Article
Publication date: 4 July 2017

Rita Henriikka Lavikka, Teemu Lehtinen and Daniel Hall

This study aims to increase understanding about the co-creation of digital facilities management (FM) services with and for FM during a construction project.

1017

Abstract

Purpose

This study aims to increase understanding about the co-creation of digital facilities management (FM) services with and for FM during a construction project.

Design/methodology/approach

The paper reports a case study on the co-creation of a digital facilities management service during the Mission Bay medical center construction project for the University of California, San Francisco. The sub-contractors and the FM team co-created a quick-response (QR) code system for valves on the project. This digital service is now used by the FM team for training purposes and in emergency situations when information on valves and their service areas is quickly needed. Researchers made on-site observations, conducted 84 interviews and reviewed archival data in 2012, 2014 and 2016.

Findings

The findings show that a successful co-creation process consists of three elements: a dialogue between the project parties, the creation of shared context between the project parties and the creation of shared understanding about the FM’s needs and the service providers’ ways of satisfying those needs. The study describes ways to promote these elements.

Originality/value

Previous studies emphasize the need for digital FM but few explain how FM teams can be involved in creating digital services for them. This paper describes how to co-create digital FM services with and for FM in the context of a construction project.

Details

Facilities, vol. 35 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2097

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 4 August 2020

Lars Stehn, Susanne Engström, Petri Uusitalo and Rita Lavikka

To further the understanding of industrialised house building (IHB) from a temporal, emergent corporate-ability perspective, this study aims to trace the build-up of corporate…

Abstract

Purpose

To further the understanding of industrialised house building (IHB) from a temporal, emergent corporate-ability perspective, this study aims to trace the build-up of corporate assets in an IHB company over time. The research draws on dynamic capabilities, acknowledging not only what assets the company have developed and currently are exploiting, but also how these assets were develop and managed (i.e. enhanced, combined, protected and potentially reconfigured) to sustain long-term competitiveness.

Design/methodology/approach

A case study design was used to form a narrative that covers the evolution of an IHB company over a 25-year period. Corporate archival material, analysis of original data from a large number of research studies during 1993-2013 and retrospective reflections of owners and managers, including crosschecking interpretations of archival material, developed and triangulated the narrative.

Findings

The study presents rich empirical findings on the build-up of corporate assets. Starting from a successive process of exploration and exploitation formation of dynamic capabilities eventually played out into an exponential dynamic capability build-up. The IHB case company displays the ability to not only continuously exploit and renew resources and competences, but also to sense, seize and reconfigure cumulative assets over time. The exponential development of dynamic capabilities resonates to literature on higher-order dynamic capabilities implying that: the accumulated and higher-order dynamic capabilities are difficult to imitate and a (any) company must possess higher-order dynamic capabilities to be able to exploit and/or take up IHB.

Originality/value

The study is complementing and potentially challenging frequent framings of the IHB concept. Previous research has addressed and characterised IHB mainly by encapsulating a moment in time and, thus, characteristics are momentary and represent static views on IHB. However, IHB has seen a strong development over the past 25 years, and the study reflects on this development from the perspective of one of the IHB-forerunner companies in Sweden. By exploring from a company perspective the developments, reconfiguration and capacity to develop/reconfigure over time in a changing environment, the study introduces an alternative understanding of IHB as dynamic capabilities.

Details

Construction Innovation , vol. 21 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 May 2019

Rita Henriikka Lavikka, Riikka Kyrö, Antti Peltokorpi and Anna Särkilahti

Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose…

Abstract

Purpose

Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose of this paper is to explore the root causes of changes in hospital construction projects. The paper aims to propose ways to prepare for the changes.

Design/methodology/approach

The study focuses on changes during the construction of new hospital facilities. An explorative, case study research design is utilised. Five case projects from Finland, Sweden and the USA were selected for in-depth analysis. The primary data comprise semi-structured interviews, supported by secondary evidence such as change order documents.

