Article
Publication date: 12 October 2018

Bokolo Anthony Jnr.

This study aims to develop a software risk prioritization model using analytic hierarchy process (AHP) and further validate the usability attributes of the model in prioritizing…

Abstract

Purpose

This study aims to develop a software risk prioritization model using analytic hierarchy process (AHP) and further validate the usability attributes of the model in prioritizing operational, technical, technological, strategic and environmental software risks.

Design/methodology/approach

Questionnaire was used to collect data from software practitioners to evaluate the usability attributes of the AHP-software risk prioritization model. Accordingly, partial least square-structural equation modeling was used to analyze the collected data.

Findings

Results reveal that the developed AHP-software risk prioritization model is efficient and effective in facilitating software risk factor prioritization. In addition, results suggest that the experts are satisfied with the learnability, accessibility and navigation capability of the model. Besides, results indicate that the model provides a useable interface and system design for content availability of information needed by software practitioners in evaluating and prioritizing operational, technical, technological, strategic and environmental risk. Furthermore, results show that the experts intend to adopt the model to prioritize identified software risk in their firm.

Research limitations/implications

Methodologically, the developed AHP-software risk prioritization model is faced with issues such as inconsistency in judgments, weakness of confronting ambiguities and uncertainties of high complexity. Empirically, data were collected from software practitioners in Malaysia to validate the AHP-software risk prioritization model. Hence, results from this study cannot be generalized to other software practitioners in different countries.

Practical implications

This study developed a software risk prioritization model to evaluate and prioritize software risks that occur in software organizations by deploying AHP to carryout risk factor priority selection. Moreover, the model provides risk knowledge as guidelines for evaluating software risks in software organizations.

Social implications

The developed AHP-software risk prioritization model computes risk prioritization factor priority selection and further supports software practitioners and evaluates risks and associated risk factors. Besides, this study develops an instrument that can be used in project risk management to validate the usability attributes of software risk approaches.

Originality/value

This research designs use case and class diagram to show how the AHP-software risk prioritization model evaluates and prioritizes software risks factors by using risk evaluation questions. Additionally, the AHP-software risk prioritization model computes, evaluates and prioritizes software risk factors using risk factor priority selection for software project management.

Details

Journal of Science and Technology Policy Management, vol. 10 no. 2
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 5 February 2024

Swarup Mukherjee, Anupam De and Supriyo Roy

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk

Abstract

Purpose

Identifying and prioritizing supply chain risk is significant from any product’s quality and reliability perspective. Under an input-process-output workflow, conventional risk prioritization uses a risk priority number (RPN) aligned to the risk analysis. Imprecise information coupled with a lack of dealing with hesitancy margins enlarges the scope, leading to improper assessment of risks. This significantly affects monitoring quality and performance. Against the backdrop, a methodology that identifies and prioritizes the operational supply chain risk factors signifies better risk assessment.

Design/methodology/approach

The study proposes a multi-criteria model for risk prioritization involving multiple decision-makers (DMs). The methodology offers a robust, hybrid system based on the Intuitionistic Fuzzy (IF) Set merged with the “Technique for Order Performance by Similarity to Ideal Solution.” The nature of the model is robust. The same is shown by applying fuzzy concepts under multi-criteria decision-making (MCDM) to prioritize the identified business risks for better assessment.

Findings

The proposed IF Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS) for risk prioritization model can improve the decisions within organizations that make up the chains, thus guaranteeing a “better quality in risk management.” Establishing an efficient representation of uncertain information related to traditional failure mode and effects analysis (FMEA) treatment involving multiple DMs means identifying potential risks in advance and providing better supply chain control.

Research limitations/implications

In a company’s supply chain, blockchain allows data storage and transparent transmission of flows with traceability, privacy, security and transparency (Roy et al., 2022). They asserted that blockchain technology has great potential for traceability. Since risk assessment in supply chain operations can be treated as a traceability problem, further research is needed to use blockchain technologies. Lastly, issues like risk will be better assessed if predicted well; further research demands the suitability of applying predictive analysis on risk.

