Search results

1 – 2 of 2
Open Access
Article
Publication date: 13 February 2024

Luigi Nasta, Barbara Sveva Magnanelli and Mirella Ciaburri

Based on stakeholder, agency and institutional theory, this study aims to examine the role of institutional ownership in the relationship between environmental, social and…

Abstract

Purpose

Based on stakeholder, agency and institutional theory, this study aims to examine the role of institutional ownership in the relationship between environmental, social and governance practices and CEO compensation.

Design/methodology/approach

Utilizing a fixed-effect panel regression analysis, this research utilized a panel data approach, analyzing data spanning from 2014 to 2021, focusing on US companies listed on the S&P500 stock market index. The dataset encompassed 219 companies, leading to a total of 1,533 observations.

Findings

The analysis identified that environmental scores significantly impact CEO equity-linked compensation, unlike social and governance scores. Additionally, it was found that institutional ownership acts as a moderating factor in the relationship between the environmental score and CEO equity-linked compensation, as well as the association between the social score and CEO equity-linked compensation. Interestingly, the direction of these moderating effects varied between the two relationships, suggesting a nuanced role of institutional ownership.

Originality/value

This research makes a unique contribution to the field of corporate governance by exploring the relatively understudied area of institutional ownership's influence on the ESG practices–CEO compensation nexus.

Article
Publication date: 16 April 2024

Rahadian Haryo Bayu Sejati, Dermawan Wibisono and Akbar Adhiutama

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor…

Abstract

Purpose

This paper aims to design a hybrid model of knowledge-based performance management system (KBPMS) for facilitating Lean Six-Sigma (L6s) application to increase contractor productivity without compromising human safety in Indonesian upstream oil field operations that manage ageing and life extension (ALE) facilities.

Design/methodology/approach

The research design applies a pragmatic paradigm by employing action research strategy with qualitative-quantitative methodology involving 385 of 1,533 workers. The KBPMS-L6s conceptual framework is developed and enriched with the Analytical Hierarchy Process (AHP) to prioritize fit-for-purpose Key Performance Indicators. The application of L6s with Human Performance Modes analysis is used to provide a statistical baseline approach for pre-assessment of the contractor’s organizational capabilities. A comprehensive literature review is given for the main pillars of the contextual framework.

Findings

The KBPMS-L6s concept has given an improved hierarchy for strategic and operational levels to achieve a performance benchmark to manage ALE facilities in Indonesian upstream oil field operations. To increase quality management practices in managing ALE facilities, the L6s application requires an assessment of the organizational capability of contractors and an analysis of Human Performance Modes (HPM) to identify levels of construction workers’ productivity based on human competency and safety awareness that have never been done in this field.

Research limitations/implications

The action research will only focus on the contractors’ productivity and safety performances that are managed by infrastructure maintenance programs for managing integrity of ALE facilities in Indonesian upstream of oil field operations. Future research could go toward validating this approach in other sectors.

Practical implications

This paper discusses the implications of developing the hybrid KBPMS- L6s enriched with AHP methodology and the application of HPM analysis to achieve a 14% reduction in inefficient working time, a 28% reduction in supervision costs, a 15% reduction in schedule completion delays, and a 78% reduction in safety incident rates of Total Recordable Incident Rate (TRIR), Days Away Restricted or Job Transfer (DART) and Motor Vehicle Crash (MVC), as evidence of achieving fit-for-purpose KPIs with safer, better, faster, and at lower costs.

Social implications

This paper does not discuss social implications

Originality/value

This paper successfully demonstrates a novel use of Knowledge-Based system with the integration AHP and HPM analysis to develop a hybrid KBPMS-L6s concept that successfully increases contractor productivity without compromising human safety performance while implementing ALE facility infrastructure maintenance program in upstream oil field operations.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 2 of 2