Findings

The findings reveal eight categories for change sources: contracts, and equipment and systems are reflective of the fast-paced healthcare technology and changing user requirements, while external environment comprises changes caused by both regulatory and physical environment. Changes in operations are reflected in the continuous development of treatment methods and processes. The user, owner, designer and contractor initiated changes represent the stakeholder influence. The paper makes a connection between these change sources and project complexity dimension. A framework for change dynamics is introduced, and product and process flexibility is suggested as a suitable method to prepare for and manage changes.

Originality/value

The paper is the first to link construction changes to project complexity factors. The paper argues that changes, when managed appropriately, are not only necessary but also beneficial to large construction projects in a quickly changing environment. The findings guide project stakeholders in implementing project flexibility, in the product and process dimensions, which is a balancing force to project complexity.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 29 March 2021

Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…

2288

Abstract

Purpose

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.

Design/methodology/approach

The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.

Findings

The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.

Originality/value

The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 April 2020

Rita Lavikka, Olli Seppänen, Antti Peltokorpi and Joonas Lehtovaara

University research efforts have not been effective in developing lasting impacts on operations management in construction because of inadequate coordination between academia and…

4525

Abstract

Purpose

University research efforts have not been effective in developing lasting impacts on operations management in construction because of inadequate coordination between academia and industry. This study aims to describe the development of an industry–university (IU) relationship which has enabled the conduct of practically and scientifically relevant research.

Design/methodology/approach

Design science research was carried out between 2016 and 2019 to build a consortium between a university and 17 design, construction, technology and logistics companies for enabling process innovations in construction. The consortium conducted industry-funded research on various topics, such as takt production, lean design management, prefabrication, measurement of waste and business models supported by digitalisation. The academic and practical impacts of the consortium’s research projects were investigated through a survey and in-depth company interviews.

Findings

The paper presents a conceptual model for creating an IU relationship to support scientifically and practically relevant research. The model includes network architects who mobilised consortium development and a joint governance body that developed a shared long-term vision and selected research topics based on this vision. The results show that using the model’s approach, the consortium selected research topics that have led to both academic publications and process innovations in construction.

Originality/value

Using empirical data, this study describes how to create a win-win IU innovation relationship that enables the implementation of process innovations into the construction sector and, at the same time, the conduct of scientific research in construction management.

Details

Construction Innovation , vol. 20 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 March 2015

Rita Henriikka Lavikka, Riitta Smeds and Miia Jaatinen

– The paper aims to compare the coordination of supply chain networks in contractually different complex construction projects.

2184

Abstract

Purpose

The paper aims to compare the coordination of supply chain networks in contractually different complex construction projects.

Design/methodology/approach

A comparative case study of the coordination of collaborative work in two successful hospital construction projects was conducted. One of the projects applied multiple dyadic contracts, whereas the other project applied one multi-party contract between the parties. The projects were located in the USA. Data were collected by observing the coordination on the construction sites for six weeks and by conducting 72 interviews.

Findings

The paper shows that depending on the contract type, the timing and extent of complementary procedural coordination differs during projects. Compared with one multi-party contract, the dyadic contracts needed to be complemented during the design phase with three additional procedural coordination mechanisms: organizational design, processes for collaborative work and integrated concurrent engineering sessions. Additionally, common rules of conduct were taken into use during the construction phase. However, regardless of the contract type, procedural coordination mechanisms, such as co-located working, collaborative decision-making in inter-organizational meetings, a liaison role and shared project goals were needed throughout the projects.

Practical implications

If multiple dyadic contracts are applied, procedural coordination mechanisms have to be co-created by all supply chain parties at the beginning of the project.

Originality/value

The paper provides an understanding on successful contractual and complementary procedural coordination mechanisms of supply chain networks in complex construction projects.