Practical implications

The study proposes a hybrid framework based on the generic risk assessment and MCDM methodologies under a fuzzy environment system. By this, the authors try to address the supply chain risk assessment and mitigation framework better than the conventional one. To the best of their knowledge, no study is found in existing literature attempting to explore the efficacy of the proposed hybrid approach over the traditional RPN system in prime sectors like steel (with production planning data). The validation experiment indicates the effectiveness of the results obtained from the proposed IF TOPSIS Approach to Risk Prioritization methodology is more practical and resembles the actual scenario compared to those obtained using the traditional RPN system (Kim et al., 2018; Kumar et al., 2018).

Originality/value

This study provides mathematical models to simulate the supply chain risk assessment, thus helping the manufacturer rank the risk level. In the end, the authors apply this model in a big-sized organization to validate its accuracy. The authors validate the proposed approach to an integrated steel plant impacting the production planning process. The model’s outcome substantially adds value to the current risk assessment and prioritization, significantly affecting better risk management quality.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Open Access
Article
Publication date: 13 May 2021

Devin DePalmer, Steven Schuldt and Justin Delorit

Limited facilities operating and modernization budgets require organizations to carefully identify, prioritize and authorize projects to ensure allocated resources align with…

1099

Abstract

Purpose

Limited facilities operating and modernization budgets require organizations to carefully identify, prioritize and authorize projects to ensure allocated resources align with strategic objectives. Traditional facility prioritization methods using risk matrices can be improved to increase granularity in categorization and avoid mathematical error or human cognitive biases. These limitations restrict the utility of prioritizations and if erroneously used to select projects for funding, they can lead to wasted resources. This paper aims to propose a novel facility prioritization methodology that corrects these assessment design and implementation issues.

Design/methodology/approach

A Mamdani fuzzy logic inference system is coupled with a traditional, categorical risk assessment framework to understand a facilities’ consequence of failure and its effect on an organization’s strategic objectives. Model performance is evaluated using the US Air Force’s facility portfolio, which has been previously assessed, treating facility replicability and interruptability as minimization objectives. The fuzzy logic inference system is built to account for these objectives, but as proof of ease-of-adaptation, facility dependency is added as an additional risk assessment criterion.

Findings

Results of the fuzzy logic-based approach show a high degree of consistency with the traditional approach, though the value of the information provided by the framework developed here is considerably higher, as it creates a continuous set of facility prioritizations that are unbiased. The fuzzy logic framework is likely suitable for implementation by diverse, spatially distributed organizations in which decision-makers seek to balance risk assessment complexity with an output value.

Originality/value

This paper fills the identified need for portfolio management strategies that focus on prioritizing projects by risk to organizational operations or objectives.

Details

Journal of Facilities Management , vol. 19 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 17 February 2012

Shereazad Jimmy Gandhi, Alex Gorod and Brian Sauser

The purpose of this research is so that project managers can use a systemic approach to prioritizing the risks of outsourcing including an understanding of the external factors…

4573

Abstract

Purpose

The purpose of this research is so that project managers can use a systemic approach to prioritizing the risks of outsourcing including an understanding of the external factors that could affect the prioritization.

Design/methodology/approach

A survey was designed by the authors and distributed to 2,500 outsourcing professionals from different organizations and the hypotheses were tested using the data from these surveys. The logic for forming the hypothesis is discussed for each hypothesis and so are the demographics of the respondents

Findings

External factors such as the type of technology involved, type of market targeted, location of outsourcing and the amount of experience the outsourcing professional had, did affect the prioritization of the outsourcing risks. Furthermore, trends were identified among the ranking of the outsourcing risks.

Research limitations/implications

One of the constraining factors of this research, as in the majority of empirical research initiatives, was the limited sample size, which could potentially affect the rating. An increased sample size could have also provided the researchers with a more detailed insight into the interrelationships between the various outsourcing risks.

