed using LPFs.

Research limitations/implications

This research was limited to LHPs for underserved settlements in Colombo, Sri Lanka which use ASF. The LPNs were prepared based on time studies and were restricted to structural elements such as slabs, beams and columns.

Originality/value

The LPNs were developed for ASF in LHPs based on the effect of weather, crew, site, management and project factors. Further, the study addresses a gap in the literature regarding the development of LPNs of ASF for LPHs in Sri Lanka. LPNs for ASF have enhanced LP while promoting economic and social stability in the industry.

Content available
Article
Publication date: 11 May 2017

Mohan Kumaraswamy

Abstract

Details

Built Environment Project and Asset Management, vol. 7 no. 2
Type: Research Article
ISSN: 2044-124X

Access

Year

All dates (6)

Content type

1 – 6 of 6