Search results

1 – 3 of 3
Content available
Book part
Publication date: 28 March 2024

Abstract

Details

Geo Spaces of Communication Research
Type: Book
ISBN: 978-1-80071-606-3

Article
Publication date: 20 November 2023

Brandon Mastromartino, Michael L. Naraine, Windy Dees and James J. Zhang

There remains a critical issue in sport management scholarship in that the field lacks a well-defined framework for delineating practical implications in research. This research…

Abstract

Purpose

There remains a critical issue in sport management scholarship in that the field lacks a well-defined framework for delineating practical implications in research. This research aims to answer the following research questions: (1) What types of practical implications can be identified in sport management research? (2) How can sport management research frame the practical implications of the study in a way that is both theoretically sound and useful for practitioners?

Design/methodology/approach

Through a scoping review and within the lens of Jaworski (2011)'s framework for managerial relevance, the study examined 427 articles from European Sport Management Quarterly, Journal of Sport Management and Sport Management Review published between 2000 and 2020.

Findings

This study presents a five-pronged framework that identifies target managers, organizational tasks, time horizons, philosophical impact and desired outcomes. Furthermore, the current research offers suggestions for how to present managerial implications in sport management research.

Originality/value

The findings shed light on the managerial relevance of the recent sport management body of work, developing an important framework for practical implications for the field to reflect and incorporate into future studies. With a theoretical understanding of how to frame the practical implications of sport management research, the gap between academia and industry can continue to narrow, and the relevance to the industry may be more pertinent than ever before.

Details

Sport, Business and Management: An International Journal, vol. 14 no. 3
Type: Research Article
ISSN: 2042-678X

Keywords

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 3 of 3