Originality/value

For the first time, the outsourcing risks have been prioritized using a systemic approach. The systemic approach has been used in the financial industry while analyzing risk but the authors have applied it to prioritization of outsourcing risks. This includes understanding the interrelationships between the risks and also the effect that external factors can have on the prioritization of those risks.

Article
Publication date: 18 April 2023

Iman Youssefi and Tolga Celik

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost…

Abstract

Purpose

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost overrun causes. Hence, this study aims at performing a comparative analysis to evaluate the efficiency of three different approaches for TRS calculation.

Design/methodology/approach

Thirty-eight unique causes of cost overrun in urban-related construction projects were identified and a survey was conducted among construction professionals in Iran. The TRS for each cost overrun cause is calculated using single-attribute (SA), double-attribute (DA), and multiple-attribute (MA) approaches, and eventually, causes were ranked. Furthermore, principal component analysis (PCA), logistic regression analysis (LRA), and K-means clustering are utilized to compare the differences in the generated TRS using different approaches.

Findings

The results revealed that the TRS generated through the MA approach demonstrated the highest efficiency in terms of generating correlation between causes and their identified latent constructs, prediction capability, and classification of the influential causes in the same group.

Originality/value

The originality of this study primarily stems from the adoption of statistical approaches in the evaluation of the recently introduced TRS calculation approach in comparison to traditional ones. Additionally, this study proposed a modified application of the relative importance index (RII) for risk prioritization. The results from this study are expected to fulfill the gap in previous literature toward exploring the most efficient TRS calculation approach for those researchers and practitioners who seek to utilize them as a measure to identify the influential cost overrun causes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 November 2021

Fábio Henrique de Souza, Luiz Octávio Gavião, Annibal Parracho Sant'Anna and Gilson B.A. Lima

This study aims to develop a risk prioritization process using failure mode and effect analysis (FMEA) in association with composition of probabilistic preferences (CPP) and…

Abstract

Purpose

This study aims to develop a risk prioritization process using failure mode and effect analysis (FMEA) in association with composition of probabilistic preferences (CPP) and weighting the risk analysis criteria. It seeks to develop decision-making considering the fast response necessary to achieve project objectives in complex scenarios, such as the pandemic of COrona VIrus Disease 19 (COVID-19).

Design/methodology/approach

After identifying the risks, the prioritization process was applied to a project in the oil and gas area, in which a focus group assessed these risks. This evaluation took place employing traditional FMEA, FMEA with CPP by axes considering four points of view and FMEA with CPP by weighted sum with the use of a multicriteria method to weight the criteria. These approaches were compared to understand their differences and benefits, with a flow chart being developed, consolidating the procedure.

Findings

The methodologies that showed the greatest benefits were FMEA with CPP by axes PO (progressive-optimistic) and by weighted sum. Essentially, this was mainly related to the interrelationship between risks and to the importance of prioritization.

Originality/value

This procedure can consider company's views on what is critical and the interrelationship between risks. It provides a clear segmentation of what should and should not be prioritized. It was also developed in a practical case, showing a possible alternative to support fast responses in decision-making.

Details

International Journal of Managing Projects in Business, vol. 15 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 22 March 2019

Rahul Vishwanath Dandage, Shankar S. Mantha and Santosh B. Rane

International projects very commonly experience failure due to various factors at the global level. Especially, large projects at the international level virtually have no chance…

5230

Abstract

Purpose

International projects very commonly experience failure due to various factors at the global level. Especially, large projects at the international level virtually have no chance of meeting scope, time, cost and quality. This fact has been underlined by most of the international surveys and published literature. Effective risk management plays a vital role in preventing projects from failure by implementing appropriate risk response strategies. The success of risk management will be based on the understanding of various risk categories which specifically affect international projects, analysis of their interdependence, prioritize them according to their importance and develop strategies for risk management based on the prioritization. The paper aims to discuss these issues.