Details

Supply Chain Management: An International Journal, vol. 20 no. 2
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 7 September 2015

Rita Lavikka, Riitta Smeds and Miia Jaatinen

The purpose of this paper is to discover a three-step process for building contextual ambidexterity into inter-organizational IT-enabled service processes through developmental…

1519

Abstract

Purpose

The purpose of this paper is to discover a three-step process for building contextual ambidexterity into inter-organizational IT-enabled service processes through developmental interventions.

Design/methodology/approach

A longitudinal action research project was conducted. The empirical study consisted of three consecutive developmental interventions to support the collaborative development effort of an IT company and its customer network to efficiently serve their present and future customers. The data consists of process modeling and simulation workshop discussions, interviews, observation, and archival data. The development effort was studied for over a year.

Findings

The study shows that the three developmental interventions acted as a process for balancing the exploration-exploitation tension in inter-organizational service processes. The sequential interventions facilitated the studied organizations in crossing the inter-organizational knowledge boundaries and creating shared domain knowledge, creating common understanding of the collaborative IT-enabled service processes, and co-developing the coordination mechanisms that are essential for the continuous exploration and exploitation of the new ideas in the future collaborative service processes. These three steps built capacity for the inter-organizational management system to achieve synergies between goals, resources, and activities in the inter-organizational collaboration.

Originality/value

The study contributes to the understanding on the process of building inter-organizational ambidexterity. The study presents a three-step process for building inter-organizational contextual ambidexterity into the IT-enabled service processes through developmental interventions. Research on inter-organizational contextual ambidexterity is combined with research on coordination and knowledge management.

Details

Business Process Management Journal, vol. 21 no. 5
Type: Research Article
ISSN: 1463-7154

Keywords

Open Access
Book part
Publication date: 1 May 2019

Risto Kärkkäinen, Rita Lavikka, Olli Seppänen and Antti Peltokorpi

Low productivity in construction is typically blamed on the seemingly complex and chaotic nature of construction, which emerges as the stakeholders do not have an adequate picture…

Abstract

Purpose

Low productivity in construction is typically blamed on the seemingly complex and chaotic nature of construction, which emerges as the stakeholders do not have an adequate picture of the evolving situation. The ever-increasing volume of situation data owing to the recent advances in IoT devices and reality capture platforms provide a unique opportunity to capture the actual situation data of construction projects accurately at a fraction of the cost compared to manual status tracking and reporting. This paper aims to investigate the concept of a situation picture, challenges in collecting situation data and its benefits.

Design/Methodology/Approach

Empirical data is collected through interviews in California and Finland, and by organizing workshops.

Findings

We contribute to literature on managing operational information by defining the concept of a situation picture in the context of construction, specifically from the blue-collar’s perspective during on-site activities. We present the key components of a conceptual information model that represents a situation picture in construction.

Research limitations/implications

The applicability of conceptual information model of situation picture is not tested in practice, but the model will provide a starting point for research to comprehensively integrate social and digital information exchange for improving workflow.

Practical implications

The paper claims that designing and building comprehensive information management infrastructure would contribute to solving the problems of low productivity, quality and safety in construction projects.

Originality/value

Research on situation picture and situation awareness is scarce in the context of construction. The study links various information management technologies and practices to actual construction productivity.

Article
Publication date: 9 May 2008

Miia Jaatinen and Rita Lavikka

The purpose of this paper is to develop further a theoretical framework of common understanding and explore the role of common understanding in coordination.

1296

Abstract

Purpose

The purpose of this paper is to develop further a theoretical framework of common understanding and explore the role of common understanding in coordination.

Design/methodology/approach

A constructive action research approach was employed applying abductive reasoning to develop new models with practical relevance.

Findings

A new framework of the elements of common understanding and a new theory of communication as a mechanism for coordination.

Research limitations/implications

As a longitudinal case study and part of a multiple case‐study, the findings are generalized to theory which should be further developed.

Practical implications

Presents a framework for developing shared meanings to achieve better coordination in collaborative service provisioning.

Originality/value

Presents a new model of common understanding, a refined approach to coordination.