Design/methodology/approach

This paper represents typical eight risk categories frequently observed in the international projects through literature survey and feedback from project professionals. Interpretive structural modeling (ISM) and Matrice d’Impacts croises-multiplication applique´ an classment (MICMAC) analysis have been used to analyze the interactions among the risk categories and prioritize them. The strategy management tool threats, opportunities, weaknesses and strengths (TOWS) matrix has been used to develop the strategies for effective project risk management.

Findings

The analysis represents political risks, contractual and legal risks, cultural risks, and financial and economic risks as the highest priority risk categories, the mitigation of which should be paid the highest attention. The strengths-threats strategy has been applied to develop the strategies by identifying the various internal strengths of project organization to overcome the various threats caused by the eight risk categories observed in international projects.

Research limitations/implications

This paper tries to represent the prioritization of international project risk categories which are generic in nature. For any specific international project, the risk categories as well as their prioritization may be slightly varying. The tool used for prioritization; Interpretive structural modeling (ISM) is more suitable for few numbers of variables as it becomes complex as the number of variables increases. The strengths and threats considered for developing strategies using TOWS matrix are based on the feedback from project professionals and may vary according to the nature of project.

Originality/value

This paper uses ISM and MICMAC for risk prioritization in international projects and TOWS matrix for developing risk management strategies. This may trigger new opportunities for in-depth research in the risk management strategy development for international projects.

Details

International Journal of Managing Projects in Business, vol. 12 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 7 January 2022

Ramon Swell Gomes Rodrigues Casado, Maisa Mendonca Silva and Lucio Camara Silva

The paper aims to propose a multi-criteria model for risk prioritisation associated to supply chain management involving multiple decision-makers.

Abstract

Purpose

The paper aims to propose a multi-criteria model for risk prioritisation associated to supply chain management involving multiple decision-makers.

Design/methodology/approach

The model integrates the composition of probabilistic preferences (CPP) on the failure modes analysis and its effects (FMEA) criteria. First, the authors carried out a probabilistic transformation of the numerical evaluations of the multiple decision-makers on the FMEA criteria regarding the internal risks that affect the chain of clothing pole in the Agreste region of Pernambuco. Then, the authors proposed the use of the Kendall's concordance coefficient W to aggregate these evaluations.

Findings

Contrary to expectations, the two main risks to be investigated as a model suggestion was related to the context of supply chain suppliers and not related to the raw material costs. Besides, a simulation with the traditional FMEA was carried out, and comparing with the model result, the simulation is worth highlighting seven consistent differences along the two rankings.

Research limitations/implications

The focus was restricted to the use of only internal chain risks.

Practical implications

The proposed model can contribute to the improvement of the decisions within organisations that make up the chains, thus guaranteeing a better quality in risk management.

Originality/value

Establishing a more effective representation of uncertain information related to traditional FMEA treatment involving multiple decision-makers means identifying in advance the potential risks, providing a better supply chain control.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 3
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 4 December 2017

Mourad Salim Aouati, Rachid Chaib, Irina Cozminca and Ion Verzea

Today, methods and risk analysis tools are used to argue decisions concerning issuance of operating licenses, risk management and development of action and emergency plans. In…

Abstract

Purpose

Today, methods and risk analysis tools are used to argue decisions concerning issuance of operating licenses, risk management and development of action and emergency plans. In practice, a company is looking for a tool to help in decision-making and in the development of action plans. Thus, the creation of a safe working environment is essential to a company’s success and is one of the best ways to attract/retain staff and increase productivity. It should then set up a kind of funnel sieve that allows understanding all risks to keep only the most significant, which should be given priority. Thus, global risk management should be based on an accurate diagnosis of all company risks. This diagnosis can be formalized in the form of a risk map. The latter is crucial because it raises the overall risk identification, assessment, prioritization and prioritization of action. It is an essential component of any company’s risk management processes. The objective is to have an overall inventory (entity, system, process, activity, etc.) of the vulnerabilities of all fields of activity. It offers a simple and didactic presentation, giving an overview to decision-makers to guide their strategic choices of action. This mapping is then used to monitor the effectiveness of strategies implemented, forming, in a very relevant tool for communication, the objective assessment of this work. So, the purpose of this study is to describe a methodology for comprehensive risk analysis, called risk map. The purpose of this work is to provide a decision support tool to identify areas of weaknesses to allow setting priorities for action to be undertaken by the company to improve the working conditions by organizational, technical and human solutions while engaging in a process of continuous improvement.

Design/methodology/approach

The proposed approach for the development of a risk map comprises five stages: risk identification, where the starting point is the identification of the main company processes or, alternatively, the main company activities; exhibition evaluation, the company counts then evaluate the most important risks that affect their processes or activities and persons; evaluation and prioritization of risks; action plan, the company implements the action plan developed on the basis of the prioritization of risks and the company identifies the solutions implemented to reduce the risk and evaluates; and actions control.

Findings

This study allows making an image of overall places with vulnerabilities inside the company by a simple and didactic representation, facilitating the promotion of a culture of communication regarding the company vulnerabilities. The development of this risk mapping allowed the development of a very useful tool of communication on the inventory for formulating a risk appetite and determining the risk profile. It is a tool for decision and action whose purpose is the improvement of working conditions by organizational solutions, technical and human resources for the health and safety of employees while engaging in a process of continuous improvement.

Research limitations/implications

The limitations of this study include the lack of competence in risk concepts. It is enough to have a pludisciplinary team to highlight the various dangers and move to the priorities and engage in a process of continuous improvement.

Practical implications

The approach detailed in this study can be used in any entity. One just needs to have skills.

Social implications

Low level of work accidents, a pleasant working environment, a very good motivation, a good productivity at work.

Originality/value

This work intends to reflect the concrete situation in which companies face the risks. It is interested in the relations between scientific expertise and the precautionary principle. It is a tool that guarantees the success of any preventive approach in a company. It is a decision-making tool for identifying areas of weakness to establish priorities for action by a company whose aim is to improve the working conditions through organizational, technical and human resources while engaging in a process of continuous improvement.

Details

World Journal of Engineering, vol. 14 no. 6
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 22 February 2013

Murugesan Punniyamoorthy, Natarajan Thamaraiselvan and Lakshminarayanan Manikandan

The purpose of this paper is to provide a reliable and accurate instrument to assess the supply chain risk of similar comparable industries. This enables the firms which fall in…

3975

Abstract

Purpose

The purpose of this paper is to provide a reliable and accurate instrument to assess the supply chain risk of similar comparable industries. This enables the firms which fall in this category of industry to identify and incorporate suitable risk sources under various risk constructs. This paper also provides a framework to the top management to prioritize the various risk constructs.

Design/methodology/approach

A systematic approach is used to develop and validate an instrument for assessing overall risk of supply chain. This includes specifying the domain and dimensionality of a construct, generation of initial pool of items, refinement of the initial items by the expert group, assessment of content validity, evaluation of reliability and construct validity of the scale items. Also a higher order measurement model of structural equation modeling is used to prioritize the various risk constructs.

Findings

The process yielded a robust instrument to assess overall risk of the supply chain. Through empirical verification, this instrument is shown to exhibit high levels of reliability and validity. The framework for prioritization of risk constructs revealed the importance of various supply chain risk constructs.

Practical implications

The framework is intended to be useful in practice for assessment of overall risk of heavy engineering industries supply chain. The procedure will be extended for development of risk assessment instrument for other industries which shares a common risk profile. Prioritization of various risk constructs with respect to the overall risk enables the top management to focus their attention to plan and manage the supply chain risks based on their relative importance.

Originality/value

This paper fulfils an identified need for the development of an empirically validated instrument by identifying the significant supply chain risk sources under major supply chain risk constructs for assessing the supply chain risk of industries which are similar in their risk profiles. Also provides a higher order model to identify the most influential risk constructs.

Details

Benchmarking: An International Journal, vol. 20 no. 1
Type: Research Article
ISSN: 1463-5771

Keywords